• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

First Greater Glasgow

jazza374

Member
Joined
2 Jan 2011
Messages
135
Location
Motherwell
I don't think the X44 will last the next round of Changes, Always only about 3 or 4 people you see on board
It’s not being helped with the roadworks in Glasgow causing late running up to 30 mins on some journeys and daily cancellations. If a new service is unreliable (which is not First’s fault) people will not use it.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
21 Aug 2017
Messages
1,016
Location
Glasgow
It’s not being helped with the roadworks in Glasgow causing late running up to 30 mins on some journeys and daily cancellations. If a new service is unreliable (which is not First’s fault) people will not use it.
It only has Cathedral Street closure on its route so it’s not that bad the X11 is still always packed
 

jazza374

Member
Joined
2 Jan 2011
Messages
135
Location
Motherwell
It only has Cathedral Street closure on its route so it’s not that bad the X11 is still always packed
Well it took over 20 mins yesterday to get from M8 to the bus station on the X44. The X11 is well established and more than one bus per hour so is better equipped to cope with the disruption to the timetable.
 

AilsaBus

Member
Joined
7 May 2023
Messages
101
Location
Scotland
Well it took over 20 mins yesterday to get from M8 to the bus station on the X44. The X11 is well established and more than one bus per hour so is better equipped to cope with the disruption to the timetable.

Delays due to roadworks and diversions are not First's faults, but cancellations are.
 

camro

Member
Joined
21 Dec 2024
Messages
124
Location
Glasgow
On Saturday 16th last I was at Asda Bishopbriggs and expecting to catch any number of First services (88, 89, 89B etc) into Buchanan at 0735, as I was due to catch a AWC London train from Central. The shelter display showed three of the aforementioned routes due in 3, 12 & 18 minutes. As the timers decreased and changed to ‘Due’, they dropped off the display and the bus never arrived. Interestingly, only 1 bus (an 88) passed in the opposite direction. After 45minutes there was a very real danger I’d miss my train so hot-footed it to Bishopbriggs Station to catch the train to Queen Street at 0828. All the while there were no buses in either direction and queues at the stops.

I did make my train with seconds to spare, and I emailled First CS asking what happened, and why (rather than show timetable timings) was there a countdown for a non-tracking bus? Their reply was apologetic but went onto say they had no details of any problem, but would ‘pass on’ my concern. Anyone know why the A803 became the ‘Twilight Zone’?
Saturday 16th was a heavily difficult day for the North side of First. The A803 had been shut for a week to allow resurfacing of the road, between the Westerhill Road lights and Cadder Roundabout.

Latterly we had been diverting via Inverary Drive where workers would move cones to let us get past the works at the roundabout, and vice versa to make it possible to do the full routes during the day. On Friday 15th at roughly 4:30 pm we were notified by the council that the roads would be fully shut on Saturday and that we would not be able to get past, which is not what had originally been agreed on.

At that point it was too late to change any running boards and we were forced to run on diversions in the morning via the motorway so that any 88 due to start it's duty in Harestanes could still start in Harestanes. By 9 am there were no more 88's starting from Harestanes but all the 89's were using the motorway to get to and from Kilsyth.

Only buses that had first done an outbound trip from Buchanan could then go on to do an inbound trip that served Bishopbriggs, but they would be subject to an hour or more of sitting time at the 57 terminus in Westerhill, because the timetable was still running as if buses were able to get past the works, so we couldn't start from Westerhill until the scheduled time of the inbound trip. This meant that there was probably no Glasgow bound bus at Bishopbriggs until around 8 am.

The road was completed that day and does look great, but I'd rather have lived with whatever potholes were there before than have dealt with that chaos.
 

Metal Mickey

Member
Joined
9 Nov 2021
Messages
365
Location
Scotland
Saturday 16th was a heavily difficult day for the North side of First. The A803 had been shut for a week to allow resurfacing of the road, between the Westerhill Road lights and Cadder Roundabout.

Latterly we had been diverting via Inverary Drive where workers would move cones to let us get past the works at the roundabout, and vice versa to make it possible to do the full routes during the day. On Friday 15th at roughly 4:30 pm we were notified by the council that the roads would be fully shut on Saturday and that we would not be able to get past, which is not what had originally been agreed on.

At that point it was too late to change any running boards and we were forced to run on diversions in the morning via the motorway so that any 88 due to start it's duty in Harestanes could still start in Harestanes. By 9 am there were no more 88's starting from Harestanes but all the 89's were using the motorway to get to and from Kilsyth.

Only buses that had first done an outbound trip from Buchanan could then go on to do an inbound trip that served Bishopbriggs, but they would be subject to an hour or more of sitting time at the 57 terminus in Westerhill, because the timetable was still running as if buses were able to get past the works, so we couldn't start from Westerhill until the scheduled time of the inbound trip. This meant that there was probably no Glasgow bound bus at Bishopbriggs until around 8 am.

The road was completed that day and does look great, but I'd rather have lived with whatever potholes were there before than have dealt with that chaos.
Almost the entire bus network would’ve been a shambles on 16th May due to the football crowds.
 

Buzby

Established Member
Joined
14 Apr 2023
Messages
1,651
Location
Glasgow, Scotland
The A803 was completely shut for a week between Westerhill Road and the retail park. With nowhere to turn the buses had to terminate at Bishopbriggs Cross.
That was only until Tuesday, priority was given to buses (only) and they used a private diversion along Inveraray Drive to bypass the closure. My issue is why, after 3 days of special working, they stopped on the Saturday yet the displays still showed them tracking.

== Doublepost prevention - post automatically merged: ==

The road was completed that day and does look great
The council mis-management of this requires an inquiry. The buses were off well past 0800, probably 0900 but the false dawn displays made the whole event more stressful. ScotRail saved the day!
 

sannox

Member
Joined
1 Mar 2016
Messages
649
All very true, especially the part about the roadworks/diversions. In my over 25 years living near Glasgow and having to commute into it regularly for the last 10 or so of those years, I genuinely can't remember it ever being as bad as it is now.
Union Street is hammering reliability for a lot of services. Routes are comfortably 10 minutes late by the time they get to the River.

Councils and politicians talk a good game about public buses but no support at all for them.
 

Buzby

Established Member
Joined
14 Apr 2023
Messages
1,651
Location
Glasgow, Scotland
Mayhem continues today… the Cathedral Street closure and subsequent diversions for all eastbound buses via a convoluted route meant my bus took 10minutes to get to Baird Street as tempers frayed. No matter which direction you travelled lane reductions and closures meant public transport was seriously impacted. This ‘Avenues Project’ better be worth it!
 

Strathclyder

Established Member
Joined
12 Jun 2013
Messages
3,819
Location
Clydebank
Union Street is hammering reliability for a lot of services. Routes are comfortably 10 minutes late by the time they get to the River.

Councils and politicians talk a good game about public buses but no support at all for them.
Of those, the 2 may see a slight improvement time-keeping at the western end as Faifley Road is due to close yet again (I think for at least the 3rd time this year; beginning to lose track of it all) for at least 2 weeks (starting from 1st June) due to it being partially resurfaced. Good for recovering a bit of lost time, but I and all bus users in Faifley are screwed by this no matter what route we need to get in/out of Faifley, as the 17 will by-pass Faifley entirely using the 'back-road' (aka Glasgow Road) and the 2 will do the same as far as Faifley Road, ducking in and out of the terminus before heading back down to Hardgate.

So in effect Faifley will lose it's bus service for a fortnight right when summer starts properly, thanks to the utter half-wittery going on at West Dunbartonshire Council. Both are about a 10 minute walk from my front door at the back of Faifley and while having to plan another 10 minutes at least into my journey time on top of what I was having to do before is getting to be more than a little exasperating, it's a overall mild inconvenience. For those less mobile than me, it's into a taxi they likey will get, as the nearest bus stop to them that hasn't been cut off is over a 10-15, maybe even 20 minute walk away. That or they either get a lift.

WDC may be skint, but at the same time, they seem to be going out of their way to inconvenience those of us who rely on the bus services up here.

Mayhem continues today… the Cathedral Street closure and subsequent diversions for all eastbound buses via a convoluted route meant my bus took 10minutes to get to Baird Street as tempers frayed. No matter which direction you travelled lane reductions and closures meant public transport was seriously impacted. This ‘Avenues Project’ better be worth it!
I'm not at all convinced it will be. It's a good enough idea in principle, but when the council and all other local government/transport bodies do jack-squat to incentivize increasing public transport use in the city beyond the usual boiler-plate press releases and statements all while car usage continues to increase despite the reduction in the number of available lanes at the likes of Cowcaddens Rd, expect traffic and therefore bus travel, to get even worse.
 
Last edited:

Fletcj10

Member
Joined
28 Apr 2023
Messages
151
Location
Reading
Probably been asked before but what's the height of the enviro 400's that normally do the route 6? is it 13-9?
 

JumpinTrainz

Established Member
Joined
30 Jul 2018
Messages
1,929
Noticed their has been no deckers on the 2 for 2 days in a row, how strange as it is a very buisy route
First have historically prioritised singles on the 2 over deckers. There are Yutong deckers due which I imagine will see service on the 2.
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,242
First have historically prioritised singles on the 2 over deckers. There are Yutong deckers due which I imagine will see service on the 2.
Same with the 3 service. I think it may come down to Scotstoun does not have many deckers to go around. I wonder if it is cheaper to run the 2 or 3 as all singles.
 

Top