What does 6 and 3 stub platforms at Euston mean for hs2?

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
We can if we build HS2, which we are doing.
HS2 is going to add more than 100x more passengers than the sleeper though.

== Doublepost prevention - post automatically merged: ==

The classic line won't have fewer trains. It'll have more of a local
service
Local service can use platforms more aggressively and there’s freight which doesn’t need any platforms.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
From a Euston perspective - the 6+3 approach for HS2 is eminently sensible. I personally would have gone with a 6+4 approach to minimise short run costs (6 platform core HS2 Euston Station) with 4 platforms that can be converted from the existing station. Regarding the sleeper, that can run from Victoria and up the WLL, and remember it would only be the Highlander.
 

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,129
That can't be done because they are at a different height.
Could you not just have some steep track to connect them? Bearing in mind you might be able to shorten the platforms somewhat.

== Doublepost prevention - post automatically merged: ==

IIUC, it's the platforms that are different height, needing recourse to ramps/ assistance for boarding, alighting rather than 'level boarding'.
 

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,129
Doesn’t sound like something worth spending billions to avoid.
Maybe not. The Equality Act and related policies before and since 2010 have endeavoured to provide better access (and egress) for disabled people, folk with prams etc. Ask Baroness Tanni Grey-Thompson.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,826
Could you not just have some steep track to connect them? Bearing in mind you might be able to shorten the platforms somewhat.
No. Remember HS2 comes into Euston in a tunnel. The planned platforms are 8 metres below ground level.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Maybe not. The Equality Act and related policies before and since 2010 have endeavoured to provide better access (and egress) for disabled people, folk with prams etc. Ask Baroness Tanni Grey-Thompson.
You’re confusing platform height wrt trains with station depth below local ground level - they’re completely separate issues.
 

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,129
You’re confusing platform height wrt trains with station depth below local ground level - they’re completely separate issues.
Maybe I am confused. I thought I was responding to a suggestion that HS2 trains might use platforms in the existing 'classic' Euston station' (in extremis?). Happy to be wrong, if I am.
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
No. Remember HS2 comes into Euston in a tunnel. The planned platforms are 8 metres below ground level.
Would it really not be cheaper to make the entrance to the tunnel closer to the surface? Bearing in mind high speed trains can go on up to a 4% gradient.

== Doublepost prevention - post automatically merged: ==

Maybe not. The Equality Act and related policies before and since 2010 have endeavoured to provide better access (and egress) for disabled people, folk with prams etc. Ask Baroness Tanni Grey-Thompson.
The rules require “reasonable adjustments” for the disabled. It’s tough to argue that it’s necessary to spending billions on it when you could staff the platforms with assistants to help people onto the train for a fraction of that.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,826
Would it really not be cheaper to make the entrance to the tunnel closer to the surface? Bearing in mind high speed trains can go on up to a 4% gradient.
I have to assume the depth of the tunnel is dependent on what’s above it. So making it shallower presumably means having to buy more expensive London property to knock down. I can’t see that being a cheap option.
And as @swt_passenger says, you don’t do that months after the tunnels have already started being dug.
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
I have to assume the depth of the tunnel is dependent on what’s above it. So making it shallower presumably means having to buy more expensive London property to knock down. I can’t see that being a cheap option.
This way you’re having to build 9 platforms wide by 400m and an 8m deep hole rather than at most 6 platforms on the surface by 400m plus a bit more space at the far end for a dive under, actually if you needed 200m to go down 8m at full width it would be about the same amount of space.

It’s a shame they didn’t consider it before construction started but good it’s under way I guess.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,211
Location
Oxford
I would imagine the choice of depth has been made for a good reason, and if an extremely steep approach to reduce the depth offered more benefits than what they're doing, they'd be doing that.

It's going to be quite a complicated approach with an underground grade separated junction to avoid conflicts (the same as St Pancras on HS1, just in a tunnel), which probably limits the options somewhat.
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
I would imagine the choice of depth has been made for a good reason, and if an extremely steep approach to reduce the depth offered more benefits than what they're doing, they'd be doing that.

It's going to be quite a complicated approach with an underground grade separated junction to avoid conflicts (the same as St Pancras on HS1, just in a tunnel), which probably limits the options somewhat.
Or they are incompetent and got it wrong.

There’s tonnes of evidence of that throughout the project.
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
Could it go from Waterloo old Eurostar platforms?
Given they aren’t giving up any Euston platforms in the existing station it can stay as is.

The problem if you decided to take some of the existing platforms for HS2 is that you need two platforms for the two 400m sleepers and the two 400m ones are at each end of the station.
 
Joined
2 Feb 2010
Messages
105
What I’m trying to understand is what is now impossible given that Euston was once going to be 11 full length hs platforms but now it is going to be 6 full length plus 3 250m “stubs”. The correspondence says that is going to allow for 16tph but my understanding was that the original was designed for 18tph. Also, it looks like some of those 16 will be shorter trains all the way rather than full length trains that split on the mainline (eg front to Glasgow, back to Edinburgh)
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
What I’m trying to understand is what is now impossible given that Euston was once going to be 11 full length hs platforms but now it is going to be 6 full length plus 3 250m “stubs”. The correspondence says that is going to allow for 16tph but my understanding was that the original was designed for 18tph. Also, it looks like some of those 16 will be shorter trains all the way rather than full length trains that split on the mainline (eg front to Glasgow, back to Edinburgh)
Broadly they are assuming they can use the platforms more efficiently, and broadly that is sensible given the high costs of building the station and that the trains will be much more likely to be on time than on the pure classic network.

I am not quite sure which destinations they are serving to run 16 trains an hour though.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,211
Location
Oxford
What I’m trying to understand is what is now impossible given that Euston was once going to be 11 full length hs platforms but now it is going to be 6 full length plus 3 250m “stubs”. The correspondence says that is going to allow for 16tph but my understanding was that the original was designed for 18tph. Also, it looks like some of those 16 will be shorter trains all the way rather than full length trains that split on the mainline (eg front to Glasgow, back to Edinburgh)
You can run the Victoria line from 2 platforms at Brixton, so it's not essential to have 11 for 16tph. That's obviously an absurd analogy, but the point is you can use terminal platforms quite intensively if necessary. What will probably be lost by reducing turnaround times on HS2 is resilience.
 
Joined
2 Feb 2010
Messages
105
But wasn’t the whole point of hs2 meant to be a game changer in that not only would the network be resilient and recover there was a leaf on the line but also if a train is out of sequence because of a passenger falling sick etc.
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
But wasn’t the whole point of hs2 meant to be a game changer in that not only would the network be resilient and recover there was a leaf on the line but also if a train is out of sequence because of a passenger falling sick etc.
Well with 18 trains an hour, long sections of classic running on congested lines and all the train splitting it was never really going to achieve that.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,245
Well with 18 trains an hour, long sections of classic running on congested lines and all the train splitting it was never really going to achieve that.
It was as if the most optimistic of spotters had been given a deluxe set of crayons. Which I bet isn't that far from what actually happened. You can definitely see the influence of "railway people," we never learn.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,211
Location
Oxford
It was as if the most optimistic of spotters had been given a deluxe set of crayons. Which I bet isn't that far from what actually happened. You can definitely see the influence of "railway people," we never learn.
Wasn't that when Birmingham, Manchester and Leeds were entirely on high speed lines? Optimistic maybe but not ridiculous, IMO.
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
Wasn't that when Birmingham, Manchester and Leeds were entirely on high speed lines? Optimistic maybe but not ridiculous, IMO.
There was always going to be through running to Edinburgh and Glasgow in particular as well as Liverpool and Newcastle - and the train splitting risks reliability as well.

And 18 trains an hour doesn’t exactly leave a lot of slack in case of delays - you’re basically screwed if a train enters the high speed section 90 seconds behind schedule.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,211
Location
Oxford
There was always going to be through running to Edinburgh and Glasgow in particular as well as Liverpool and Newcastle - and the train splitting risks reliability as well.

And 18 trains an hour doesn’t exactly leave a lot of slack in case of delays - you’re basically screwed if a train enters the high speed section 90 seconds behind schedule.
True but most services would have run entirely on HS2 infrastructure (including Birmingham to Manchester and Leeds). I wouldn't be surprised if the theoretical maximum capacity of the high speed line was designed to be closer to 24tph, so probably some slack for things being out of sequence.

The splitting for Edinburgh/ Glasgow always seemed like chaos waiting to happen, though.
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
547
Location
UK
I thought I read somewhere that the new plan is based around ~10ph once Handsacre opens (3x Birmingham, 3x Manchester, 2x Liverpool, 2x Scotland?). That seems sensible and should be comfortable enough using 6x platforms, with 30min turnarounds on average and a bit of slack.

The original plan for 13 platforms at Euston (and 7 at Curzon St) was always conservative/gold-plated and completely unnecessary as soon as the eastern leg was scrapped.
 
Joined
2 Feb 2010
Messages
105
I thought I read somewhere that the new plan is based around ~10ph once Handsacre opens (3x Birmingham, 3x Manchester, 2x Liverpool, 2x Scotland?). That seems sensible and should be comfortable enough using 6x platforms, with 30min turnarounds on average and a bit of slack.

The original plan for 13 platforms at Euston (and 7 at Curzon St) was always conservative/gold-plated and completely unnecessary as soon as the eastern leg was scrapped.
Yes but the powers that be be might want to build an eastern leg in forty years time and they’ll be livid if we haven’t built enough platforms now
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
547
Location
UK
Yes but the powers that be be might want to build an eastern leg in forty years time and they’ll be livid if we haven’t built enough platforms now
We can't plan and build (very) expensive infrastructure based on what may happen in forty years. There's no realistic prospect of reviving the full Eastern Leg, so we shouldn't be planning for it.
 
Last edited:
Joined
2 Feb 2010
Messages
105
But isn’t the experience from Spain and elsewhere that once one major city has it, then the demand becomes overwhelming.

Also, isn’t it cheaper to build passive capacity at Euston now rather than building an east coast mainline bypass in thirty years and the whole point of the y route was to improve Birmingham to Leeds. Forcing us now to build an east coast bypass by myopia now would mean that a hs route between Leeds and Birmingham wouldn’t be justified. Finishing off the y network provides three mainline by passes for the cost of one and we shouldn’t close that option off now.
 