They look really impressive, interesting that Andy Lord seems confident that a Bakerloo follow on order will happen.
They look really impressive, interesting that Andy Lord seems confident that a Bakerloo follow on order will happen.
Indeed, especially as he said the government funding has been confirmed (which I didn't realise). I doubt he would be saying that publicly unless he was confident, so fingers crossed it's good news soonThey look really impressive, interesting that Andy Lord seems confident that a Bakerloo follow on order will happen.
Southwark Council confirm online the funding from HMG as part of a four year settlement. They also state that it will enable TfL to exercise time-limited options in the current Siemens contract.Indeed, especially as he said the government funding has been confirmed (which I didn't realise). I doubt he would be saying that publicly unless he was confident, so fingers crossed it's good news soon
Wonder how the bakerloo line train delivery/blockade fits in with the 4 yr funding window. Judging by the experience of the PLU, the BLU infrastructure works contracts need to get into gear v soon.
Re your second sentence, yes and no given how unique, courtesy of historical legacy, each of the tube lines seems to be. I imagine that the answer to your last sentence is at least as much as the Picc, particularly if they do any preparation work for the extension.Constructing of the trains should be much quicker and easier than for the Piccadilly Line. Most of the tricky design and development will be basically done. The question is how much infrastructure works need to be done.
They look really impressive, interesting that Andy Lord seems confident that a Bakerloo follow on order will happen.
The extension will be years away, so I doubt they'll do much work they don't have to, just the bare minimum to get the new trains into service.Re your second sentence, yes and no given how unique, courtesy of historical legacy, each of the tube lines seems to be. I imagine that the answer to your last sentence is at least as much as the Picc, particularly if they do any preparation work for the extension.
Yes Bakerloo sets are virtually same, just things like different colour handrails.I assume with the extension, they'll just order variants of the 2024 stock unless they think 36 trains will be enough.
That would be the logical separation.How would re signalling on the Bakerloo work? I assume it would be Queens Park to E&H which is resignalled to ATO, with the line North of Queens Park remaining as is due to this not being in LU's control
Maybe not at the moment, but once the extension happens, i can see the need. It might also be an idea to resignal the Lionesses line to allow more bakerloo trains beyond queen’s park.Does the Bakerloo really need to be re signalled? Is the demand justified?
Is the question does it need doing as worn out, or is it to boost capacity.Absolutely. Although I assume resignalling on the Piccadilly will come at some point, perhaps after a good 10 years in service (As was the case for the very earliest of the S Stock).
Does the Bakerloo really need to be re signalled? Is the demand justified?
Hate to scare you but your last para refers to what happened around 50 years ago. As far as l know precious little has been done to the signalling since. That provides no real basis for going forward.Is the question does it need doing as worn out, or is it to boost capacity.
I have forgotten exact percentages now, but for Piccadilly line was stated as part of new trains justification, would give around 11% capacity boost from new train type, 12% from raising 24 to 27 trains per hour and another 33% if resignalled and upto 36tph. Compounding the percentage capacity of all three changes is about 168% capacity compared to now.
I do not know how much growth Bakerloo will need (unless line is extended), but bear in mind before the Jubilee line took over Baker Street - Stanmore, was operating at nearer 29tph on Baker Street - Elephant section. Unless the signalling has been rationalised in recent years then could be a frequency increase on this section without resignalling (although not practical whilst capacity Baker Street - Queens Park isn't raised to match it)
Maybe not at the moment, but once the extension happens, i can see the need. It might also be an idea to resignal the Lionesses line to allow more bakerloo trains beyond queen’s park.
Lioness line has junctions with other NR lines at Watford Jn, Willesden Jn, Camden Jn, and shares lines B and C into Euston. The NR lines will at some point be converted to ETCS L2.Tbh I don’t see why the lioness line would even be hard to signal to ato type signal as it’s separated like a tube line
The decision will need to consider if ETCS L2 can provide the necessary capacity on the Bakerloo (I suspect it can't), whether ETCS L3 (or what was L3, I think it's now been merged into L2) will be sufficiently developed by that point (unlikely, but you never know) for Tube AND LO, and if neither of those are true, what the easiest transition between the chosen CBTC system and ETCS L2 is.Do you think LUL might base any Bak line signalling replacement strategy on Network Rail digital railway/ETCS systems?
ECTS Level2 has been used for 110 second headways in Switzerland.Lioness line has junctions with other NR lines at Watford Jn, Willesden Jn, Camden Jn, and shares lines B and C into Euston. The NR lines will at some point be converted to ETCS L2.
You could conceivably remove the Watford crossover but there's still the Willesden Jn interface (for the connection to Mildmay Line and the Depot) and interface between Queen's Park and Camden Jn.
The decision will need to consider if ETCS L2 can provide the necessary capacity on the Bakerloo (I suspect it can't), whether ETCS L3 (or what was L3, I think it's now been merged into L2) will be sufficiently developed by that point (unlikely, but you never know) for Tube AND LO, and if neither of those are true, what the easiest transition between the chosen CBTC system and ETCS L2 is.
Is that going to be sufficient for the lifetime of the signalling system?ECTS Level2 has been used for 110 second headways in Switzerland.
Thats 32.7 trains per hour, so should comfortably handle a mix of say 20 Bakerloo and Overground trains per hour north of Queens Park
Picadilly Line Upgrade One Person Operation (OPO) CCTV Variation to the contract to deliver the new OPO CCTV System required to capture and display in ‘real time’, images of the Platform Train Interface within the 24TS cab, to enable visibility to the Train Operators. The variation includes maintenance of the system once operational, amendment to the contract pricing mechanism and novation of the contract from Panasonic to Alan Dic Communications Ltd.
The PLU Programme team is working towards the first train entering passenger service between December 2026 and June 2027
In which document is this?Did notice the forecast for Bakerloo new trains is 2032 which suggests if TfL orders the 2024 stock from Siemens this year then once the PLU is done, Siemens won't have a gap in production.
The TfL Board Programmes and Investment Committee papers, the link is in @Snow1964 post above mineIn which document is this?