My understanding is that there is/will be a requirement to some degree for something to mitigate overspeed events; it was that which ultimately took place at Sandilands. The driver did indeed lose concentration, but I believe this led to him simply neglecting to slow as required for a bend rather than ‘keeling over’, so to speak. A DSD or similar device would not have made much difference there.Surely the modern trams are driven by line of sight too. That's normal for tramways past and present. The issue at Sandilands was that a driver lost concentration, wasn't it? Hence a DSD required.
Paul Galley very much has the look of a man who has had the rug pulled from under his feet, and I can understand his frustration, even anger. The Heritage volunteers have invested a lot of time getting the workshop visitable, after they had previously made similar efforts to get the main tram shed more presentable only to find their efforts frustrated by the state of the roof. I seem to recall though that the grandiose plans for the redevelopment of the tram shed into a major museum included moving the workshop into the right hand side of shed, because the workshop space was needed by BTS. If Paul and the team had been given guarantees before they started improving the workshop, then shame on the Council for taking those away - but if tarting up the workshop was based more around wishful thinking and hope…
Anyway, I suspect it almost inevitable is that if the workshop goes, then sooner or later so too do Heritage tram operations. Starr Gate doesn’t have the space, the skills or the equipment to undertake major restorations. Yes there’s enough room for a few heritage vehicles which can be maintained there, but when those trams wear out or develop major faults, where are the next set of vehicles going to come from? Trams do eventually expire, even if not used intensively and there needs to be a pipeline, albeit a slow moving one, of restorations to sustain heritage operations long term. The relatively recent Heritage “Enhanced Weekend”s (with maybe seven or eight vehicles out) are a thing of the past and the best tram fans can hope for under current circumstances is a very limited operation, and even that without a long term future.
The ideal - for heritage volunteers and tram fans - might be to sort out the main tram shed and develop Tram Town into the vision that was put forward a couple of years ago. Will that ever happen? Sadly I doubt it because the money isn’t there. It has been suggested that fewer people will visit a Blackpool without the heritage trams, but how many less? Lets be honest, tram fans are merely a drop in the Irish Sea compared to the total number of visitors to the resort. And while I have no doubt the general public like the heritage trams, and some may even pay for a ride on one, how compelling are they really when it comes to making a decision to visit the town? I suspect most normals, even if they are aware of Heritage, would just shrug and make the same decision to visit Blackpool anyway. So I think Heritage needs to cut its cloth according to the current state of the resort, its visitors and the funds that are realistically accessible. That means just two or three heritage trams running on select weekends and during the illuminations. Even that may well not be sustainable long term without the workshop facilities to properly support an operational fleet.
As to the main tram shed… Wouldn’t it be wonderful if the Lottery provided money or some other benevolent funding was to be found (I doubt it’ll come from the council). But I think that’s where the focus needs to be if the workshop closes, because sooner or later that will be the only basis on which it will be feasible to maintain some semblance of historic tram operations in the town. However, there’s also a lot of “junk” in the main tram shed - vehicles robbed for spares, some too far gone to restore, and a lot of duplication (how many Balloons does a tram museum really need?). I think thinning out at Rigby Road is required and that might even raise a bit of money - perhaps Crich, Beamish or Carlton Colville might take some of them, because they are likely to be the places were ‘intensive’ historic tram operations are going to be realistically possible in the future.
The reopening of the workshop always seemed like a bit of a bodge-it job to me - a surrogate or a stop-gap for the big project tram fans want. I hope Paul’s campaign turns the Council around, but what I’d also like to see is more of a focus on what’s really needed to secure long-term sustainability of heritage trams in Blackpool - and I don’t believe that’s just the workshop.
I am not sure they could operate Bolton 66 from Starr Gate; when I hired it a few years ago ( I have a video of this run on my YouTube channel ) for a full system trip, the only loop we could not include was the one through the back of Starr Gate - we had to reverse at the normal stop. The reason given was that there was a clearance issue which meant that Bolton 66 cannot go round the loop there.I very much suspect that the future of heritage ops will look like a couple of select cars based at Starr Gate; 717 and the illuminated frigate seem pretty safe bets, perhaps joined by Boat 600. That pretty much covers most of the potential charter market as well as the heritage tour roster. Bolton 66 very much deserves to remain in service too, but I suspect the final number will be very slim indeed.
I am not surprised. There's been a lot of orders for brand new buses in the last 5-8 years. Unheard off for Blackpool. Traditionally BTS has traded in the 2nd hand market to balance the books.Interesting article from the Blackpool Lead which suggests that Blackpool Transport’s finances are in pretty dire shape:
“Almost £500,000 of taxpayers’ cash has been handed to Blackpool’s transport chiefs to keep the town’s buses and trams running, it can be revealed.
Town Hall bosses have lent Blackpool Transport Services (BTS), a council arms-length company, £478,000 to cover its bills for the month, though the finer details about the bailout are being kept under wraps.
It comes after claims that the resort’s heritage tram service was suspended last winter for financial reasons and not, as was claimed at the time, because of operational and safety-related concerns.”
Full article here:
![]()
Transport company handed almost £500,000 to keep buses and trams running
The finer details of the bailout are being kept out of the public eyeblackpool.thelead.uk
Indeed, I do wonder whether they’ve overspent somewhat in recent years in going ‘posh’.I am not surprised. There's been a lot of orders for brand new buses in the last 5-8 years. Unheard off for Blackpool. Traditionally BTS has traded in the 2nd hand market to balance the books.
For a month?Interesting article from the Blackpool Lead which suggests that Blackpool Transport’s finances are in pretty dire shape:
“Almost £500,000 of taxpayers’ cash has been handed to Blackpool’s transport chiefs to keep the town’s buses and trams running, it can be revealed.
Town Hall bosses have lent Blackpool Transport Services (BTS), a council arms-length company, £478,000 to cover its bills for the month, though the finer details about the bailout are being kept under wraps.
It comes after claims that the resort’s heritage tram service was suspended last winter for financial reasons and not, as was claimed at the time, because of operational and safety-related concerns.”
Full article here:
![]()
Transport company handed almost £500,000 to keep buses and trams running
The finer details of the bailout are being kept out of the public eyeblackpool.thelead.uk
It’d be interesting to know where the losses are stacking up most significantly - tram or bus.For a month?
What's going to happen for the rest of the year?
They cant keep bailing them out.
http://youtu.be/qXrHuAnz-jE?si=ZqRn4F5C9uQeSjTDTram Town - The truth and what happens next
For a month?
What's going to happen for the rest of the year?
They cant keep bailing them out.
The council which has repeatedly stated that it is fully committed to Tramtown, I might add!Tramtown now stating closed until further notice. Timing seems to be rather coincidental after the council meeting last Wednesday in which it was discussed.
Reports elsewhere as an electrical fault on site which needs rectified before access is granted again. As I said previously though, timing is all a bit coincidental.The council which has repeatedly stated that it is fully committed to Tramtown, I might add!
There is definitely a need to get some serious fundraising underway here, talk of joining heritage museum associations is positive though. It’s too easy for the authorities to throw crumbs when pushed whilst ultimately sitting back and watching it wither, that can’t be allowed to happen or it’ll truly be game over, sooner or later.Tram town will reopen soon after local MP gets involved. The long term issues continue though. https://www.facebook.com/Everything...h-representatives-from-blac/1413050634193274/
This whole saga seems to have parallels with of the Douglas Horse tram closure in 2015/2016Tram town will reopen soon after local MP gets involved. The long term issues continue though. https://www.facebook.com/Everything...h-representatives-from-blac/1413050634193274/
Here is some further detailStandard has 143 left Rigby Road on a low loader, headed for the East Anglia Transport Museum.
This is good news - any ideas on whether she is passed as fit to run?Bolton 66 now moved to Starr Gate.
It was towed to Starr Gate - reportedly due to a private hire booking.This is good news - any ideas on whether she is passed as fit to run?
Presumably Rigby Road remains powered up and shunting of the cars within can take place etc?
Interesting - what was the towing vehicle? And did she then run under her own power?It was towed to Starr Gate - reportedly due to a private hire booking.
Unimog 939. It was then seen later on the same day moving under its own power within Starr Gate depot.Interesting - what was the towing vehicle? And did she then run under her own power?
non of the lines at rigby rd are powered up and haven't been for few years now, will likely need there own safety inspection if they are powered on again, even heard the points at Manchester were disabled but i have no source other then heresyThis is good news - any ideas on whether she is passed as fit to run?
Presumably Rigby Road remains powered up and shunting of the cars within can take place etc?
They're certainly powered up to the depot, and were in the fitting shop.non of the lines at rigby rd are powered up and haven't been for few years now, will likely need there own safety inspection if they are powered on again, even heard the points at Manchester were disabled but i have no source other then heresay
I've seen 0 evidence of this, all trams have been moved via the unimog in rigby road depot and up to the junction at the manchester, even when 717 and hms were when being taken onto line for storage at starr gateThey're certainly powered up to the depot, and were in the fitting shop.
754 has diesel capabilities. Could they not use that as well?I've seen 0 evidence of this, all trams have been moved via the unimog in rigby road depot and up to the junction at the manchester, even when 717 and hms were when being taken onto line for storage at starr gate