ScotRail Suburban Fleet (EMU and BEMU) Market Engagement

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,283
Location
Glasgow
Wider seats means narrower aisle though, and a wide aisle could fit more standing?
Depends how wide.

You could easily keep the same width aisle by having a 2+2 seating layout fit the same footprint as the existing 2+3, but just moving the aisle over so it is centred rather than off-centre as with 2+3.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AilsaBus

Member
Joined
7 May 2023
Messages
101
Location
Scotland
Wider seats means narrower aisle though, and a wide aisle could fit more standing?

People normally stand in the vestibule areas on the Glasgow Electrics, very rarely see people standing in the aisle. The 334s have 2+2 seating in the 2 end carriages and still have a reasonably wide aisle.
 

Class83

Member
Joined
8 Jun 2012
Messages
604
The standard 170 layout was pretty good for the longer (20-60min) suburban routes, would hope it's broadly the same, 2+2 with a mix of tables and airline seats.
 

JumpinTrainz

Established Member
Joined
30 Jul 2018
Messages
1,929
Personally I think they should have 2+2 seating but with wider seats. I often get on 318s and 320s and always see 2 people sitting either end of a row of 3 seats with nobody wanting to sit in the middle seat.
Hard agree. More 2+2 seating. The 3+3 or 3+2 seating on the current stock is some impractical.
 

Ben Conlin

Member
Joined
19 Aug 2018
Messages
72
Compared to a 385 maybe a similar layout with half tables and larger more open space around the doors. Curious about the accessibility areas potentially being in end cars only. In terms of current platforms in service or made public would think that rules out Stadler as they until now at least have been shorter cars accessible throughout and Siemens as their Desiro verve looks low floor at all doors. Hoping there’s not an adaptation of the current Hitachi design planned but will hopefully hear in the coming months.
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,740
Location
Glasgow
Compared to a 385 maybe a similar layout with half tables and larger more open space around the doors. Curious about the accessibility areas potentially being in end cars only. In terms of current platforms in service or made public would think that rules out Stadler as they until now at least have been shorter cars accessible throughout and Siemens as their Desiro verve looks low floor at all doors. Hoping there’s not an adaptation of the current Hitachi design planned but will hopefully hear in the coming months.
I think if its a walkthrough 5 car train, the accessibility area (wheelchair, bikes, prams) should be in carriage 3. Similar to a Thameslink 700, you'll always know where to go.
 
Last edited:

Class83

Member
Joined
8 Jun 2012
Messages
604
Compared to a 385 maybe a similar layout with half tables and larger more open space around the doors. Curious about the accessibility areas potentially being in end cars only. In terms of current platforms in service or made public would think that rules out Stadler as they until now at least have been shorter cars accessible throughout and Siemens as their Desiro verve looks low floor at all doors. Hoping there’s not an adaptation of the current Hitachi design planned but will hopefully hear in the coming months.
The length of routes these trains would be operating is very similar to the 385s so full tables would be sensible as the half ones don't save much space and are fairly pointless if you're in an aisle seat, but the interiors on the 170s they're replacing are quite similar to the 385s, the 158s aren't as well suited with end doors. The problem isn't as much the carriage layout, 2+2, mix of tables and airlines, and mid carriage doors. It's simply the number of carriages.
 

HighlandStorm

Member
Joined
27 Sep 2024
Messages
147
Location
Inverness
Could 2 four car 385s have a driving car removed and low floor full pass through cars be fitted in their place to create fixed 8 car sets with level boarding in the 2 new mid cars for the E&G express services.

Take the 2 driving cars and fit to another pair of new level boarding cars for fully accessible four car units.

I seem to recall there was an option for 10 more 385s. Could something like this be in the mix to improve accessibility of the current stock that will be in service the longest, this could there be an incentive to go with hitachi to reform at least some existing 385 sets?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,305
Location
Somerset
That would mean having multiple though.
Yes - which doubles as standing space etc. the number of services which would have enough seating with only one multi-purpose area but not with two will be small. Most will either have spare capacity or standees anyway.
 

och aye

Member
Joined
21 Jan 2012
Messages
1,008
I hope this is the right thread to post this, Transform Scotland have published a new discussion paper regarding the the ScotRail fleet and what they think are the important aspects of the fleet renewal.

Here's the link for those who might be interested in reading it:

 

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
From what I read it seemed to just be a business case, highlighting why we need a new fleet rather than what it should look like for the most part. Such as things like return on interest, boosted passenger numbers, increased familiarity and reliability, modal shift etc. As well as highlighting other case studies like the Merseyrail and TfW rolling stock procurements.
 

Fife coaster

Member
Joined
6 Feb 2017
Messages
22
The transform talks a good talk but what we need is instead of taking the meridians is a fleet of hitachi 800s trI mode so are future ready so as more wires come on line the trains can change with the time without having to replace them. We also need a fleet of new dmus for the north highland and west highland as we can’t dither any longer as no new technology is going to be available for at least 20 years min to replace them as the 156,158 have done their bit but are not fit any more
 

Highlander1

Member
Joined
5 Sep 2025
Messages
173
Location
Inverness
The transform talks a good talk but what we need is instead of taking the meridians is a fleet of hitachi 800s trI mode so are future ready so as more wires come on line the trains can change with the time without having to replace them. We also need a fleet of new dmus for the north highland and west highland as we can’t dither any longer as no new technology is going to be available for at least 20 years min to replace them as the 156,158 have done their bit but are not fit any more
The subject of the 222 vs 800s has been argued to the death on various threads. A replacement for the HST is needed now and 800s are not available in a short enough time frame. The 222 is a medium term replacement ahead of a bi mode once the wires cover more of the route, which is decades away
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
The transform talks a good talk but what we need is instead of taking the meridians is a fleet of hitachi 800s trI mode so are future ready so as more wires come on line the trains can change with the time without having to replace them.
Page 19 describes the Meridians as an interim arrangement. Then goes on to say
While interim fixes are on the agenda, delaying full renewal does not save public capital. Delay merely converts any short-term savings into escalating
overheads, lost passenger revenue, and a decline in the commercial viability of the public transport network.
Basically it was all that was available to replace the 1970s HSTs, unless prepared to wait for new builds


We also need a fleet of new dmus for the north highland and west highland as we can’t dither any longer as no new technology is going to be available for at least 20 years min to replace them as the 156,158 have done their bit but are not fit any more
Interestingly on page 6 it references Norway's family trains, or Switzerlands panoramic scenic trains.
This sounds like a step change in recognising what would attract people to use the railways. Completely different to DfT approach of cram people into boxes on wheels where windows don't line up with seats.

 

Highlander1

Member
Joined
5 Sep 2025
Messages
173
Location
Inverness
Page 19 describes the Meridians as an interim arrangement. Then goes on to say

Basically it was all that was available to replace the 1970s HSTs, unless prepared to wait for new builds



Interestingly on page 6 it references Norway's family trains, or Switzerlands panoramic scenic trains.
This sounds like a step change in recognising what would attract people to use the railways. Completely different to DfT approach of cram people into boxes on wheels where windows don't line up with seats.

DfT is not really relevant given they have no involvement in the process. DfT doesn't cover Scotland. Scotrail have also made it clear in the tender "family" areas and improved accessibility are a requirement. I also understand panoramic style trains were looked at for rural routes but it doesn't sound like the funding is available so we'll see a reallocation of 158s and 170s onto those routes instead
 
Last edited:

LocoCycle

Member
Joined
5 Jan 2020
Messages
22
Location
Edinburgh
I hope this is the right thread to post this, Transform Scotland have published a new discussion paper regarding the the ScotRail fleet and what they think are the important aspects of the fleet renewal.

Here's the link for those who might be interested in reading it:

To help discussion in later posts note that transform.scot is a lobby group, not part of the Scottish Government and so isn't a decision making body.
 

Fife coaster

Member
Joined
6 Feb 2017
Messages
22
Yeah the noises transport Scotland are making are horrendous saying that once the bemus are in service circa 2031 ish the 170s and 158s will cascade this really is awful when you see what transport For wales are doing and the new fleets taken onboard not in 5 years but now just feel theirs no ooomf to do anything just hiding behind decarbonisation instead of making the right hard decisions.
 

Bill57p9

Member
Joined
1 Dec 2019
Messages
862
Location
Ayrshire
The transform talks a good talk but what we need is instead of taking the meridians is a fleet of hitachi 800s trI mode so are future ready so as more wires come on line the trains can change with the time without having to replace them. We also need a fleet of new dmus for the north highland and west highland as we can’t dither any longer as no new technology is going to be available for at least 20 years min to replace them as the 156,158 have done their bit but are not fit any more
South Western too: the 156s serving Ayrshire and Dumfries and Galloway are feeling very tired approaching their 40th birthday.

Interestingly on page 6 it references Norway's family trains, or Switzerlands panoramic scenic trains.
Hopefully that includes Switzerland's photographic carriages with vertically opening windows.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Is there a likelihood of installing digital signalling on the Argyle Line when the new trains arrive? I remember Alex Hynes saying they were looking into it a few years ago. He said they could make it even more of a metro line than it currently is.

I assume all new trains are future proofed for digital signalling?
 
Last edited:

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
Is there a likelihood of installing digital signalling on the Argyle Line when the new trains arrive? I remember Alex Hynes saying they were looking into it a few years ago. He said they could make it even more of a metro line than it currently is.

I assume all new trains are future proofed for digital signalling?
This month's Modern Railways has a couple of articles on ETCS, and reports that Scotland is much more lukewarm about it, reinforced by the progress of the East Coast project. So I think it's highly unlikely that the suburban railways of Glasgow will have it fitted by the time the new trains arrive.
 

Transilien

Member
Joined
10 Mar 2024
Messages
728
Location
Ayrshire
This month's Modern Railways has a couple of articles on ETCS, and reports that Scotland is much more lukewarm about it, reinforced by the progress of the East Coast project. So I think it's highly unlikely that the suburban railways of Glasgow will have it fitted by the time the new trains arrive.
I can imagine that suburban Glasgow will be one of the last places to recive it, considering how left behind the network feels these days.
 

N1

Member
Joined
10 Aug 2022
Messages
385
This is hardly a bad thing...
A bit of ATO on Cathcart Circle, Argyle and North Clyde Lines, among a few others would improve timetable. They currently have very sedate timetables, gentle acceleration and long dwells. Not very suburban.
 

Transilien

Member
Joined
10 Mar 2024
Messages
728
Location
Ayrshire
A bit of ATO on Cathcart Circle, Argyle and North Clyde Lines, among a few others would improve timetable. They currently have very sedate timetables, gentle acceleration and long dwells. Not very suburban.
I agree, but I think part of the problem is the use of inappropriate rolling stock like the 380s which are geared for outer suburban workings.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,283
Location
Glasgow
I agree, but I think part of the problem is the use of inappropriate rolling stock like the 380s which are geared for outer suburban workings.
They accelerate faster than the 318/320s do and top speed is only 10mph higher.

The 318s were originally built for 'Outer Suburban' work too.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Just 3 weeks to go until the date tender said would dispatch invitations to selected candidates, wonder when that shortlist will become public

IV.2.2) Time limit for receipt of tenders or requests to participate​

Date: 19/01/2026 Local time: 12:00

IV.2.3) Estimated date of dispatch of invitations to tender or to participate to selected candidates​

Date: 17/07/2026

IV.2.4) Languages in which tenders or requests to participate may be submitted​

EN

IV.2.6) Minimum time frame during which the tenderer must maintain the tender​

Tender must be valid until: 28/04/2028

There gave themselves generous 6 months to reduce the participation list to a short list, so would hope there are no delays
 