New rail lines in Scotland

mcmad

Member
Joined
11 Mar 2015
Messages
1,074
There is a 1.5km section from the cemetery to the viaduct at Mill street that is totally lost and the access road, car park and ramped access to Queen Margret station are built on the old formation.

The costs of reinstating that central section would far exceed any theoretical benefits.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
31 Jan 2020
Messages
395
Location
Inverness
We had a forum walk along that line a few years back, and yes it is mostly clear. But the question is if it would be worth the cost? What is the demand that's not currently being met?
I was thinking it was clear enough that if Alloa to Dunfermline was to be reinstated, the direct line is probably a better bet than the winding and slow coastal route, and probably more likely to be used.

This is probably reliant on demolishing and redeveloping the Carnegie retail park, and some other engineering works.

I don’t know a huge amount about the demand, only that people seem to be discussing it, But a 65ish minute Dunfermline to Glasgow journey time, and a new diversionary route might improve the business case.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,695
Location
Scotland
I was thinking it was clear enough that if Alloa to Dunfermline was to be reinstated, the direct line is probably a better bet than the winding and slow coastal route, and probably more likely to be used.
I agree that the direct route would be preferable, but the coastal route has the advantage of at least existing. :)
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,082
Location
West Yorkshire/Tuscany
I agree that the direct route would be preferable, but the coastal route has the advantage of at least existing. :)
.....and the possibility of a certain amount of tourist traffic to and from Culross, should a suitable site for a station or halt be identified.
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,074
I don’t know a huge amount about the demand, only that people seem to be discussing it, But a 65ish minute Dunfermline to Glasgow journey time, and a new diversionary route might improve the business case.
no idea how you're calculating that journey time, Glasgow to Alloa is 45 minutes currently and its 13 miles as the crow flies from Alloa to Dunfermline Upper. Its no faster than routing via Dalmeny
 
Joined
31 Jan 2020
Messages
395
Location
Inverness
no idea how you're calculating that journey time, Glasgow to Alloa is 45 minutes currently and its 13 miles as the crow flies from Alloa to Dunfermline Upper. Its no faster than routing via Dalmeny
13 miles at an average speed of 40mph is 20 minutes. The alignment is pretty straight so as far as I can tell there’s no reason why that speed (or higher) wouldn’t be achievable.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
.....and the possibility of a certain amount of tourist traffic to and from Culross, should a suitable site for a station or halt be identified.
Not just that, but plenty of cheap brownfield land at Longannet adjacent to the line for potential residential or light commercial redevelopment (which could supply passengers to a new station).
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,082
Location
West Yorkshire/Tuscany
13 miles at an average speed of 40mph is 20 minutes. The alignment is pretty straight so as far as I can tell there’s no reason why that speed (or higher) wouldn’t be achievable.
When the line was still in regular use until 1968, IIRC the maximum permitted line speed was 45 mph....but there were numerous lower permanent restrictions due to mining subsidence. In order to achieve an average speed of 40 mph, extensive and extremely expensive underground remedial works would have to be undertaken prior to rebuilding and reopening. It's a non-starter I'm afraid.
 
Joined
31 Jan 2020
Messages
395
Location
Inverness
When the line was still in regular use until 1968, IIRC the maximum permitted line speed was 45 mph....but there were numerous lower permanent restrictions due to mining subsidence. In order to achieve an average speed of 40 mph, extensive and extremely expensive underground remedial works would have to be undertaken prior to rebuilding and reopening. It's a non-starter I'm afraid.
That is news to me. Though I know that area of Fife is riddled with tunnels so perhaps not surprising.
 

waverley47

Member
Joined
17 Apr 2015
Messages
845
13 miles at an average speed of 40mph is 20 minutes. The alignment is pretty straight so as far as I can tell there’s no reason why that speed (or higher) wouldn’t be achievable.

Current section times from Alloa loop to Charlestown junction are in the region of 45 minutes. It would cost an awful lot of money to get that down to a place where you could reliably run even 1tph in each direction.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
Current section times from Alloa loop to Charlestown junction are in the region of 45 minutes. It would cost an awful lot of money to get that down to a place where you could reliably run even 1tph in each direction.
What's an awful lot of money? A Glasgow - Alloa - Dunfermline - Leuchars - Dundee service would connect western Scotland to a massive swathe of Fife, in addition to the more local connectivity benefits (including enabling lots of housebuilding in southern Fife)?
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
What's an awful lot of money? A Glasgow - Alloa - Dunfermline - Leuchars - Dundee service would connect western Scotland to a massive swathe of Fife, in addition to the more local connectivity benefits (including enabling lots of housebuilding in southern Fife)?
it would be good to see back-of-an-envelope calculations for that, it could even be a good investment in terms of public spending.

After all they did move the ECML sideways off subsiding ground after stabilising the corridor alongside it (east of Musselburgh?) and there are thousands of houses around there now.
 

waverley47

Member
Joined
17 Apr 2015
Messages
845
it would be good to see back-of-an-envelope calculations for that, it could even be a good investment in terms of public spending.

After all they did move the ECML sideways off subsiding ground after stabilising the corridor alongside it (east of Musselburgh?) and there are thousands of houses around there now.

The ECML works were a preemptive measure, and the ECML carries the majority of cross-border traffic, and carried a not insignificant amount of freight at the time.

The Alloa - Dunfermline line carries no regular traffic, and hasn't since the reopening of the line to Alloa meant coal trains to Longannet were diverted away from the Forth Bridge.

Back of the envelope calculation, for new signalling, refurbished track bed, new track, subsidence mitigation, line speed increases needed to bring the journey time down to the 20 minutes which would be necessary for a 1tph in each direction service, three new stations and a new platform at Alloa, you'd be looking at the best part of £300m.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,695
Location
Scotland
Back of the envelope calculation, for new signalling, refurbished track bed, new track, subsidence mitigation, line speed increases needed to bring the journey time down to the 20 minutes which would be necessary for a 1tph in each direction service, three new stations and a new platform at Alloa, you'd be looking at the best part of £300m.
To be fair, compared to some other projects that get more support (e.g. Leuchars - St. Andrews), that's not terrible value for money.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
To be fair, compared to some other projects that get more support (e.g. Leuchars - St. Andrews), that's not terrible value for money.
I like it! The more I think about it (admittedly from an outsider's perspective) it ticks a lot of boxes.
Lots of brownfield land (because the line used to connect industrial sites) so loads of space for new towns, lots of socal housing and industry. Housing is desperately needed in Scotland: https://www.bbc.co.uk/news/articles/c059n9e94l9o says
the government needs to build at scale, buy more homes and reduce the number of empty properties in the public and private sector.
The Scottish government declared a national housing emergency in May last year and recently pledged to invest up to £4.9bn in affordable homes over the next four years.
...
"there were "some green shoots of recovery" in Fife but added the outlook was less positive in other local authorities, such as Glasgow and Edinburgh.
He told the programme: "We have just got to recognise that this is a long road.

"There is no quick fixes [sic] to resolving the housing emergency."
and attractive land prices with communications will hopefully attract employment too.

Good potential connections to Scotland's biggest cities should stop the new towns being isolated ghettoes (see Blacon, near Chester, or Skelmersdale) plus it could help Fife join the Central Belt in a Randstadt-type city region.

It shouldn't be too difficult to bring the railway reopening into a housing and light-industry employment sheme on that scale, espacially as it hass not been abandoned for so very long.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,695
Location
Scotland
Lots of brownfield land (because the line used to connect industrial sites) so loads of space for new towns, lots of socal housing and industry.
The Longannet site by itself could probably support a few thousand homes, depending on density.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
it would be good to see back-of-an-envelope calculations for that, it could even be a good investment in terms of public spending.

After all they did move the ECML sideways off subsiding ground after stabilising the corridor alongside it (east of Musselburgh?) and there are thousands of houses around there now.
Indeed, and this is just upgrading a railway on the existing route. It isn't a total diversion as far as I know.
The Longannet site by itself could probably support a few thousand homes, depending on density.
Longannet being redeveloped for housing would follow the precedent of a town just down the road/track (Dalgety Bay) being redeveloped on what could be described as military land (RNAS Donibret). Plus there is plenty of land around Valleyfield, Cairneyhill, Crossford and a few other villages/towns near the route.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
Indeed, and this is just upgrading a railway on the existing route. It isn't a total diversion as far as I know.
The point was that drilling and grouting under an operating main line would have been much more difficult than doing it under the adjacent lifted goods lines and sidings and then moving the main line over afterwards. Here the prep works would hopefully be easier...
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
The point was that drilling and grouting under an operating main line would have been much more difficult than doing it under the adjacent lifted goods lines and sidings and then moving the main line over afterwards. Here the prep works would hopefully be easier...
True.
 

Aaron_TTL

Member
Joined
9 Jun 2022
Messages
248
Location
Scotland
To be fair, compared to some other projects that get more support (e.g. Leuchars - St. Andrews), that's not terrible value for money.

Would it not also need new signalling between Dundee and up beyond Cupar? Right now theres about a train on average every 30 mins through Leuchars to Edi, Can you increase that or would an Edi destination train have to be sacrificed for Glasgow.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,695
Location
Scotland
Would it not also need new signalling between Dundee and up beyond Cupar? Right now theres about a train on average every 30 mins through Leuchars to Edi, Can you increase that or would an Edi destination train have to be sacrificed for Glasgow.
Way too many unknowns to start designing timetables, methinks.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,429
Location
Somerset
Would it not also need new signalling between Dundee and up beyond Cupar? Right now theres about a train on average every 30 mins through Leuchars to Edi, Can you increase that or would an Edi destination train have to be sacrificed for Glasgow.
The average doesn’t really signify - look for the shortest headway!
 

Top