Does the 16th April Manchester dewirement incident demonstrate the need for more bi-mode trains?

Status
Not open for further replies.

saismee

Established Member
Joined
20 Oct 2023
Messages
1,763
Location
UK
Moderator note: Split from

The OLE here is very old. I believe many of the wire runs here are DC conversion, so the original wires from the 1950s. All wires are fixed-termination, which is a system no longer used. This failure might highlight the vulnerability of extremely old OLE (if it is an age related failure). Not of OLE in general. I don’t think this should be used as evidence against new electrification.
It should be used as evidence for bi-mode trains! Very versatile in the event of power failures or dewirements, once it has been cleared of the line of course. The Pendolino would've been clear of the line much quicker if it had diesel/battery backups.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

185143

Established Member
Joined
3 Mar 2013
Messages
5,373
It should be used as evidence for bi-mode trains! Very versatile in the event of power failures or dewirements, once it has been cleared of the line of course. The Pendolino would've been clear of the line much quicker if it had diesel/battery backups.
There's probably a good few hundred people who spent the night on either an Azuma or Hull Trains 802/3 that would argue against you there!
 

voyagerdude220

Established Member
Joined
13 Oct 2005
Messages
4,290
The Pendolino would've been clear of the line much quicker if it had diesel/battery backups.
Are you sure about that? I'm guessing there would still need to be some work carried out to de tangle the Pendolino's Pantograph and free it from the wires.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,763
Location
UK
Are you sure about that? I'm guessing there would still need to be some work carried out to de tangle the Pendolino's Pantograph and free it from the wires.
They would need to ground the OHLE and ensure it won't come down further, but it wouldn't need sourcing of locomotives from other companies. Depends on the situation.
 

blimmo

Member
Joined
30 Jul 2025
Messages
672
Location
West Mids
It should be used as evidence for bi-mode trains! Very versatile in the event of power failures or dewirements, once it has been cleared of the line of course. The Pendolino would've been clear of the line much quicker if it had diesel/battery backups.
I'm not sure about that. Carrying around your own power plant for the odd time you'll need to use it in disruption isn't exactly efficient.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,763
Location
UK
I'm not sure about that. Carrying around your own power plant for the odd time you'll need to use it in disruption isn't exactly efficient.
An emergency battery to limp to a platform would be enough. I'm sure it wouldn't add too much weight.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,329
I'm not sure about that. Carrying around your own power plant for the odd time you'll need to use it in disruption isn't exactly efficient.
Quite. The current trend on the forum to suggest batteries for everything ignores that (and all the other never addressed issues with batteries)

== Doublepost prevention - post automatically merged: ==

An emergency battery to limp to a platform would be enough. I'm sure it wouldn't add too much weight.
And predictably, here's the battery "solution"!
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,763
Location
UK
Quite. The current trend on the forum to suggest batteries for everything ignores that (and all the other never addressed issues with batteries)

== Doublepost prevention - post automatically merged: ==


And predictably, here's the battery "solution"!
GWR 80xs have emergency engines, a battery seems more reasonable. Would likely still need detraining first though.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
810
Location
London
I'm not sure about that. Carrying around your own power plant for the odd time you'll need to use it in disruption isn't exactly efficient.
Having a back up generator in the basement is expensive and inefficient, done for the rare occasions the power goes out. Hospitals still have them as power loss is a foreseeable event and the consequences of no power can be fatal.

For trains the consequences are much lower, though disruption happens more frequently. Diesels add a lot more moving parts and fuel logistics, batteries avoid much of that. Batteries can distribute more power than a single engine can though have much lower range. Either way, the weight addition is small around 2% of a 5-car IET. The battery trial achieved a range of over 40 miles for that 2% and could possibly go for a smaller battery if only for disruptions. The energy from the backup power will be less efficient as well, but wouldn't be used often.

The slightly quicker and cheaper recovery, possibility to delay permanent repair until quieter times and other incident types could be worth more than those inefficiencies. Some of those might only be realised once every EMU in the area has fallback capability, but will need to start somewhere.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,490
Location
Somerset
GWR 80xs have emergency engines, a battery seems more reasonable. Would likely still need detraining first though.
Not emergency engines - but ones used in service every day. Unless there are any diagrams for IETs that are restricted to London - Cardiff and Newbury for the whole day, then I suspect all GWR IET diagrams require diesel running daily.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,392
A battery or generator aboard the train also keeps passengers comfortable and not panicking by ensuring the air con, toilets, lighting and power sockets continue to work - if there is a buffet it will also continue to work.

Which is why the "electric only" Class 801 has them.

I can't see a reason for a similar capability not to be provided on all new trains. Either a generator/prime mover or chunky traction battery.

EDIT: It would, as noted, also substantially ease the logistics of getting everything unblocked. Having every train capable of moving under its own power would remove the need to wait for freight locomotives/thunderbirds or mess around with universal couplings.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
There's probably a good few hundred people who spent the night on either an Azuma or Hull Trains 802/3 that would argue against you there!
Do you mean Lumo? Hull Trains operate bimodes to cover unelectrified line from ECML to Hull.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,763
Location
UK
Not emergency engines - but ones used in service every day. Unless there are any diagrams for IETs that are restricted to London - Cardiff and Newbury for the whole day, then I suspect all GWR IET diagrams require diesel running daily.
Not sure where my other post went, it didn't seem to make the jump to this new thread. I was thinking of LNER 801s.
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,610
A battery or generator aboard the train also keeps passengers comfortable and not panicking by ensuring the air con, toilets, lighting and power sockets continue to work - if there is a buffet it will also continue to work.

Which is why the "electric only" Class 801 has them.

I can't see a reason for a similar capability not to be provided on all new trains. Either a generator/prime mover or chunky traction battery.

EDIT: It would, as noted, also substantially ease the logistics of getting everything unblocked. Having every train capable of moving under its own power would remove the need to wait for freight locomotives/thunderbirds or mess around with universal couplings.
Except that when I was on an 801, and the GU needed to be used, the air conditioning was heavily reduced and the environment became very humid and warm very quickly, with only just enough air conditioning to stop the carriage steaming up. That was very late on a late September night.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,679
Location
Northampton
I can't see a reason for a similar capability not to be provided on all new trains. Either a generator/prime mover or chunky traction battery.
And of the two, a traction battery is by far the better answer.
- Elimination of diesel use (and associated logistics, environmental and safety concerns at depots),
- the ability to recapture energy,
- the ability to top up on the move,
- the easier ability to use a "blended" mode for evening out grid demand/better acceleration.
- reduction in particulate emissions at point of use
- ability to be charged from decarbonised power generation
etc,
 