12 car 350/1 to be tested at 110mph

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,579
Location
Macclesfield
Hmmm, this seems to tie in neatly with the proposed specification (IIRC) for 110mph capable EMU stock to run the Manchester to Scotland services following electrification...
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
Been doing the rounds for a while now, it would allow LM to sneak some better paths in and more than likely get a Weedon path too.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,775
Presumably if just the /1s get cleared that would help get them back to running the /1 and /2 fleets as they should be- /1 for longer distances, /2s for locals? Or would a succesful test for the /1s automatically see both sub classes OK-ed?
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,694
Location
LBK
Been doing the rounds for a while now, it would allow LM to sneak some better paths in and more than likely get a Weedon path too.

Weedon is super-busy. Are there any available paths? Maybe one an hour in each direction?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,318
Presumably if just the /1s get cleared that would help get them back to running the /1 and /2 fleets as they should be- /1 for longer distances, /2s for locals? Or would a succesful test for the /1s automatically see both sub classes OK-ed?

I'd be surprised if certification of 350/1s wouldn't be read straight across to 350/2s to be honest. The traction package has to be practically identical - and that ITT suggests the only area they're actually looking at is the pantograph/OHLE interraction - having 3 pans up on a 12 car could cause issues at higher speeds that are not seen with a 110 mph loco.
 

SS4

Established Member
Joined
30 Jan 2011
Messages
8,589
Location
Birmingham
Been doing the rounds for a while now, it would allow LM to sneak some better paths in and more than likely get a Weedon path too.

If they bypassed NMP (which I think Weedon path does) then where would they split. Alternatively could stations north of NMP cope with 12 car trains?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,318
If they bypassed NMP (which I think Weedon path does) then where would they split. Alternatively could stations north of NMP cope with 12 car trains?

Testing 12 car formations at 110 mph doesn't necessarily mean all 110 mph services have to run as twelve car though?

Rugby would be the probable place to split and join if not running via Northampton - I expect the platforms are definitely long enough, cos they were built for 11 car 390s?
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,296
This is not only for LM, but Siemens want to see if it is possible for 110mph /3s for TPE is what I've also heard
 

85A

Member
Joined
31 Jul 2011
Messages
26
172s also available for 110mph but gear isolated to stop it doing above 100.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,951
Location
Mold, Clwyd
well that is interesting! What would a speed increase for the 350's mean for the timetable?

Assuming the test works, how will they get round the "100mph" limit for MU passenger stock without redesigning the front coach of a 350 (like 180/22x/390)?
 

rail-britain

Established Member
Joined
12 Aug 2007
Messages
4,102
Assuming the test works, how will they get round the "100mph" limit for MU passenger stock without redesigning the front coach of a 350 (like 180/22x/390)?
Front coach (or even portion of) locked out of use will simply solve that
Many of the BREL sprinter body units (DMU and EMU) had parcel areas towards the front of one end of one coach on each set which could be locked out of use, and this could easily be incorporated as part of an upgrade
 
Joined
26 Sep 2009
Messages
556
Location
Bishops Stortford
Front coach (or even portion of) locked out of use will simply solve that
Many of the BREL sprinter body units (DMU and EMU) had parcel areas towards the front of one end of one coach on each set which could be locked out of use, and this could easily be incorporated as part of an upgrade

So passengers might get from A to B a little bit faster, but they're less likely to get a seat.

That doesn't seem very sensible.


--- old post above --- --- new post below ---
172s also available for 110mph but gear isolated to stop it doing above 100.

New train specifications usually include a clause that says the train must be capable of operating at speeds 10% higher than their normal operating maximum speed.

My guess is that the design speed for a 172 is therefore 110 mph, that this was demonstrated during testing and that this capability has now been disabled, presumably in the electronics (although it may be in the hydro-mechanical drive as you suggest).
 
Last edited:

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Assuming the test works, how will they get round the "100mph" limit for MU passenger stock without redesigning the front coach of a 350 (like 180/22x/390)?

Front coach (or even portion of) locked out of use will simply solve that
Many of the BREL sprinter body units (DMU and EMU) had parcel areas towards the front of one end of one coach on each set which could be locked out of use, and this could easily be incorporated as part of an upgrade

So passengers might get from A to B a little bit faster, but they're less likely to get a seat.

That doesn't seem very sensible.

It is a possible scenario though to lock one end out of use (obviously dividers would need to be installed).

It would only be 12-16 seats lost on a train which already has a higher capacity than the train is replaces - 235 vs 169 seats.

I agree though, unlikely.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,296
It was the belief of a senior member of the H&SE (thankfully since retired) that no passengers shuold be seated in the leading 1/3 of a vehicle capable of travelling above 100mph, but it was never actually proper legislation, and since he's now gone, normality (and sense) has returned - or so I've read (several times) in various mags.
#

Someone posted this on another forum?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,318
I thought the 350's top speed was 100mph? Or would all units power to give the desired speed?

They are just doing a trial of having three pantographs up at 110 mph. The speed is within the 10% overspeed that the units have been tested at, but that doesn't mean those units will ever run at 110 in passenger service.

Perhaps we should just think of it as a test of the pantograph technology for a possible 110 mph 350/3, rather than the current units?
 

Thetrainspod

Member
Joined
22 Aug 2011
Messages
6
Location
Old stratford
They are just doing a trial of having three pantographs up at 110 mph. The speed is within the 10% overspeed that the units have been tested at, but that doesn't mean those units will ever run at 110 in passenger service.

Perhaps we should just think of it as a test of the pantograph technology for a possible 110 mph 350/3, rather than the current units?

Why would LM waste money on new rolling stock when they could preform the job needed on their current units? Maybe the exception of two or three new units but if it's 12 car units being tested maybe new 351 units could be built that are 12 cars only with no front gangway because he maximum number of trains coupled together is three which is 12 cars? Could be a logical reason?
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,296
Why would LM waste money on new rolling stock when they could preform the job needed on their current units? Maybe the exception of two or three new units but if it's 12 car units being tested maybe new 351 units could be built that are 12 cars only with no front gangway because he maximum number of trains coupled together is three which is 12 cars? Could be a logical reason?

350/3s are for TPE and LM cross city. LM wouldn't be spending anything on new stock. 12 car 350s are being tested because they want to know happens with 3 pantos running at 110mph
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,894
Location
West Country
350/3s are for TPE and LM cross city. LM wouldn't be spending anything on new stock. 12 car 350s are being tested because they want to know happens with 3 pantos running at 110mph
What? Are the 323s on the Cross-city being replaced then? The 323s are perfectly suited to their job there; I don't see any need to replace them.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
If they wanted to test 110mph in service pantographs wouldnt they actually have to test them at 121mph for safety margin certification?
 

colchesterken

Member
Joined
12 Oct 2010
Messages
768
Please, please, will they run our 360 s at 110 on GEML... an hour to do 50 miles on a semi fast is not good.!!!..and how about our cl 90s 110 mph and our mk 3 125 cugging on at 100 on a good day..
 

class156

Member
Joined
19 Dec 2009
Messages
153
Location
Irvine
If they wanted to test 110mph in service pantographs wouldnt they actually have to test them at 121mph for safety margin certification?

I read somewhere (I think it was on here) that the 350s had been used at 140mph at the Siemens test track in Germany.
 