Been doing the rounds for a while now, it would allow LM to sneak some better paths in and more than likely get a Weedon path too.
Been doing the rounds for a while now, it would allow LM to sneak some better paths in and more than likely get a Weedon path too.
Presumably if just the /1s get cleared that would help get them back to running the /1 and /2 fleets as they should be- /1 for longer distances, /2s for locals? Or would a succesful test for the /1s automatically see both sub classes OK-ed?
Been doing the rounds for a while now, it would allow LM to sneak some better paths in and more than likely get a Weedon path too.
If they bypassed NMP (which I think Weedon path does) then where would they split. Alternatively could stations north of NMP cope with 12 car trains?
Been doing the rounds for a while now, it would allow LM to sneak some better paths in and more than likely get a Weedon path too.
well that is interesting! What would a speed increase for the 350's mean for the timetable?
Why's that?172s also available for 110mph but gear isolated to stop it doing above 100.
Front coach (or even portion of) locked out of use will simply solve thatAssuming the test works, how will they get round the "100mph" limit for MU passenger stock without redesigning the front coach of a 350 (like 180/22x/390)?
Front coach (or even portion of) locked out of use will simply solve that
Many of the BREL sprinter body units (DMU and EMU) had parcel areas towards the front of one end of one coach on each set which could be locked out of use, and this could easily be incorporated as part of an upgrade
172s also available for 110mph but gear isolated to stop it doing above 100.
Assuming the test works, how will they get round the "100mph" limit for MU passenger stock without redesigning the front coach of a 350 (like 180/22x/390)?
Front coach (or even portion of) locked out of use will simply solve that
Many of the BREL sprinter body units (DMU and EMU) had parcel areas towards the front of one end of one coach on each set which could be locked out of use, and this could easily be incorporated as part of an upgrade
So passengers might get from A to B a little bit faster, but they're less likely to get a seat.
That doesn't seem very sensible.
#It was the belief of a senior member of the H&SE (thankfully since retired) that no passengers shuold be seated in the leading 1/3 of a vehicle capable of travelling above 100mph, but it was never actually proper legislation, and since he's now gone, normality (and sense) has returned - or so I've read (several times) in various mags.
I thought the 350's top speed was 100mph? Or would all units power to give the desired speed?
They are just doing a trial of having three pantographs up at 110 mph. The speed is within the 10% overspeed that the units have been tested at, but that doesn't mean those units will ever run at 110 in passenger service.
Perhaps we should just think of it as a test of the pantograph technology for a possible 110 mph 350/3, rather than the current units?
I thought the 350's top speed was 100mph? Or would all units power to give the desired speed?
Why would LM waste money on new rolling stock when they could preform the job needed on their current units? Maybe the exception of two or three new units but if it's 12 car units being tested maybe new 351 units could be built that are 12 cars only with no front gangway because he maximum number of trains coupled together is three which is 12 cars? Could be a logical reason?
What? Are the 323s on the Cross-city being replaced then? The 323s are perfectly suited to their job there; I don't see any need to replace them.350/3s are for TPE and LM cross city. LM wouldn't be spending anything on new stock. 12 car 350s are being tested because they want to know happens with 3 pantos running at 110mph
If they wanted to test 110mph in service pantographs wouldnt they actually have to test them at 121mph for safety margin certification?