The V1 timetable in the middle of the day was for Monday to Friday was already 3 to 4 minutes so it might be the V2

Edit: It seems to be peak time only where the V1 is every 4 minutes, so it does actually make a lot of sense if they made it all day
Following on from this why is the 348 every 20 minutes when it used to every 12-15 minutes before COVID
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

TheGrandWazoo

Veteran Member
Joined
18 Feb 2013
Messages
22,842
Location
Somerset with international travel (e.g. across th
The V1 timetable in the middle of the day was for Monday to Friday was already 3 to 4 minutes so it might be the V2

Edit: It seems to be peak time only where the V1 is every 4 minutes, so it does actually make a lot of sense if they made it all day
With the V1 being every 4 in peak anyway, it wouldn't need any additional vehicles to do it all day (in fact, it needs fewer as off peak journeys are about 10 mins quicker) but if they're upping the V2 in peak...
 

jeffery9098

On Moderation
Joined
16 Sep 2023
Messages
45
Location
Manchester
The V1 timetable in the middle of the day was for Monday to Friday was already 3 to 4 minutes so it might be the V2

Edit: It seems to be peak time only where the V1 is every 4 minutes, so it does actually make a lot of sense if they made it all day
Well yeah, Majority of public have been complaining at vantage 'lack of capacity' for years and the response was from GNW was to throw in some B9TL's because throwing more B5LH defeats the argument with 'reliability' being tied to operating those complicated and expensive hybrids. Even the B9TL's break down occasionally to the point where they get towed back to the depot on a lorry whilst braking down on the guided-busway itself!!! But hey at least, Salford Roads might get an improvement with these 19.5tons beasts are smashing themselves into the potholes making them bigger and creating the roads unsustainable for until council intervention and then 'resurfacing' so there's are benefits to it for road-users.


There's like speculation relating to the E200MMC's SK73 batch where they are intended to go onto 20/21/22/520 boards to replace the aging relics. Mainly because routes that were buried on like 575/576/524 (maybe 501 but it's technically an circular so it's defeating the argument) would eventually need double-deckers if the ridership increases and too much problems with Citaro's, B7RLE's and the lawnmowers (*E200 Classics*). You can tape up a bus as much you can but it'll eventually come to the point you have to break even and let it end peacefully to Barnsley rather than slaughtering until the wheels fall off or the retarder slips on majority of them. 3 out of 13 buses used for 575/576 do require a double-decker so it says something compared to 524 just states single-decker less than 7 years old (same with 501).


I can't see them running electric buses on 21/22 anytime soon, until they figured on what electric-single/double decker that weighs less than 18tons "weight-restriction bridge" but remember it'll most likely an TfGM order so it'll down to them.
 

stan claire

Member
Joined
26 Feb 2022
Messages
119
Location
BuckshawParkwa
3 out of 13 buses used for 575/576 do require a double-decker so it says something compared to 524 just states single-decker less than 7 years old (same with 501).
575 has had a massive improvement recently, all buses on 575 were double deck yesterday and most on 576 until 3442 was swapped for 4129 later in the evening, for the past week or so I’ve seen way more deckers on these two
501 is ridiculous and needs something sorted out ASAP, I always see people getting turned away at the bus station after a single decker rocks up at the height of rush hour and it’s still well-used in the off-peak as it’s the main route from town to the hospital
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,435
Location
Northern England
Well yeah, Majority of public have been complaining at vantage 'lack of capacity' for years and the response was from GNW was to throw in some B9TL's because throwing more B5LH defeats the argument with 'reliability' being tied to operating those complicated and expensive hybrids. Even the B9TL's break down occasionally to the point where they get towed back to the depot on a lorry whilst braking down on the guided-busway itself!!! But hey at least, Salford Roads might get an improvement with these 19.5tons beasts are smashing themselves into the potholes making them bigger and creating the roads unsustainable for until council intervention and then 'resurfacing' so there's are benefits to it for road-users.
The capacity increase on the busway is TfGM's responsibility, GNW just operates what they are contracted to by TfGM. New buses take time to plan, order and build so putting some old vehicles on is a much better outcome than delaying improvements for several years.

It all seems to have been handled quite sensibly from my perspective: a need was identified for increased capacity so it was provided using the buses that were available, while a new order was planned that was large enough to deliver the full service with new buses.

Any bus will occasionally break down and have to be towed, and of course if it's operating on the busway at that point then it will block the busway. That's more of a flaw with the concept of a busway than anything else: all the inflexibility of a tramway with all the inefficiency or buses!

Probably Volvo's I know Stagecoach are due more Volvo's and they are due Electroliner's most likely for Oldham.
Hyde Road is no longer operated by Stagecoach.
 

JasonL

Member
Joined
13 Nov 2024
Messages
216
Location
Earlestown, Merseyside
The capacity increase on the busway is TfGM's responsibility, GNW just operates what they are contracted to by TfGM. New buses take time to plan, order and build so putting some old vehicles on is a much better outcome than delaying improvements for several years.

It all seems to have been handled quite sensibly from my perspective: a need was identified for increased capacity so it was provided using the buses that were available, while a new order was planned that was large enough to deliver the full service with new buses.

Any bus will occasionally break down and have to be towed, and of course if it's operating on the busway at that point then it will block the busway. That's more of a flaw with the concept of a busway than anything else: all the inflexibility of a tramway with all the inefficiency or buses!


Hyde Road is no longer operated by Stagecoach.
I meant Volvo's for Stagecoach and Electroliner's for Stagecoach. It's not known what Hyde Road will receive.
 

mattyharding

On Moderation
Joined
14 Dec 2024
Messages
199
Location
Stalybridge
There are a few routes like that, 632 was every 15 pre COVID (as the 362).
I wish the 348 would go back to being every 12-15 minutes especially in rush hour as some services fill up fast with school kids as the 348 passes two secondary schools

== Doublepost prevention - post automatically merged: ==

Do we know when the Stagecoach Electroliners are due to arrive in England
 
Last edited:

M60lad

Established Member
Joined
31 May 2011
Messages
1,552
Not to sure what's wrong with it but just seen what I think is Diamond Northwest's 21241 Mellor Orion on a flatbed wagon heading up A663 Broadway this morning whether it was heading back to Rochdale I'm not to sure as only saw it from my room and didn't catch the name that was on the wagon.
 

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,129
Location
Atherton, UK
Not to sure what's wrong with it but just seen what I think is Diamond Northwest's 21241 Mellor Orion on a flatbed wagon heading up A663 Broadway this morning whether it was heading back to Rochdale I'm not to sure as only saw it from my room and didn't catch the name that was on the wagon.
I mean, it’s a Mellor bus so the list of what’s wrong is potentially endless :D
 

Leyland Bus

Member
Joined
20 May 2021
Messages
1,163
Location
York
The first new Vantage has now landed in the form of 2301 LV26 ZPJ. The bus features high backed seats upstairs (very similar to the current Vantage fleet) and two tables, whilst downstairs has standard bus seats but trimmed in grey e-leather.
 

mattyharding

On Moderation
Joined
14 Dec 2024
Messages
199
Location
Stalybridge
The first new Vantage has now landed in the form of 2301 LV26 ZPJ. The bus features high backed seats upstairs (very similar to the current Vantage fleet) and two tables, whilst downstairs has standard bus seats but trimmed in grey e-leather.
Those seats upstairs look like something you'd find in 1st Class on a train
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,585
Location
Greater Manchester
The first new Vantage has now landed in the form of 2301 LV26 ZPJ. The bus features high backed seats upstairs (very similar to the current Vantage fleet) and two tables, whilst downstairs has standard bus seats but trimmed in grey e-leather.
Is there an expected date for these to enter service? I'll definitely be looking to have a go on one.
I'm used to train introductions where the answer would be several years, I assume it's not the same for buses (maybe a couple months)?
 

Leyland Bus

Member
Joined
20 May 2021
Messages
1,163
Location
York
Is there an expected date for these to enter service? I'll definitely be looking to have a go on one.
I'm used to train introductions where the answer would be several years, I assume it's not the same for buses (maybe a couple months)?
As a new bus, it should only be a week or two depending on any issues arising (which some have had and is completely normal) but with these, I don't know if TfGM want to do a launch with afew of them or if they'll just go straight out when ready. I'm off now til Wednesday but i'll try find out...
 

aswilliamsuk

Member
Joined
10 Jul 2016
Messages
527
I can’t see anywhere in the article where it says they are replacing all the hybrids and B9s with 100 buses
It was previously announced that agreement had been reached to fund 220 electric buses to complete conversion of both Hyde Road and Oldham, and so far there have been orders for 55 and then 125 from Wrightbus (80 for Oldham - 64 deckers and 16 singles; and 100 for Hythe Road), which suggests there's another 40 vehicles to be announced. I wonder if ADL might benefit from that? I'd be surprised if there weren't more singles to come in particular...
 

mattyharding

On Moderation
Joined
14 Dec 2024
Messages
199
Location
Stalybridge
It was previously announced that agreement had been reached to fund 220 electric buses to complete conversion of both Hyde Road and Oldham, and so far there have been orders for 55 and then 125 from Wrightbus (80 for Oldham - 64 deckers and 16 singles; and 100 for Hythe Road), which suggests there's another 40 vehicles to be announced. I wonder if ADL might benefit from that? I'd be surprised if there weren't more singles to come in particular...
I think Oldham's future fleet will consist of ADL E400 EVs, the 50 BYDs we have, Streetdeck Electroliners, GB Kites and possibly BZLs in the future if the rumours of the Streetdecks going to Stockport once they get electric buses become true
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,435
Location
Northern England
According to Bustimes, Metroline currently has 90 'classic' E400 hybrids, 14 of the Volvo E400s hybrids, and 34 Volvo B9TLs.
Of those, 7 are the driver training buses and a further 10 haven't been in service for several months. So that gives a total of 121 "legacy" pre-franchising buses still in passenger service with Metroline.

100 really isn't far off being able to replace them all, especially when you consider that EV deliveries to the rest of Manchester are in some cases making relatively modern buses available for cascade. And there are of course more orders to come.

Also the legacy buses are quite old, haven't been painted yellow or fitted internally to TfGM's interior spec, and come October they won't even be legal to operate any more as they won't meet the accessible information regulations.

Considering all of that, if I were a gambling man, I'd not be betting on hybrids and B9s being on the streets of Manchester many more months...
 

mattyharding

On Moderation
Joined
14 Dec 2024
Messages
199
Location
Stalybridge
According to Bustimes, Metroline currently has 90 'classic' E400 hybrids, 14 of the Volvo E400s hybrids, and 34 Volvo B9TLs.
Of those, 7 are the driver training buses and a further 10 haven't been in service for several months. So that gives a total of 121 "legacy" pre-franchising buses still in passenger service with Metroline.

100 really isn't far off being able to replace them all, especially when you consider that EV deliveries to the rest of Manchester are in some cases making relatively modern buses available for cascade. And there are of course more orders to come.

Also the legacy buses are quite old, haven't been painted yellow or fitted internally to TfGM's interior spec, and come October they won't even be legal to operate any more as they won't meet the accessible information regulations.

Considering all of that, if I were a gambling man, I'd not be betting on hybrids and B9s being on the streets of Manchester many more months...
Same story with the B5LHs in Oldham (well the 61 plate ones anyway) as they turn 15 very soon and while yes the majority of them are yellow they are still showing their age with frequent breakdowns and just poor reliability
 

mayneway

Member
Joined
29 Mar 2024
Messages
884
Location
Manchester
There’s a couple of uplifts planned for Metroline in September. I know the 219 is getting a big PVR increase, along with a Hyde road service I can’t quite remember so that needs to be factored in.
 

mattyharding

On Moderation
Joined
14 Dec 2024
Messages
199
Location
Stalybridge
There’s a couple of uplifts planned for Metroline in September. I know the 219 is getting a big PVR increase, along with a Hyde road service I can’t quite remember so that needs to be factored in.
It's the 255 that you were referring to when you mentioned Hyde Road
 

jeffery9098

On Moderation
Joined
16 Sep 2023
Messages
45
Location
Manchester
It was previously announced that agreement had been reached to fund 220 electric buses to complete conversion of both Hyde Road and Oldham, and so far there have been orders for 55 and then 125 from Wrightbus (80 for Oldham - 64 deckers and 16 singles; and 100 for Hythe Road), which suggests there's another 40 vehicles to be announced. I wonder if ADL might benefit from that? I'd be surprised if there weren't more singles to come in particular...
ADL can't benefit it. The problem with AD Enviro400EV is that it's insufficient for charging capabilities. It's a good vehicle but hearing that stagecoach in different places can't charge more than 5 of them 'simultaneously' due to charging reasons because of hitting that limit that alerts the substations. I mean some the AD E400EV don't even get fully charge but partially charged so that they can charge the other(s) to a sufficient percent. With the Electroliners, It was focused in fast-charging capabilities rather than having highest total miles pes per charge. You can charge more than 20+ of them simultaneously and won't upset the grid. As there is limitations on how much kW's a depot can provide + you don't want to trip off the substations. ADL knows that market has shifted from total miles per charge to how fast a bus can charge more reliable and doesn't waste a lot. I believe they were previewing the AD E400EV with another battery that is focused on fast-charging capabilities. You don't want an electric-bus that would hog the infrastructure which would restrict limitations on how much electric buses you can charge overall.


With Hyde Road, it was alleged that they were going to get BD11's + Electroliners. It's a smart decision and choice with BD11's mainly for total miles having around 480miles per charge compared to Electroliners having 275miles so it's like you have a EV that can fast-charge and EV that doesn't need to charge that much and won't hog the lanes :D. Those streetdecks would end up going elsewhere in GM, I thought sharston because 'repower' came to mind but as with Stockport apparently gaining some then I would've of thought the logical choice is to eventually dump all of the needed BZL's 170 'existing' to Stockport rather having to order a large fleet of EV's.


If ADL are able to score a order then it'll likely be the Enviro200EV because the weight restriction of 18tons 'somewhere' in Swinton on 21/22 then sure Enviro200EV has a mgw of 17tons or under 18tons so :/.
 

M60lad

Established Member
Joined
31 May 2011
Messages
1,552
Does anybody know how old the ex First E300s are and how long they've got left in service before they need replacing?

Are there any plans to have next stop displays fitted to these as I know it can be done as I had a ride on a First Worcester one yesterday which had a proper next stop information screen fitted attached to the bulkhead behind the doors.
 

Leyland Bus

Member
Joined
20 May 2021
Messages
1,163
Location
York
Does anybody know how old the ex First E300s are and how long they've got left in service before they need replacing?

Are there any plans to have next stop displays fitted to these as I know it can be done as I had a ride on a First Worcester one yesterday which had a proper next stop information screen fitted attached to the bulkhead behind the doors.
The 13 plate ones Andrew? Registered in 2013 so making them 13 years old?
 