Rich toffs being stubborn and having far too much undue influence, because god forbid their little lilywhite scented eyes have to see the horror of a stray wire at 50,000 paces.What is it about building railways through the Chilterns? When the Manchester, Sheffield and Lincolnshire (aka Money Sunk and Lost) built its London Extension to Marylebone and renamed itself the Great Central it was said that the money had Gone Completely. So what's new?!
If this railway was being built in Middlesbrough the line would be open. Whole areas would be demolished and the plebs told to get on with it. Cant have that in Bucks!Rich toffs being stubborn and having far too much undue influence, because god forbid their little lilywhite scented eyes have to see the horror of a stray wire at 50,000 paces.
Unfortunately, that whole area is NIMBYland to the high heavens.
The Channel Tunnel didn't have to deal with NIMBYs or protests because it's mostly an undersea tunnel. It's railway system was also merely an extension of the LGV Nord. By contrast HS2 runs through some affluent areas and ancient woodlands that environmentalists would rather see burn down in the long term through climate change causing forest fires than two railway lines running through and taking cars and lorries off the road (hyperbolic on my end).So the Channel Tunnel, which must surely be far more complicated, took 7 years... Why is this taking so long?
It could if the government wasn`t in charge !Surprised? No.
Sadly this country could not engineer itself out of a paper bag even supplied with scissors.
It might've done so, especially since that's how HS1 was done (start from the bottom and work your way to London) but it wouldn't have resolved the issue of capacity and bottlenecks in the south which is where the route was most needed. Even with the only section serving London there was still uncertainty as to whether it would go all the way.someone once said to me that it should have started in the north and headed south towards euston.
if that happened you could be sure it would be built in it's entirety because the political will would have been there to get it into London !
And unforgivable. Reduced hourly capacity, slower speed, shorter trains + longer journey times and less capacity to Scotland than exists today and that only once/if Handsacre junction opens (2043 to 2046 eta ffs).2036!?
Just, unbelievable...
ThanksPresumably yes (such a geographically expansive cancellation has never happened before, although I note that Reform UK, at least of September 2025, would simply cancel HS2 and leave the semi-completed infrastructure in place like some sort of Ozymandias-like warning to anyone who might dare to build something ambitious in the future).
Also, there would be massive penalty clauses which the contractors/suppliers would claim.
In short, yes. Mark Wild has written a three-page letter on this if you want to know more: https://www.gov.uk/government/publications/hs2-cancellation-cost-advice . As I wrote in the HS2 reset thread:Genuine question: how, as the minister claims, can it cost as much to cancel the project as to spend another 10 years and billions of pounds finishing it?
Is it because we'd have to spend years and billions dismantling and filling in stuff already built to make it safe?
It depends what changes they're actually making. The savings from reducing the speeds are likely to mostly come from avoiding the need to test to the higher speed, in which case there's no reason that overnight testing cannot take place without disruption once the line is operational. For frequency it depends what the changes are, if it's just removing the ATO capabilty, does this just bolt on to the same ETCS system? In which case it could be added and tested for at a later date, while the line is operational and this would be when and if phase 2 is on the way.If I understand correctly (and I admit I may be mistaken), doesn't this preclude any increase in frequency beyond the 10tph without further infrastructure works on what would be (hopefully) a working railway
What year's prices is the £97bn based on? Some of the prices the media likes to come up with as an example of "cost overruns" haven't accounted for inflation or changes in scope (like rolling stock which would have needed ordering regardless because the Pendos will not last forever)£97bn (taking the average of high and low estimates). That is the total cost over roughly 18 years. Government spending is about £1.37tn per annum, according to the OBR.
Granted, money has been wasted, but not being hypnotised by a single number helps ...
the infrastructure is basically done
It is "priced in 2025" according to the Parliamentary statement, and the OBR figure is a "2025-6 estimate".What year's prices is the £97bn based on? Some of the prices the media likes to come up with as an example of "cost overruns" haven't accounted for inflation or changes in scope (like rolling stock which would have needed ordering regardless because the Pendos will not last forever)
And presumably that's a price for Euston-Handsacre only?It is "priced in 2025" according to the Parliamentary statement, and the OBR figure is a "2025-6 estimate".
According to the latest six-monthly report to Parliament the civil engineering continues to 2029 or 2030 (charts with incomplete labels on the axes are a downer ...)Is it really? Looking at some recent drone videos here: https://www.youtube.com/@DroneFunUK/videos I would disagree.
According to the BBC Live page:And presumably that's a price for Euston-Handsacre only?
This covers the cost of the whole programme stretching from London Euston to Birmingham Curzon Street, as well as the connection to West Coast Main Line at Handsacre Junction.
Very interesting thanks. With those sorts of numbers I can see why they decided to press in, albeit it seems with a lower annual spend which pushes the project into the 2040s and frees up funds for other priorities.In short, yes. Mark Wild has written a three-page letter on this if you want to know more: https://www.gov.uk/government/publications/hs2-cancellation-cost-advice . As I wrote in the HS2 reset thread:
"overall cancellation and remediation cost estimate from £33bn to as high as £58bn (2025 prices)." This is assuming a "Realistic Remediation Scenario”, one where a law is passed allowing HS2 to leave various structures in situ. Without such legislation, "the current legal position is that land should be fully remediated, which would include demolishing all built assets, and returning land to the same condition as prior to construction". This was seen as being unrealistic given the cost to demolish all the viaducts and fill in all the tunnels, so no estimate was made for that scenario.
This honestly all sounds like the government quiet quitting the project - extending the deadlines ridiculously by massively reducing year on year expenditure to fund their other promises while kicking the can down the road so the next government (which is obvious even to them to be anyone but Labour) can be blamed for increasing the year on year cost again to bring it back on track.
The published statement doesn't sound like quiet quitting to me either:Because doing nothing is not a zero-cost option. It would cost the same to cancel what is left as it would to finish it, and what would we gain?
Crossrail went through all sorts of trouble, yet if you travel on it now it is full with the Central Line still busy but no longer creaking at the seams.
That's not the impression I got when watching the minister's statement to the house.
They only bit of route that's conceivably left to cut is OOC to Euston. Everything else north of Birmingham has already been cut. Well, I suppose they could really hobble the project by getting rid of the WCML link so that HS2 is literally just a shuttle from OOC to Birmingham forever.Given how much has been spent it's unlikely the whole project will be cancelled but are there any realistic chances that parts of the existing planned route will be cut in the future?
The only bits left that are potentially cancelable are Euston and Handsacre. And given the Euston tunnels are being dug now, it's not worth cancelling the rest of it. Same goes for Handsacre once the core is up and running. What is conceivable is that it could be not far off 2050 before all three bits - core, Euston, Handsacre - are all in operation together.Given how much has been spent it's unlikely the whole project will be cancelled but are there any realistic chances that parts of the existing planned route will be cut in the future?