Manchester Metrolink: how could it be improved?

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,385
Location
A typical commuter-belt part of north-west England
Dual Voltage trains, of course! Castlefield desperately needs replacement with a tunnel. They say that perfect is the enemy of good. In my opinion, good is the enemy of ambition. England is such a London-centric country that some true investment outside the south-east would benefit national perceptions enough to sway a general election.
What time-period plans do Merseyrail have for Dual Voltage trains as stated above and what will be the fleet size and financial cost of them?

What is the most recent official view on the replacement of the Castlefield line by a tunnel and what costs have been cited for it and its connection with the existing rail network?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
I agree, you could link Merseyrail to the CLC and the Chat Moss line, and have trains run through to places like Rochdale and Glossop. The distances are short enough for a system like this to work.

No, you absolutely could not.

Two reasons:

1. Imported delays from Castlefield would destroy the punctuality of Merseyrail. It's a very tightly run ship on very constrained infrastructure. It only works because it's self-contained and so very punctual - Liverpool Central would be a disaster if Castlefield (or even Victoria) "punctuality" was brought in.

2. To serve Glossop (and most useful places to link it to) you would need to cross the formation at Piccadilly several times an hour, which wouldn't be acceptable.

The only way you could create a workable "Lizzie of the North" would be a wholly self contained new build line.

== Doublepost prevention - post automatically merged: ==

Dual Voltage trains, of course! Castlefield desperately needs replacement with a tunnel. They say that perfect is the enemy of good. In my opinion, good is the enemy of ambition. England is such a London-centric country that some true investment outside the south-east would benefit national perceptions enough to sway a general election.

Nobody is calling for what you suggest and it would be negative in result. Spending money on Metrolink (e.g. an underground city crossing and longer single-unit trams) and the once proposed Merseytram would be much more popular if you want to benefit these two cities. Or even better give Leeds something!
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,205
Location
Oxford
Since this is fantasy land, turn the whole CLC local service over to Merseyrail to run at 4tph. (Buy battery units if electrification is too much of a leap)

Then build a station at Deansgate on the old Manchester Central approach viaduct near the tram stop. The interchange with the Castlefield line and trams there ought to give enough onward local journey opportunities, and if you're going from Warrington to Piccadilly and beyond there are trains from Bank Quay.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
Since this is fantasy land, turn the whole CLC local service over to Merseyrail to run at 4tph. (Buy battery units if electrification is too much of a leap)

Then build a station at Deansgate on the old Manchester Central approach viaduct near the tram stop. The interchange with the Castlefield line and trams there ought to give enough onward local journey opportunities, and if you're going from Warrington to Piccadilly and beyond there are trains from Bank Quay.

I think I'd use a less polite phrase than fantasy land there. This would only be feasible without destroying punctuality at Liverpool Central if there was a new terminus, say a reopened Manchester Central, and so the trains did not interact in any way with Castlefleid, and the Liverpool-Norwich and TPE were both truncated to Manchester Piccadilly and removed from the CLC, those two (particularly the Norwich) being the main cause of punctuality issues on the line.

Merseyrail only works because it is fully* isolated from the rest of the network. The Loop and Link are operated more intensively than Castlefield, remember.

The only sensible way to have Merseyrail running onto the CLC is buffer stops at Warrington Central and Metrolink probably picking up the other side. Though there are also reasons not to do that, and I think there are other routes I'd prioritise Metrolinking first, e.g. Atherton would be my highest priority (which would also enable connecting Leigh to Metrolink instead of the misguided bus thing).

* Yes, I know, there are technical exceptions, i.e. Chester and Hunts Cross, but it's close enough.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,205
Location
Oxford
This would only be feasible without destroying punctuality at Liverpool Central if there was a new terminus, say a reopened Manchester Central, and so the trains did not interact in any way with Castlefleid
That is exactly what I was getting at. Only local trains on the CLC, use the empty viaduct to access a new station next to the tram stop at Deansgate. Change there for the Castlefield line and local trams.

I doubt the local politics would support Merseyrail trains into central Manchester, but it would get stuff off Castlefield and improve the service at all CLC stations without requiring a change for journeys like Widnes to central Manchester.

In fact, I don't know what capacity is like on the Liverpool South Parkway to Lime St bit, but a new terminus at Deansgate might allow the local service to be multiplied without any further splitting, whilst removing trains and conflicts from Castlefield.
 
Last edited:

Topological

Established Member
Joined
20 Feb 2023
Messages
4,252
Location
Swansea
I think I'd use a less polite phrase than fantasy land there. This would only be feasible without destroying punctuality at Liverpool Central if there was a new terminus, say a reopened Manchester Central, and so the trains did not interact in any way with Castlefleid, and the Liverpool-Norwich and TPE were both truncated to Manchester Piccadilly and removed from the CLC, those two (particularly the Norwich) being the main cause of punctuality issues on the line.

Merseyrail only works because it is fully* isolated from the rest of the network. The Loop and Link are operated more intensively than Castlefield, remember.

The only sensible way to have Merseyrail running onto the CLC is buffer stops at Warrington Central and Metrolink probably picking up the other side. Though there are also reasons not to do that, and I think there are other routes I'd prioritise Metrolinking first, e.g. Atherton would be my highest priority (which would also enable connecting Leigh to Metrolink instead of the misguided bus thing).

* Yes, I know, there are technical exceptions, i.e. Chester and Hunts Cross, but it's close enough.
Agree about not getting Merseyrail caught up in the Manchester mess.

I am less worried about a buffer stop approach at Warrington Central. Although I would look at options to take a single-track approach if there is a way to squeeze a Manchester terminating platform to the North of the current station. Ideally, Merseyrail would arrive at the Eastbound platform and then depart over a crossover to head West. That way there would be no buffers blocking the line to through services (if ever needed). The same could be obtained without a new Manchester platform, but that would not be cross-platform interchange and is not ideal.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
Agree about not getting Merseyrail caught up in the Manchester mess.

I am less worried about a buffer stop approach at Warrington Central. Although I would look at options to take a single-track approach if there is a way to squeeze a Manchester terminating platform to the North of the current station. Ideally, Merseyrail would arrive at the Eastbound platform and then depart over a crossover to head West. That way there would be no buffers blocking the line to through services (if ever needed). The same could be obtained without a new Manchester platform, but that would not be cross-platform interchange and is not ideal.

I don't know if the station is listed, but it's not exactly an impressive building. To be honest, if this option is taken (and I'm not sure it will be, but if it was), I think it would be worth completely demolishing the station and rebuilding a new one with a wide island platform with trams on one side and trains on the other (perhaps fairly long platforms with mid-platform crossovers on both sides to give in effect two platforms for each). If it's actual trams, the through running would have to be given up on as the platforms would clout mainline stock. Northern Powerhouse Rail, if built, would replace it on the Liverpool-Warrington-Manchester axis anyway.

Otherwise you could just whack in buffer stops and do an Ormskirk with it.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,725
Location
Worcester
Don't you think that the Leigh guided busway on its dedicated section with just a few well-spaced stops does a good job?
Living in Leigh for a year until I moved last month, it’s fine, but replacing the every 15 minute bus service (every 4 in peaks) with a double tram every 12 minutes would elevate the service enormously.

Every three minutes from Tyldesley during peaks, with every fourth service doing the V2 Atherton branch (which would have a standard every twelve minute service all day) — gorgeous stuff.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
Don't you think that the Leigh guided busway on its dedicated section with just a few well-spaced stops does a good job?

It's not as good as a tramway. But to sensibly Metrolink it you need to convert Atherton too, unless you want some very long, slow street running through Salford. It's one of the reasons I support converting Atherton.

(Yes, doing Atherton will require street running at the Wigan and Salford ends anyway, but not to the same extent)
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
Though there are also reasons not to do that, and I think there are other routes I'd prioritise Metrolinking first, e.g. Atherton would be my highest priority (which would also enable connecting Leigh to Metrolink instead of the misguided bus thing).
If there was to be any existing heavy rail service I'd consider converting in the near term, it absolutely would be this one. It's relatively self contained and isnt a particularly fast line. Absolutely would be improved with more modern trams, especially if next generation trams were 100km/h units.


(Yes, doing Atherton will require street running at the Wigan and Salford ends anyway, but not to the same extent)
Would it? Would terminating services in Wigan not be possible? If wallgate isn't possible due the the lack of east facing bays and possible lack of space to build some, how well used is p1 at northwestern and the 2 bays there?


At the Salford end might it not potentially form a part of one of Burnhams tram tunnels? Has TFGM published a proposed route(s) for the tunnel? Or is it still just a vague aspiration to build one with no say of where?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
Would it? Would terminating services in Wigan not be possible? If wallgate isn't possible due the the lack of east facing bays and possible lack of space to build some, how well used is p1 at northwestern and the 2 bays there?

I'm assuming tram rather than tram-train. The route would have to be shared between Hindley and Wigan unless you went on street. Tram train would be an option, in that case if the units were 25kV capable or had batteries for a fairly long run (Hindley-Wigan and back) you could run into North Western bays.

As this wouldn't primarily be about Wigan-Manchester journeys (as these would still operate via Bolton - you're creating something similar to Rochdale here where the train does the fast end to end and the tram does a slower trip more about connectivity) I'm not sure the street running idea would be that bad an idea, it would improve access to Wigan from the Hindley side.

it looks, though, like it might be possible to use the old line west of Hindley to get most of the way to the middle of Wigan, so it'd just be Hindley itself and about a mile each side. That might be possible as a Navigation Road type single line split.

== Doublepost prevention - post automatically merged: ==

At the Salford end might it not potentially form a part of one of Burnhams tram tunnels? Has TFGM published a proposed route(s) for the tunnel? Or is it still just a vague aspiration to build one with no say of where?

Not sure how detailed the plans are there so far - probably not very! But it wouldn't be a long section of street running from Pendleton to the city centre, unlike if you just converted the busway.

The other option for the busway would be to send it to Eccles, but that would be a very slow run into Manchester probably inferior to the present bus service.
 
Last edited:

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
it looks, though, like it might be possible to use the old line west of Hindley to get most of the way to the middle of Wigan,
How would that work? Doesn't that line totally bypass the town? The only way I could see it working is coming in via the north towards central park way which would bypass most population centres.

I feel tram train would be easier for this route as it'll only have to mix with 2tph via Bolton and I don't think any freight uses the line which solves that complication. I feel this is possibly one of the easiest lines to trial tram trains on as opposed to Stockport way which has to deal with freight or Heywood having to deal with ELR.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
How would that work? Doesn't that line totally bypass the town? The only way I could see it working is coming in via the north towards central park way which would bypass most population centres.

My thought was to head south west onto that line to meet the A49 then turn sharp right (trams can do that!) and head in that way. Not sure of the lay of the land in terms of fitting a line alongside the A49 though.

I feel tram train would be easier for this route as it'll only have to mix with 2tph via Bolton and I don't think any freight uses the line which solves that complication. I feel this is possibly one of the easiest lines to trial tram trains on as opposed to Stockport way which has to deal with freight or Heywood having to deal with ELR.

Might well be easier to be honest. Would need to be 25kV capable or battery, though, it's a bit more complex than Rotherham where it was diesel only before so you could just put tram wires up.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
Might well be easier to be honest. Would need to be 25kV capable or battery, though, it's a bit more complex than Rotherham where it was diesel only before so you could just put tram wires up.
Feel free to correct me but I thought Rotherham was built to 25kV and the trams are dual voltage. Any other GM tram-trains are likely to need to be dual voltage anyway as electrification is expanding quite rapidly at the moment across the region with very few lines now avoiding any significant running under wires (maybe just the Calder valley services starting in Victoria which avoid enough existing electrification for possibly put up DC tram wires. Though Rochdale is also proposed for electrification at 25kv so not even that may last long. All other diesel routes have large portions under wires still.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
Feel free to correct me but I thought Rotherham was built to 25kV and the trams are dual voltage.

Supposedly the trams are dual voltage for futureproofing but the OHLE is presently 750VDC because it is only used for the trams. More info here:


Overhead Line System

• Brand new Network Rail approved OLE system

• Based on the OLEMI Series 2 range

• The OLE is a 750V DC system

• Main change is no traction return for fault control

• Double insulation used as fault protection

• New standard design range and Green Book produced for the project

• Traction bonding designed specifically for thescheme

It does look like normal Network Rail OHLE though, presumably for ease of installation and futureproofing if converted.

Any other GM tram-trains are likely to need to be dual voltage anyway as electrification is expanding quite rapidly at the moment across the region with very few lines now avoiding any significant running under wires (maybe just the Calder valley services starting in Victoria which avoid enough existing electrification for possibly put up DC tram wires. Though Rochdale is also proposed for electrification at 25kv so not even that may last long. All other diesel routes have large portions under wires still.

Yes, true.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,385
Location
A typical commuter-belt part of north-west England
Since this is fantasy land, turn the whole CLC local service over to Merseyrail to run at 4tph. (Buy battery units if electrification is too much of a leap)
It may well be the fantasy land that you speak of, but this thread concerns itself in its thread title with improvements to the Manchester Metrolink system. Talk of turning the heavy rail CLC services to Merseyrail seems to have strayed somewhat from the raison d'etre of this thread as I wonder how many Metrolink tram stops are currently situated on the line of the CLC.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
It may well be the fantasy land that you speak of, but this thread concerns itself in its thread title with improvements to the Manchester Metrolink system. Talk of turning the heavy rail CLC services to Merseyrail seems to have strayed somewhat from the raison d'etre of this thread as I wonder how many Metrolink tram stops are currently situated on the line of the CLC.
The conversation though has been on whether the CLC would be a good candidate for metrolink conversion and suggesting alternatives is a way of saying why it isn't a suitable metrolink expansion. The CLC however seems to be the most controversial proposal for any such conversion
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,385
Location
A typical commuter-belt part of north-west England
The conversation though has been on whether the CLC would be a good candidate for metrolink conversion and suggesting alternatives is a way of saying why it isn't a suitable metrolink expansion. The CLC however seems to be the most controversial proposal for any such conversion
Maybe, being an old-stager of 81, I find myself unable to comprehend why heavy-rail train services with proper train seating are viewed as lesser to what trams or tram-trains have to offer to the travelling public.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,205
Location
Oxford
Maybe, being an old-stager of 81, I find myself unable to comprehend why heavy-rail train services with proper train seating are viewed as lesser to what trams or tram-trains have to offer to the travelling public.
Like for like, certainly. The comparison being offered is 1 or 2 tph of "proper" trains, or 4+ per hour of trams/ tram trains. On most suburban branches around Manchester, 2tph is about all you could hope for because of the constraints around the central area. Doubling (or more) that frequency could result in a much better overall offering, even if the vehicles themselves haven't improved.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
Maybe, being an old-stager of 81, I find myself unable to comprehend why heavy-rail train services with proper train seating are viewed as lesser to what trams or tram-trains have to offer to the travelling public.
Like for like, certainly. The comparison being offered is 1 or 2 tph of "proper" trains, or 4+ per hour of trams/ tram trains. On most suburban branches around Manchester, 2tph is about all you could hope for because of the constraints around the central area. Doubling (or more) that frequency could result in a much better overall offering, even if the vehicles themselves haven't improved.
Take Oldham. At one time, they could never have imagined having 10tph (now 8tph) into victoria and certainly not deansgate or south west Manchester
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,385
Location
A typical commuter-belt part of north-west England
Like for like, certainly. The comparison being offered is 1 or 2 tph of "proper" trains, or 4+ per hour of trams/ tram trains. On most suburban branches around Manchester, 2tph is about all you could hope for because of the constraints around the central area. Doubling (or more) that frequency could result in a much better overall offering, even if the vehicles themselves haven't improved.
What must not be forgotten is Mayor Burnham and his pet "Bee Network" project where buses and new bus interchanges were his number one priority with bus service introductions in three tranches under a system similar to what London has. It was only much later when other modes of public transport entered into his official discussions, such as the eight heavy rail lines that are to be part of the Bee Network, in the "Burnham Yellow" livery, in years to come. One may well think that if TfGM feel that 4tph are a feasible prospect on those eight lines, it will enter into the public domain to inform the travelling public.

Is it not the case currently that the Metrolink service provision is to be time-lengthened to only 4 trams per hour, but using double-tram units?
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,385
Location
A typical commuter-belt part of north-west England
It's up from 12 minute headways to 15 minute ones, but any route that has more than one such service still will have.
I have travelled recently on trams from Victoria where up to St Weberghs Road, both the East Didsbury line and the Airport line trams run, which admittedly offer passengers to Firswoof and Chorlton the service you intimate above, but passengers travelling after that from there to the stops in the Didsbury and Wythenshawe areas do not gain such benefit.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
after that from there to the stops in the Didsbury and Wythenshawe areas do not gain such benefit.
Didsbury does still have 2 services, on Rochdale and one shaw service giving disbury 8tph still


Given the political difficulty of removing long distance airport services, I wonder what the prospect is of converting the a34 Kingsway back to tram operations as am I correct in saying the central reservation once had them? This would surely give burnage and maulduth road at least better services to Manchester and provide some connectivity for areas beyond that as there's still a large gap from maulduth road into Piccadilly
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,385
Location
A typical commuter-belt part of north-west England
Given the political difficulty of removing long distance airport services, I wonder what the prospect is of converting the a34 Kingsway back to tram operations as am I correct in saying the central reservation once had them? This would surely give burnage and maulduth road at least better services to Manchester and provide some connectivity for areas beyond that as there's still a large gap from maulduth road into Piccadilly
An interesting supposition. Where on the A34 will this tram service start and end and will it cause any road traffic difficulties on what must be a very heavily used road in the south of Manchester. The current road junctions in the Parrs Wood area of East Didsbury are notorious.
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,488
Location
Cheshire
Didsbury does still have 2 services, on Rochdale and one shaw service giving disbury 8tph still


Given the political difficulty of removing long distance airport services, I wonder what the prospect is of converting the a34 Kingsway back to tram operations as am I correct in saying the central reservation once had them? This would surely give burnage and maulduth road at least better services to Manchester and provide some connectivity for areas beyond that as there's still a large gap from maulduth road into Piccadilly
I'd say rather than use the A34 all the way, use Oxford Road / Wilmslow Road down as far as Fallowfield. From there dogleg it onto the A34 on to wherever would be best. This would then hook up Oxford Road to the network, as well as the University. Yes there's a narrow section going to through the curry mile, but from what I can tell this route is already speed limited so it's not going to be as massive an impact as one of the bigger routes going south. Plus it gets in into an area that could open up another option to reach Stockport. It might even be possible to get a second, slightly faster route into the airport. But most of all it would plug a major hole in the network that would surely benefit lots of people in the Manchester sprawl.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
An interesting supposition. Where on the A34 will this tram service start and end and will it cause any road traffic difficulties on what must be a very heavily used road in the south of Manchester. The current road junctions in the Parrs Wood area of East Didsbury are notorious.
It would only be Able to run as far as parrs wood anyway. Any further than that would be difficult as density decreases and the road wasn't ever designed for trams either. Parr's wood obwoildnt say is a particularly large source of congestion. The only badly congested junction along there imo would be gately and that's well beyond the scope of a tram running down that road.

I'd say rather than use the A34 all the way, use Oxford Road / Wilmslow Road down as far as Fallowfield. From there dogleg it onto the A34 on to wherever would be best. This would then hook up Oxford Road to the network, as well as the University. Yes there's a narrow section going to through the curry mile, but from what I can tell this route is already speed limited so it's not going to be as massive an impact as one of the bigger routes going south. Plus it gets in into an area that could open up another option to reach Stockport. It might even be possible to get a second, slightly faster route into the airport. But most of all it would plug a major hole in the network that would surely benefit lots of people in the Manchester sprawl.
Oxford road could work, however I feel youd have to move over to birchfields road. The road is a lot wider, has less cycle traffic (which doesn't mix well with tram tracks) and is poorer served by existing transport. As well it has a lot more space to incorporate stops as metrolink doesn't allow road traffic to drive through stops.

Problem with curry mile is, if you forget the traffic, the only space for stops are out the front of the Tesco express by moss lane and there's no more space to build one until you reach platfields. That will be immensely unpopular skipping the main traffic generators on the route.

Issue with the whole I don't know how big a traffic generator the university would be towards south Manchester. Most of the traffic is to/from the student accomodation along the Wilmslow road corridor. I don't know if extending towards Slade lane would be more feasible. Certainly at the top the dual carriageway section isn't needed. Only issue is you end in longsite which is possibly even trickier than the curry mile.

== Doublepost prevention - post automatically merged: ==

Princess parkway would be another option but there's definitely sections that would require narrowing. Perhaps a cut and cover tunnel might not be too expensive and possibly not massively disruptive if you could temporarily narrow the road to a single carriageway? Certainly in fantasy land anyway
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,488
Location
Cheshire
Oxford road could work, however I feel youd have to move over to birchfields road. The road is a lot wider, has less cycle traffic (which doesn't mix well with tram tracks) and is poorer served by existing transport. As well it has a lot more space to incorporate stops as metrolink doesn't allow road traffic to drive through stops.
To be honest if cycle users don't mix well with tram services, then that's as much about the the cyclists than it is about the trams. Wherever you have tram street running, it's going to interact with cycle traffic. So cycle traffic cannot be a blocker, especially given that those trams can likely take a lot more traffic off the roads which only benefits cycle users.

Problem with curry mile is, if you forget the traffic, the only space for stops are out the front of the Tesco express by moss lane and there's no more space to build one until you reach platfields. That will be immensely unpopular skipping the main traffic generators on the route.
A cursory glance using Google Street suggests there are a series of parking spots that could easily be used. It might be tight in sections, and I'm sure some would complain but this is about making a modal shift, and a few parking spots should again not be blockers. Plus again this scheme would be aimed a taking traffic off the roads, especially through traffic leaving the route primarily for for trams / buses / local traffic / cyclists.

Issue with the whole I don't know how big a traffic generator the university would be towards south Manchester. Most of the traffic is to/from the student accomodation along the Wilmslow road corridor. I don't know if extending towards Slade lane would be more feasible. Certainly at the top the dual carriageway section isn't needed. Only issue is you end in longsite which is possibly even trickier than the curry mile.

== Doublepost prevention - post automatically merged: ==

Princess parkway would be another option but there's definitely sections that would require narrowing. Perhaps a cut and cover tunnel might not be too expensive and possibly not massively disruptive if you could temporarily narrow the road to a single carriageway? Certainly in fantasy land anyway
There's plenty of scope for debate for how best to serve South Manchester, and plenty of route options. But getting Metrolink into this area ought to be the big priority in my opinion. It would likely need a rolling programme so as not to cause too much chaos, say starting out by heading out to University, then in the next phase to Fallowfield, then out towards Stockport.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
A cursory glance using Google Street suggests there are a series of parking spots that could easily be used. It might be tight in sections, and I'm sure some would complain but this is about making a modal shift, and a few parking spots should again not be blockers. Plus again this scheme would be aimed a taking traffic off the roads, especially through traffic leaving the route primarily for for trams / buses / local traffic / cyclists.
Not enough to have 2 lanes of traffic, 2 cycle lanes at least one tram lane, a high level platform to metrolink standards as well as street level access to premises. At a push you might by the job centre fit a single platform, whether it's long enough of a space however I don't know.

Ashton and airport lines are great examples of how much space street running stops need. Half of the Ashton lines problems is the slow weaving in and out of off street stops. For Wilmslow road to work as a tram, either it would need closing to all road traffic, or would need a radical rethink of metrolink design standards and potentially low floor trams to remove the platform problems. Although the high floors allowed the system to be built initially on a budget, I can't help but feel they've otherwise impacted growth by limiting what street runnning sections the system can use.
 