MatthewHutton
Member
Why would you do that rather than give the east its own dedicated line into Kings Cross where there’s amble spare capacity subject to a rationalisation of the rolling stock and electrification of 100-150 miles of branches some of which will be electrified anyway by the trans pennie upgrade?Yes but the powers that be be might want to build an eastern leg in forty years time and they’ll be livid if we haven’t built enough platforms now
== Doublepost prevention - post automatically merged: ==
On the basis that you can recover from delays in the off peak hours if you run more service at peak there isn’t much running even 9-10 trains an hour off peak I don’t believe.True but most services would have run entirely on HS2 infrastructure (including Birmingham to Manchester and Leeds). I wouldn't be surprised if the theoretical maximum capacity of the high speed line was designed to be closer to 24tph, so probably some slack for things being out of sequence.
The splitting for Edinburgh/ Glasgow always seemed like chaos waiting to happen, though.
The exceptions are 14/15tph off peak on the fast tracks great western mainline between Heathrow junction and Paddington and the 12tph? of unreliable service into Euston (both of which top out at 200km/h) and the 11/12tph on the Tokaido Shinkansen (albeit with more on special occasions like golden week).
Not sure what LGV Sud Est will manage after the signalling upgrade off peak - but I doubt it’s that much.