It really wasn’t. It was conceived as a thrusting high speed line to be extra fast and extra speedy to get people between London and the north west much faster. The business case was predicated on the financial benefits to the north west and the West Midlands.HS2 was conceived from the very beginning as a WCML relief line.
It’s only now people are questioning the cost that suddenly it’s an essential relief line for the WCML. A relief line that won’t accept freight, won’t accept local passengers, and is designed at speeds 100km/h higher than they need to be. A relief line with a bespoke train fleet (since cancelled at great expense) that can’t run on other lines. And a relief line for a WCML which is so terribly overcrowded that, er, they’ve allowed an OA operator to start running 6-carriage trains into London in the peaks.
They tried to claim it was an essential relief line for the ECML too, at least until the bit to the north east was cancelled. Turns out it wasn’t that essential after all.