I’m not entirely sure what information people were expecting, there was a suicidal male being dealt with by the police Negotiators. There would be nothing to tell network rail and LNER until the police declared the incident over. It was one of those how longs a piece of string situations. The main issues are the lack of bi mode units and crew knowledge over the joint, plus when delays extend so far into the evening the lack of station staff to deal with thousands of stranded passengers at the very end of the day. People shouting for taxis and buses, where exactly are you expecting to source them from for probably 10,000 people
I can tell where my Mother/Father/Significant Other is via our smartphone location services.
I can tell where my suitcase is in an airport via my iPhone and an AirTag.
When LNER's latest update is telling passengers that their 233 metre long, 420 tonne piece of machinery, which should have been in London twenty minutes previously, is 'departing Edinburgh ten minutes late' but is
actually in Newcastle and isn't going any further, I think we can say that even at the most basic level, information communication and quality is crassly poor.
The ripple effect from that will be waste, inconvenience and discomfort at the very least.
It shouldn't take 'enthusiasts' to work out what's going on.
And, I'd posit, bimodes and diversions are largely irrelevant to the very significant number of passengers travelling over both shorter and some longer distances whose journeys do not reach the point of disruption.
When the timetable is built around the dominance of high-frequency, through, long distance services at the expense of much else, the contagion caused by any localised disruption will by default spread far and wide quickly.
When the service between Edinburgh and Doncaster last, which in many cases is 'forced' to provide the local intermediate service because there's 'no room' for locals and regionals, because of an incident at
Retford, simply makes 'the railway' look arrogant at best, and incompetent at worst.
Individual reports also show, as I said earlier, that a great number of staff must have worked themselves to the absolute bone last night - but it's embarrassing that 'the railway' seems to believe that that's enough contingency, while continuously putting the service under ever greater stress.