hexagon789
Veteran Member
Couple times from memory.Has this happened since the addition of a Birmingham International call?
Couple times from memory.Has this happened since the addition of a Birmingham International call?
Of course, Caledonian Sleeper will not be a part of GBR.Well, GBR SHOULD mean that, with an integrated network, tickets are interchangeable/accepted on any service run by GBR - fares integration is a fundamental part of a sensible network and a topic which has been high on the list of demands for overall railway improvements by disgruntled passengers.
Well, the previous official set-down was at Crewe - at which point it was still less than 2 hours late - I’d probably therefore still have been on. I feel particularly sorry for anyone who’s been enduring the seated accommodation since Fort William!It seems to have taken 44 minutes to crawl from Lea Hall to International, so presumably CS have opted to dump it there (until recovered), rather than incur any more delays to Avanti and LNR.
Presumably they'll have some massive bills from other operators as well DR to their own passengers. It was 355 late at International - I wonder if anyone was still on board?
Don't the Fort William seated passengers have to stretch their legs by changing carriages at Waverley?Well, the previous official set-down was at Crewe - at which point it was still less than 2 hours late - I’d probably therefore still have been on. I feel particularly sorry for anyone who’s been enduring the seated accommodation since Fort William!
I seem to recall a tender was issued last year, but that doesn't mean the winning bid won't be a renewal of the present contract.Hmm the 92s not have great time lately, when is the contract for traction supplier up again?
Delay repay is compensation for your late arrival, when the TOC has got you to your destination but late. CS should refund any and all extra tickets that pax have been forced to buy, in addition to paying whatever level of DR is owed, based on their actual arrival time at destination (Euston or possibly beyond). Did CS eventually arrange ticket acceptance on Avanti when any remaining passengers were chucked off at International?presumably the delay repay for the Sleeper will cover this. It's a shame that there isn't automatic ticket acceptance when a train is 120 mins late. Maybe this is the kind of thing that GBR will fix...
What a complete disaster from Cally. Is 355L a new record for tardiness on the UK rail network?
Sadly not (it should be, as should all current TOCs), but that should still not prevent a sensible fares policy for ALL TOCs.Of course, Caledonian Sleeper will not be a part of GBR.
On our trans-Canadian rail trip in 2000, our train west from Winnipeg was 18hrs late...!Not even close. CS have had one 600+ late never mind anyone else
from just a few weeks ago:Is 355L a new record for tardiness on the UK rail network?
And my father's travel from Istanbul to Paris in the 1960s was a full day late...Sadly not (it should be, as should all current TOCs), but that should still not prevent a sensible fares policy for ALL TOCs.
== Doublepost prevention - post automatically merged: ==
On our trans-Canadian rail trip in 2000, our train west from Winnipeg was 18hrs late...!
Back in the 80s my dad was the guard on an Inverness - Aberdeen service that was over 24 hours late getting into Aberdeen after getting stuck in a snow drift near Huntly.What a complete disaster from Cally. Is 355L a new record for tardiness on the UK rail network?
They’d have had 51 minutes in the small hours, though may not have known it was going to be longer than 20.Don't the Fort William seated passengers have to stretch their legs by changing carriages at Waverley?
I’ll see your 355 minutes and raise you a 10 1/2 hours on the old Arrivals board at Glasgow Central.What a complete disaster from Cally. Is 355L a new record for tardiness on the UK rail network?
What a complete disaster from Cally. Is 355L a new record for tardiness on the UK rail network?
There's not really anything else capable of doing the job. 92s were designed with exactly this sort of work.Hmm the 92s not have great time lately, when is the contract for traction supplier up again?
I doubt that they'd have had much time on the platform. I watched the shunt from the outside once. The Fort William seated passengers were locked in until all 18 coaches were coupled together, then released to swap carriages, doors locked, the surplus two carriages uncoupled and the train dispatched.They’d have had 51 minutes in the small hours, though may not have known it was going to be longer than 20.
I'm sure there was a similar delay in the snow in the New Forest a few years agoNo, not by far. In 1963 passengers were trapped on a train for 11 hours - I make that 660 minutes.
9M50 (and I think possibly one other) went into New Street, reversed back up to Stafford then reversed again to come up the Trent Valley.At least from reading this thread I've realised what was going on this morning.
I travelled on 9M50 today (06.52 ex Edinburgh) and alighted at Stafford about 13 late.....just late enough to miss my fast LNR Crewe service to MKC in fact. However, thanks to the long stop at New St, it left 1 early and reached Grand Central Jn 1 early before disappearing off the route and re-emerging again at Rugby Trent Valley jn 84 late.
It must have been rerouted around the dead 1M16......and I see a couple of the other AWC Birmingham Euston services did the same.
Anyone know what route they took after Grand Central jn??
Thanks. So did they go down to Grand Jn so they could go back via Bescot? And, if so, would it not have been simpler to go across to Rugeley TV and reverse there?9M50 (and I think possibly one other) went into New Street, reversed back up to Stafford then reversed again to come up the Trent Valley.
What a complete disaster from Cally. Is 355L a new record for tardiness on the UK rail network?
Didn't touch Grand Jn- reversed in New Street platform and went back north via Sandwell & Wolves.Thanks. So did they go down to Grand Jn so they could go back via Bescot? And, if so, would it not have been simpler to go across to Rugeley TV and reverse there?
I imagine a suitably-fitted 66 or a pair of almost any other locos could do it, as the CS doesn't need to get much above 75mph. Diesel is far from ideal of course, but it's an option.There's not really anything else capable of doing the job. 92s were designed with exactly this sort of work.
I doubt that they'd have had much time on the platform. I watched the shunt from the outside once. The Fort William seated passengers were locked in until all 18 coaches were coupled together, then released to swap carriages, doors locked, the surplus two carriages uncoupled and the train dispatched.