zwk500
Veteran Member
In earlier reporting, it was mentioned that the Diesel system would need to be removed to allow for the 25KV AC Equipment. However it is designed for such an event.Will the electric mode be able to work on both the current 1500VDC and the planned 25KV AC for north of Drogheda?
On delivery, it will be 1.5KV DC, Diesel, Battery.
Once 25KV OLE is in place it can be converted to 1.5KV DC, 25KV AC, Battery.