A new station at Crews Hill New Town
The new Conservative majority government of Enfield opposes this project and it is almost certainly not going ahead, so we can say goodbye to that.
Is that not because of the differential between the number of platforms serving the ECML in addition to Thameslink being 13 - 11 at London King’s Cross and 2 at Moorgate versus just 4 serving the Midland Mainline at London St Pancras.
It isn't 14tph v 6tph though - the 6 x GN Thameslink services are supplemented by 10tph from Moorgate and 8tph from King's Cross so it's not a like for like comparison. That's an awful lot of trains for a part of the network which "seems to be forgotten" as you put it.
This 'awful lot' of trains is still a lot less than the MML. That's why I originally raised my point on the allocation. I actually don't want anything more than 8tph through the core to the ECML with the infrastructure staying as is. Here's the service at major stations compared (MML vs ECML):
Suburban stations - ECML wins-ish - 4tph off-peak vs 2-4tph peak, 4tph peak vs 4-8tph peak
- Suburban - 4tph semi-fast, 4tph slow (Hendon & Cricklewood slow only), vs 2tph semi-fast (Ally Pally, New Barnet, Potters Bar, Hatfield only), 2-6tph slow
- St Albans vs Welwyn - 4-6 fast, 4 semi-fast, 4 slow (total 18), vs 2 semi-fast, 2-4 slow (total 6)
- St Albans vs Hertford - as above, vs 2-6 slow
- Luton vs Stevenage - 4-6 fast, 4 semi-fast (total 14), vs 4 fast, 2 semi-fast, 2 slow (total 8)
- Bedford vs Cambridge - Cambridge obviously wins, but the current Cambridge timetable means almost every Ely/Kings Lynn train that needs to split/join is delayed, and this has knock-on effects
As you can see there is a big discrepancy in service and one of the reasons is that all the TL capacity is used up by the MML. Which is understandable as there's nowhere else for MML trains to go, and would be fine if the ECML made up for it with KGX terminators, but it doesn't. And as I mentioned earlier, the Dec 2025 timetable means there is essentially no space left at KGX.
I think simpler and higher frequency is a far better practice than this '2tph from everywhere to everywhere' fetish people have here - per the Southeastern routes too.
Ultimately this is nothing more than a cost saving measure which doesn't work. Instead of expanding termini, let's send literally everything everywhere and hope it works... basically the current Thameslink network. Cross-city lines work very well until they start going way out of cities.
In theory this way it might be possible to do something like 4tph Gordon Hill, 4tph Hertford North and 2tph Stevenage like you say.
The envisaged peak service with the 717s was 2tph Stevenage, 6tph Hertford, 2tph Gordon Hill. In 2019 it was very similar except the total frequency was 8tph, I can't remember if this was because the Gordon Hill terminators didn't exist or something. It is currently 6tph to Hertford in the morning peak but confusingly not the evening, though ETUG says this will change in December.