LittleRedTrain
Member
Sorry, couldn't think of a more concise thread title:
On 15th April, I booked an Advance ticket (via the Forum site) for Monday 11th May for the 1441 Wolverhampton to Tywyn direct train, arriving 1725
Since then, engineering work has been announced on the Cambrian and this train now terminates at Shrewsbury, with buses from Shrewsbury to Machynlleth and a train onwards to Tywyn.
To arrive at Tywyn at the original time, I'd need to instead board the 1342 from Wolverhampton to Shrewsbury, connecting to the 1430 replacement bus to Machynlleth, and then the 1655 train to Tywyn, arriving at 1725.
This means my existing Advance Ticket isn't technically valid on the 1342. I wasn't expecting any issues with acceptance as TfW staff tend to be pretty pragmatic, but I thought I'd try and get it in writing from TfW customer services just in case:
Am I correct here thinking that TfW Customer Services should be considered an 'Authorised Person' here as far as the Railway Byelaws are concerned.
https://assets.publishing.service.g...8a54f8/dft-railway-byelaws-amendment-2025.pdf
18.3 states: No person shall be in breach of Byelaw 18(1) or 18(2) if (iii) an authorised person gave him permission to travel without a valid ticket.
25.1 states: “authorised person” means: (i) a person acting in the course of his duties who: (a) is an employee or agent of an Operator, or (b) any other person authorised by an Operator,
I'd say that a Customer Services agent employed by TfW should meet these criteria.
Also I find it incredibly disingenuous that they are trying to make me amend my ticket to a more expensive one, due to disruption only announced after purchase. Surely this should be treated in the same way as a normal cancellation, where Advance tickets are accepted on the previous or next trains.
Is anyone able to point me to chapter and verse on this?
In practice, it will probably be fine, but I was rather disappointed by the whole interaction.
On 15th April, I booked an Advance ticket (via the Forum site) for Monday 11th May for the 1441 Wolverhampton to Tywyn direct train, arriving 1725
Since then, engineering work has been announced on the Cambrian and this train now terminates at Shrewsbury, with buses from Shrewsbury to Machynlleth and a train onwards to Tywyn.
To arrive at Tywyn at the original time, I'd need to instead board the 1342 from Wolverhampton to Shrewsbury, connecting to the 1430 replacement bus to Machynlleth, and then the 1655 train to Tywyn, arriving at 1725.
This means my existing Advance Ticket isn't technically valid on the 1342. I wasn't expecting any issues with acceptance as TfW staff tend to be pretty pragmatic, but I thought I'd try and get it in writing from TfW customer services just in case:
- Their first response was that I had to amend my Advance ticket to the new itinerary (which would mean it doubles in price)
- When I pushed back, and said that they are entitled to grant me permission to use the 1342, they insisted that they couldn't give me permission, and I'd have to ask station/train staff before boarding, and it would 'probably be fine'.
- I insisted that they do have the right to give me permission without needing to ask the Train Manager, they insisted it was always the TM's discretion about whether to accept the ticket and they have no rights to override it, and they still recommended amending my ticket.
Am I correct here thinking that TfW Customer Services should be considered an 'Authorised Person' here as far as the Railway Byelaws are concerned.
https://assets.publishing.service.g...8a54f8/dft-railway-byelaws-amendment-2025.pdf
18.3 states: No person shall be in breach of Byelaw 18(1) or 18(2) if (iii) an authorised person gave him permission to travel without a valid ticket.
25.1 states: “authorised person” means: (i) a person acting in the course of his duties who: (a) is an employee or agent of an Operator, or (b) any other person authorised by an Operator,
I'd say that a Customer Services agent employed by TfW should meet these criteria.
Also I find it incredibly disingenuous that they are trying to make me amend my ticket to a more expensive one, due to disruption only announced after purchase. Surely this should be treated in the same way as a normal cancellation, where Advance tickets are accepted on the previous or next trains.
Is anyone able to point me to chapter and verse on this?
In practice, it will probably be fine, but I was rather disappointed by the whole interaction.

