Has it been determined if the faults are as a result of poor build from Stadler or due to TFW's lack of care while they've been sat around? Two very different outcomes. If it's manufacturer issue then surely they wouldn't sell them back, they'd be seeking Stadler to fix or replace.
The 231's won't go to mainline if the trams aren't in service. There aren't enough 150's to cover Valleys work. Things will run as it does now.
The 231’s are going to be leaving the CVL unfortunately, whether the 398’s are ready or not. They will short form as much as they can.
The plan was to utilise the 150’s in their place, and you’ll probably see cancellations in the coming weeks on services deemed to be non essential outside of busy periods.
I don’t know who’s more at fault, but I imagine most software and electronic issues are caused by constant disruption to the electronic circuits which this discontinuous electricity supply maybe causing. There’s also not enough power in the system to meet the demand due to cost savings on feed stations.
A unit leaves the depot on battery, has had its software reset, a few cycles of the VCB and pantograph and the screen is full of warnings for various things. This happens to the 756’s too and units often need a full shut down and reset at the end of a run to clear issues with batteries and other things.
If they let the guards operate the doors on these, the ASDO and door issues could be resolved straight away.