Thanks for the reply. My thoughts on HS2 haven't really changed over the years, except in levels of increasing despair about the whole thing. I will attempt to summarise my thoughts as follows, to explain why I remain unhappy with HS2, and indeed with those who find it so hard to accept that it should have been done differently right from the start.
Fundamentally, I have never doubted that a new North-South route is essential for the UK - I have often taken an interest in designing a route, well before HS2 was announced. However, there are many on this forum who seem to enjoy a default position of labelling any proposal that disagrees with their own, as being that of a crayonista, without really giving sufficient thought to anything else.
For the benefit of those who might believe I have insufficient knowledge due to not being a railway employee, my career was in land transport generally, with plenty of rail involvement. Indeed I might counter that those involved directly in the rail industry might not be as aware as they should be, about all surrounding issues.
I have never been convinced that the right route is via the Chilterns. The North-South population centres lie close to the M1 corridor, which is why that route should have been given a good deal more credibility than it ever was.
The Chiltern route was chosen for 3 reasons, perhaps anyone who disagrees could explain why they do. In no particular priority order these were
Because of fewer population centres and therefore a perception of less resistance
In order to serve Heathrow as a means of gaining political support so that a third runway could be avoided. Boris, with his interests lying strongly in the Uxbridge area, was aspiring to become London mayor just when the route was being proposed. Coincidence? I don’t think so. Later, “serving” was changed to running nearby.
Because almost 100% of the emphasis was put on providing capacity relief to London-Birmingham, with the benefits to Manchester, Leeds and beyond being very much add-ons. Phases 2a and 2b were designed with Phase 1 being a given, so the easiest route to Birmingham was chosen as first priority
With this reasoning, the disasters that followed were always going to happen. The resistance to the Chiltern route was grossly underestimated, and with the “hindsight” (which was actually forewarned but dismissed along with other “crayonista” thinking), the expensive tunnelling isn’t so far off what would have been needed for the M1 route.
With the funding having rocketed, Phases 2a and 2b were always going to be vulnerable. Starting in the north would have completely avoided this because London was never going to miss out under any circumstances.
Birmingham should have been served by a spur, not as the terminal point of Phase 1. The fundamental benefit of capacity relief for WCML would have achieved this, but placing capacity relief for London-Birmingham as the main priority for an HSR project for the UK was always ill-conceived.
There were always better ways of relieving the southern section of the WCML, rather than designing an HSR scheme for the whole of the UK around it.
I don’t doubt for a moment that some will disagree with me, but I’m always happy to listen to their reasoning!