SWR would do well to condense some of their scripts.
I was at Weybridge station recently and three announcements about disruption on the network played back to back with almost the same script. I get there will be some stations in this situation where information from one disruption only will be used, but there should be a smarter way of communicating this to passengers - there was so much repeat information, I wasn’t really paying attention by the middle of the second one.
The same goes for their engineering announcements too. They are so long winded and read out so slowly, you stop listening by the end.
So at Weybridge, they had 3 announcements about disruption, 2 announcements about separate bits of engineering, an announcement about the new timetable with ‘journey planners having been updated’, British Transport Police, penalty fares and no smoking, as well as 2 service announcements per train with their usual wordy scripts (when they could actually play in between all the waffle) all in about 20 minutes. The speakers barely shut up!
Fortunately the PIS systems on the 458s haven’t been abused as much as the other stock (though it does still think the trains are formed of 10 coaches and announces short platforms as such) so you really only get the stop information and the occasional ‘see it, say it, sorted’, though this stock is being withdrawn by SWR over the coming months.