mods note - split from this thread
www.railforums.co.uk
Maybe not the right place to post this... couldn't find a 745 thread but it concerns 755s too anyway.
Supposedly the 745/1s are to have first class fitted and be moved to the Eastern side to operate LST <> NRW and LST <> IPS services, which will now be scheduled with first. 755 triple traction services will be broken down to have higher unit availability, and Stansted Express will be operated by 720s modified with more luggage racks.
I believe this is to facilitate extra peak regional services coming in the new timetable. All exciting changes.
Greater Anglia Class 755s (Regional Trains)
Hi all. I cant seem to find a thread specifically about these trains so i thought i would start one. I just have a few questions. Where are the trains going to be built and tested? Is it Switzerland? I have heard a few different things about them being built and tested in the Czech Republic...
Maybe not the right place to post this... couldn't find a 745 thread but it concerns 755s too anyway.
Supposedly the 745/1s are to have first class fitted and be moved to the Eastern side to operate LST <> NRW and LST <> IPS services, which will now be scheduled with first. 755 triple traction services will be broken down to have higher unit availability, and Stansted Express will be operated by 720s modified with more luggage racks.
I believe this is to facilitate extra peak regional services coming in the new timetable. All exciting changes.
Last edited by a moderator:
