Triang Hornby
Member
Micklefield to Hambleton Jct
I was going to suggest this too but to my surprise this was further than fifteen miles. I would also think that residents of Dumfries would rather have a direct connection to Glasgow than to Ayr, if Ayr can still be accessed by changing at Kilmarnock?Barrhead to Kilmarnock is an obvious one for me. If the GSW line services were run from Carlisle - Kilmarnock - Ayr connecting with electric services Kilmarnock to Glasgow, it could eliminate all regular DMU services into Central (I am aware that additional electric units are required for this service and the odd East Kilbride services still in the hands of 156s)
GWR need battery trains for:It prevents having a microfleet of battery trains.
Fast lines are getting electrified as part of Midlands Rail Hub, as for Camp Hill you deal with the reversal on the Manchesters and go via Selly Oak.Except that some XC trains run via the Camp Hill line, which is not electrified – and they all use the also not-electrified fast lines between Kings Norton and Longbridge. So it isn't quite as simple as subtracting the time at Bromsgrove from the time at Proof House Junction and saying they are under the wires for all that time!
The turbo's are kind of a Microfleet in the Reading area compared to the Electrostars.GWR need battery trains for:
- Windsor, Henley, Greenford, Marlow, Reading-Basingstoke
- MetroWest
- Devon Metro
- Gunnislake, Looe, Newquay, Falmouth, St Ives
Wouldn't call that a microfleet.
The Thames Valley, WECA area, Devon metro, and Cornish branches would likely be operated as mostly independent fleets.GWR need battery trains for:
- Windsor, Henley, Greenford, Marlow, Reading-Basingstoke
- MetroWest
- Devon Metro
- Gunnislake, Looe, Newquay, Falmouth, St Ives
Wouldn't call that a microfleet.
If you're electrifying strategically, you'd get wires up past Newbury as well as to Oxford by the time BEMUs come in. Battery units are far better suited for branch lines than intercity corridors.It's 3 units required for Basingstoke now Green Park is open, isn't it? So assuming the e electric trains are no faster than turbos, that'd be 7 for the Thames Valley, plus whatever is needed for Bedwyn and Oxford. Probably looking at around 12-15 to be kept in the area including a couple of spares - certainly not a microfleet overall if they're the same trains as used in the other areas.
Though without some wiring being added to what's there now it's unlikely that the units would be able to have their pans up enough to last a whole day of shuttling. I don't know at what point the whole thing would fall into "just do the job properly and use proper electric trains" territory.
I think it is a very safe assumption that any new BEMUs would be quite a bit faster than Turbos.So assuming the e electric trains are no faster than turbos
Oxford certainly does (it's already got 387s waiting to take over the service and a bi-modes that'd benefit), Basingstoke probably does (2tph + potential for bi-mode freight to use electric mode). The Branches less so. bedwyn on it's own wouldn't justify a project to finish it off but OLE out to Westbury/Castle Cary and potentially on to Taunton or Exeter might be able to make a case if the IETs were looking to replace gensets with battery packs., that'd be 7 for the Thames Valley, plus whatever is needed for Bedwyn and Oxford. Probably looking at around 12-15 to be kept in the area including a couple of spares - certainly not a microfleet overall if they're the same trains as used in the other areas.
Though without some wiring being added to what's there now it's unlikely that the units would be able to have their pans up enough to last a whole day of shuttling. I don't know at what point the whole thing would fall into "just do the job properly and use proper electric trains" territory.
With the pan up, sure. But there will be a performance/ range/ battery lifespan compromise that will need to be made on routes like those in the Thames valley where a pretty small proportion will be on electrified sections. They might actually end up only matching the turbos.think it is a very safe assumption that any new BEMUs would be quite a bit faster than Turbos
I think they'd have to be extremely conservative to get equal performance to a Turbo from a new BEMU, even in end-of-life condition. I would expect all Thames Valley branches to have the bay platforms electrified and a length up the branch suitable for shunting in and out if the battery plays up.With the pan up, sure. But there will be a performance/ range/ battery lifespan compromise that will need to be made on routes like those in the Thames valley where a pretty small proportion will be on electrified sections. They might actually end up only matching the turbos.
I agree on both counts. Even if a BMMU cascade to XC is quite a long way off.Reading to Basingstoke and Didcot to Oxford are both sections of trunk routes and should justify having the job done properly. It's not imminent but Bi modes will come to XC as well, which will be able to make use of both sections.
At Basingstoke you'd have the issue of having both OHLE and 3rd rail in the same station. Then the question of whether it's worth converting the third rail network to OHLE arises.Reading to Basingstoke and Didcot to Oxford are both sections of trunk routes and should justify having the job done properly. It's not imminent but Bi modes will come to XC as well, which will be able to make use of both sections.
The key thing with those sections (also Sheffield to Derby, though possibly to a lesser extent) is that there are services running today which would benefit, and in future the benefits will multiply further.agree on both counts. Even if a BMMU cascade to XC is quite a long way off.
If batteries are deployed then you can forget the diesel. If the battery can't be relied upon in situations which can be forseen then it shouldn't be used at all.At Basingstoke you'd have the issue of having both OHLE and 3rd rail in the same station. To make use of electric power in as many places as possible, a new XC intercity unit would require pantographs, batteries, third rail shoes as well as a diesel engine as a backup. A highly complex ask for any train manufacturer.
At Basingstoke it would be easy to keep the OLE into Platform 5 andAt Basingstoke you'd have the issue of having both OHLE and 3rd rail in the same station.
I imagine that by the time XC are being ordered new units, fitting them with internal combustion gensets will be banned. The 777s are capable of being fitted with 3rd Rail + Pan or 3rd rail + battery, it's only space that prevents all 3 being fitted at the same time. XC units would presumably be long enough to solve that issue.To make use of electric power in as many places as possible, a new XC intercity unit would require pantographs, batteries, third rail shoes as well as a diesel engine as a backup. A highly complex ask for any train manufacturer.
A smaller scale version of Reading!Basingstoke it would be easy to keep the OLE into Platform 5 and not have an extremely short un-electrified crossover keeping the DC separate. AC and DC are a serious issue if on the same track, but if kept isolated from each other then even on parallel tracks they're much less of a problem for each other
Reading, Highbury & Islington, and the DC lines from Queens Park to Watford Junction.A smaller scale version of Reading!
Allerton/ Hunts Cross, the LTS along the district line...Reading, Highbury & Islington, and the DC lines from Queens Park to Watford Junction.
Why can’t OHLE and Third Rail coexist? Are we forgetting about Ashford International or the Thameslink Core?At Basingstoke you'd have the issue of having both OHLE and 3rd rail in the same station. Then the question of whether it's worth converting the third rail network to OHLE arises.
To make use of electric power in as many places as possible, a new XC intercity unit would require pantographs, batteries, third rail shoes as well as a diesel engine as a backup. A highly complex ask for any train manufacturer.
It's possible but very complicated.Why can’t OHLE and Third Rail coexist? Are we forgetting about Ashford International or the Thameslink Core?
Why can’t OHLE and Third Rail coexist? Are we forgetting about Ashford International or the Thameslink Core?
I think the North Downs line's gaps are less than 15 miles in total?Only if you opened a station for Heysham itself and extended the Morecambe service onto there. But that's getting a bit off-topic.
Is there any single gap 15 miles or less in length that would allow a service to immediately be replaced by EMUs?
Marlow will always need a "micro-fleet" of some sort. The current Turbos still based at Reading excepted though it's a smaller fleet than it used to be. Whether you put the wires up on the full length of each branch or use batteries, you still need a few non-standard 2-car units to do the Bourne End reversal.The Thames Valley Branches could still make sense. It prevents having a microfleet of battery trains.
And also one other thing. What’s the point of not electrifying the Greenford Branch when it anyways needs electrification when it becomes Chilterns turn to be electrified?Marlow will always need a "micro-fleet" of some sort. The current Turbos still based at Reading excepted though it's a smaller fleet than it used to be. Whether you put the wires up on the full length of each branch or use batteries, you still need a few non-standard 2-car units to do the Bourne End reversal.
As others have said, having dc and ac electrification at the same location is possible (clearly) but best avoided. It causes complications with the earthing and return current wiring. (AC) transformers really don't like even small levels of dc current flowing through them, and one maxim for electrical gear is that unless you absolutely prevent current from passing via a particular route it will find some way of doing so.
Possible - absolutely. Whether it's the best thing to do would be up to the designers of the system should it be built (and would also be subject to other factors such as whether the AC was going to continue beyond Basingstoke).Interesting, thanks for the detail. Where overhead and third rail systems meet, for example at Basingstoke should the Reading line ever be wired, would changing over on the move be feasible, to allow a section of dual electrification on the double line approaching Basingstoke? Presumably Eurostars changed over on the move, pre HS1.
What's most likely IMO is that future dual voltage trains will be fitted with smallish batteries so that the systems can be kept separate.
I would even advocate it for some existing changeovers, such as Thameslink where the equipment to try and control the return current is spectacularly complex. Just chuck it in the bin and use a battery between City TL and Farringdon. At least when it's time to renew those trains!That would be a sensible and relatively simple solution.