Moderator note: Split from
www.railforums.co.uk
Major disruption to / from Manchester Piccadilly expected until the end of the day - 16th April 2026
See; https://www.nationalrail.co.uk/service-disruptions/manchester-piccadilly-20260416/ Damage to the overhead electric wires at Manchester Piccadilly means that some lines are blocked. As a result, trains running to / from this station may be cancelled or severely delayed by up to 60 minutes...
It should be used as evidence for bi-mode trains! Very versatile in the event of power failures or dewirements, once it has been cleared of the line of course. The Pendolino would've been clear of the line much quicker if it had diesel/battery backups.The OLE here is very old. I believe many of the wire runs here are DC conversion, so the original wires from the 1950s. All wires are fixed-termination, which is a system no longer used. This failure might highlight the vulnerability of extremely old OLE (if it is an age related failure). Not of OLE in general. I don’t think this should be used as evidence against new electrification.
Last edited by a moderator: