Class 810 for East Midlands Railway Construction/Introduction Updates

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
Which is what they should be. The longest journey is two hours, and their main job is carrying the daily tidal flow into and back out of London.
Which has been my bone of contention for years and will continue to be.

As I’ve said many times before, if passengers are paying IC-level fares, they are entitled to an IC-level of comfort and service - doesn’t matter whether the entire length of the journey takes 20 minutes. People deserve what they pay for.

I have relatively little issue with the EMR’s Intercity operation effectively being a regional express sort of service (with a 170 refurb spec of interior) - but only as long as the fares reflect that.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jthjth

Member
Joined
10 Apr 2015
Messages
382
Had another trip on an 810 under the wires. Air conditioning was less intense than the last trip, but still noisy. The other thing I noticed was what appeared to be quite a lot of wind noise. Very similar to driving a car with the window open. This was the second coach from the front, the composite first/standard coach. Both this and the air conditioning doesn’t make for a peaceful trip. There were two travelling Hitachi staff poking at the doors, 1st class accessible toilet not working. Coach end doors, the ones between the saloon and the vestibule, not working. PIS displays not working. The seats in 1st do at least line up with the windows.

== Doublepost prevention - post automatically merged: ==

Which is what they should be. The longest journey is two hours, and their main job is carrying the daily tidal flow into and back out of London.
In Leicestershire at least the service provides a significant local service. Sixth form students communing between Market Harborough and Leicester as an example. The northbound service from Leicester also carries significant traffic judging by the numbers waiting on the platform.
 
Last edited:

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
EMR might as well have just tagged onto the 701 order then
Alternatively, a 110mph bi-mode derivative of the Class 385 or a Javelin spec if 125mph running had to be kept. And why even bother having first class if we want to put more focus on commuters for a short journey?

Whilst we’re shifting towards speculation with the most recent posts, to bring this back to being OT, I think I saw that 003/004 are no longer at Loughborough (though it was a very quick glance during the commute). Seems they’re no closer to 10-car operation?
 
Joined
6 Apr 2021
Messages
111
Location
North Wiltshire
Air conditioning was less intense than the last trip, but still noisy. The other thing I noticed was what appeared to be quite a lot of wind noise. Very similar to driving a car with the window open. This was the second coach from the front, the composite first/standard coach. Both this and the air conditioning doesn’t make for a peaceful trip.
That is disappointing. It is a known issue that was identified in the early days of 800 testing, but does not seem to have been resolved.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
My travel on 810s has been limited but I concur that the noise from the air-con fan (in the composite) is pretty intrusive, sounds like a very cheap desk fan with plastic bearings. I personally haven't noticed the wind noise, certainly a big improvement on an Avanti 80x in the front coach where it's very loud.
 
Joined
6 Apr 2021
Messages
111
Location
North Wiltshire
Air con noise or wind noise? If the latter, what causes it?
Sorry I should have been more specific, it was/is wind noise that appears to be generated by turbulence from the air-conditioning arrangement on the roof (it being somewhat less streamlined than that of the MkIII etc.).
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Had another trip on an 810 under the wires. Air conditioning was less intense than the last trip, but still noisy. The other thing I noticed was what appeared to be quite a lot of wind noise. Very similar to driving a car with the window open. This was the second coach from the front, the composite first/standard coach. Both this and the air conditioning doesn’t make for a peaceful trip.
Sorry I should have been more specific, it was/is wind noise that appears to be generated by turbulence from the air-conditioning arrangement on the roof (it being somewhat less streamlined than that of the MkIII etc.).
Is this wind noise the high pitched whistling type sound you’d hear if you didn’t realise you had a window slightly open and started driving on the motorway?
 

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
The air con, for me, is quite loud; but that did help in one respect. It stopped working for around 3 seconds near to Kilby Bridge - I’m assuming that’s the momentary lack of power during the swap-over between diesel & electric.
 

jthjth

Member
Joined
10 Apr 2015
Messages
382
Is this wind noise the high pitched whistling type sound you’d hear if you didn’t realise you had a window slightly open and started driving on the motorway?
Not high pitched. More akin to having the car window half open. There’s a mixture of that, which varies with train speed, and the continuous air con noise, which is like having your car’s blower fans on a high setting.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
Which is what they should be. The longest journey is two hours, and their main job is carrying the daily tidal flow into and back out of London.

The 800s were developed under the 'IEP'. The 'I' is a clue to expectations...
The criteria that high speed commuter stock is to be expected for journeys of around 2 hours (actually 2hr 8in for the fast Sheffields) suggests that London - Bristol and possibly London - Manchester (the fastest in the service pattern 2 hr 6 mins) don't deserve Inter City stock either. This might possibly be ontroversial, particularly In the case of the latter.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,899
Location
London
I believe Class 810s have recieved ORR Safety Approval Seal for 2x5 running aka 10 car formation. Still needs EMRs own final paperwork and then hopefully 10cars are running about on what is much needed capacity.

The letter below pulled from LinkedIn

THE RAILWAYS (INTEROPERABILITY) REGULATIONS 2011. AS AMENDED HITACHI RAIL CLASS 810 UPGRADE (MULTIPLE UNIT OPERATION

I refer to your application for authorisation, received on the 24" April 2026. Following review of your application, I can confirm that ORR grants authorisation under regulation 4(1) (a) of the Railways (Interoperability) Regulations 2011. as amended. This authorisation is for the upgraded Hitachi 810 units, as shown in Appendix A, to allow 2 x 5-car Multiple Unit Operation.

The restrictions or limitations of use on the structural subsystem are those contained on the Declaration of Verification 'HRL-EMR-SFA-CER-00005 (Class 810 EMR Trains DoV)' dated 24t April 2026 and contained in section 5.2 of your technical file, 'RTV-SNO198584-R015 Iss2' dated 15" April 2026. These are related to the Rolling Stock and Control. Command and Signalling structural subsystems.

Your Declaration according to Article 16 (EU) 402/2013 as amended, reference HRL-EMR- SFA-CER-00008 Issue 1.0 (Class 810 EMR CSM Art16 DecI)' dated 24" April 2026 references no open safety requirements at the time of application.
The rolling stock subsystem(s) authorised by this letter must be operated and maintained in accordance with Regulation 20.
 

jamie_r

Member
Joined
24 Jun 2014
Messages
35
I had my first journey on a Class 810 today (810012 to be precise) and it’s fair to say that it wasn’t smooth sailing!

First up, the horizontal PIS screen in my carriage was only half working, and on the half that was working the scrolling text was very juddery. There is a widescreen display just next to it, but from where I was sat the text was far too small and basically impossible to read. Seemed a bit sloppy for a new train but no big issue.

Then, the whole coach went through quite a horrible horizontal shaking at a few points from Bedford onwards (London-bound). It felt a bit like the ‘hunting’ you get on DLR trains but much stronger and faster. No idea what was going on but it definitely didn’t feel right!

I didn’t find the air conditioning noisy but it was a little warmer than I’d like on a day like today. So, how generous of EMR to cool us down by turning on the sprinklers in our carriage for about half of the journey! I‘m sure this has happened on other trains before but presumably it was water leaking from the air conditioning system? At first it was just two trickles of water from the ceiling, but by the time we‘d arrived at St Pancras there were 7 or 8 spots where water was dripping down, including some were a nasty shade of yellow. It’s baffling to me that this is an issue on trains so new, and in general that whatever the set-up was in the ceiling panels that escaping water could drip directly onto seats/passengers.
 

kevjs

Member
Joined
4 Sep 2013
Messages
469
Then, the whole coach went through quite a horrible horizontal shaking at a few points from Bedford onwards (London-bound). It felt a bit like the ‘hunting’ you get on DLR trains but much stronger and faster. No idea what was going on but it definitely didn’t feel right!
Heading northwards earlier this week on a Meridian had the same thing somewhere between Luton and Bedford - don't recall having that in the past!
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,935
Location
Wales (sometimes in England), thanks for replying!
I didn’t find the air conditioning noisy but it was a little warmer than I’d like on a day like today. So, how generous of EMR to cool us down by turning on the sprinklers in our carriage for about half of the journey! I‘m sure this has happened on other trains before but presumably it was water leaking from the air conditioning system? At first it was just two trickles of water from the ceiling, but by the time we‘d arrived at St Pancras there were 7 or 8 spots where water was dripping down, including some were a nasty shade of yellow. It’s baffling to me that this is an issue on trains so new, and in general that whatever the set-up was in the ceiling panels that escaping water could drip directly onto seats/passengers.
I'm pretty sure that something similar happened on the first day of service of Class 800 in late 2017. It didn't occur to me that it would happen on an 810 about 8-and-a-half years later.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,346
Location
Leicester
Heading northwards earlier this week on a Meridian had the same thing somewhere between Luton and Bedford - don't recall having that in the past!
The southern part of the MML is notorious for this. As you mentioned, particularly between Bedford and Luton. It's been happening for years with the 222s.
 

Dave61

Member
Joined
8 Mar 2026
Messages
151
Location
Long Eaton
I had my first journey on a Class 810 today (810012 to be precise) and it’s fair to say that it wasn’t smooth sailing!

First up, the horizontal PIS screen in my carriage was only half working, and on the half that was working the scrolling text was very juddery. There is a widescreen display just next to it, but from where I was sat the text was far too small and basically impossible to read. Seemed a bit sloppy for a new train but no big issue.

Then, the whole coach went through quite a horrible horizontal shaking at a few points from Bedford onwards (London-bound). It felt a bit like the ‘hunting’ you get on DLR trains but much stronger and faster. No idea what was going on but it definitely didn’t feel right!

I didn’t find the air conditioning noisy but it was a little warmer than I’d like on a day like today. So, how generous of EMR to cool us down by turning on the sprinklers in our carriage for about half of the journey! I‘m sure this has happened on other trains before but presumably it was water leaking from the air conditioning system? At first it was just two trickles of water from the ceiling, but by the time we‘d arrived at St Pancras there were 7 or 8 spots where water was dripping down, including some were a nasty shade of yellow. It’s baffling to me that this is an issue on trains so new, and in general that whatever the set-up was in the ceiling panels that escaping water could drip directly onto seats/passengers.
Oh dear, not an expert my any measure on aircon but my experience from cooling IT server rooms where the air-con turned into a waterfall would suggest problems in either getting rid of condensation on the cooling coils or they simply could not cope with the higher temperatures/humidity. And it is going to be way worse tomorrow
 

Mikw

Member
Joined
20 Apr 2022
Messages
545
Location
Leicester
So why all the door faults? Just been on 852019 from Nottigham. Lost about 15 minutes following a late running service, then a other few moments at Leicester because the doors wouldn't open.
What's causing this? Can't be a hard fix surely
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,778
Location
Somewhere, not in London
So why all the door faults? Just been on 852019 from Nottigham. Lost about 15 minutes following a late running service, then a other few moments at Leicester because the doors wouldn't open.
What's causing this? Can't be a hard fix surely
The primary reason is most likely...

Doors are too complicated and no-one really understands how they work any more, the knowledge is held behind layers and layers or intellectual property rights that no-one will share and the equipment layers all come with their own issues.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
So why all the door faults? Just been on 852019 from Nottigham. Lost about 15 minutes following a late running service, then a other few moments at Leicester because the doors wouldn't open.
What's causing this? Can't be a hard fix surely
For the 810s I wonder if Hitachi changed the door supplier from there usual internal sliding plug door.
K
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,155
Doors are too complicated and no-one really understands how they work any more, the knowledge is held behind layers and layers or intellectual property rights that no-one will share and the equipment layers all come with their own issues.
Or within boxes :D

But you are, of course, right on the money. Oftentimes it's the electronic door control unit rather than the door(s) itself.
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,856
Location
Devon
So why all the door faults? Just been on 852019 from Nottigham. Lost about 15 minutes following a late running service, then a other few moments at Leicester because the doors wouldn't open.
What's causing this? Can't be a hard fix surely

Can I just clarify, is 852019 the coach number?
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,301
Can I just clarify, is 852019 the coach number?
It is yes, it is the second carriage (motorcar) of unit 810019.

== Doublepost prevention - post automatically merged: ==

Observations at the factory this week.

Currently 810020 sat undergoing testing outside in yard.

810017, 021, 022 and 023 all been sat outside undergoing various tests, currently 022 is outside having work undertaken on its doors, with scaffolding structures to allow access.

Unit 810026 seen in a complete state been shunted between test sheds.

Still no idea where 002 is.
 