Third platform at Salford Crescent: project updates

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
SC outside 1.jpgSC outside 2.jpgSC outside 3.jpgSC outside 4.jpgSC outside 5.jpg

I took some photographs outside Salford Crescent station to give a different perspective of work being undertaken. IMHO, it seems from these photos there is a bit more work that needs doing than I originally thought from inside the station.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

sefyllian

Member
Joined
14 Jan 2013
Messages
138
I've still not used the bypass track, once it opens as Platform 0 (or 3), I'll probably try to both arrive and leave from it.

It will definitely be Platform 3 for what it's worth, as it now has signs up saying so, in the new Rail Alphabet style.

I wonder if they are going to leave the current platforms as they are, in which case they’ll be in the wrong order (2, 1, 3), or if the rest of the station will get the new signs too, with 1 and 2 swapped as they do so.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
I wonder if they are going to leave the current platforms as they are, in which case they’ll be in the wrong order (2, 1, 3), or if the rest of the station will get the new signs too, with 1 and 2 swapped as they do so.
I was wondering that myself. Hopefully, the platforms will be numbered more logically.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,268
Location
East Midlands
I was wondering that myself. Hopefully, the platforms will be numbered more logically.
I think I'll have to disagree. With platforms 1 & 2 on a separate island together and platform 3 off by itself, I don't think the "order" of P1/P2 has any real importance or significance and so spending what could be a significant amount renumbering them would be very wasteful (apparently it's surprisingly expensive not due to signage etc. but due to IT system and related changes).

I'd only agree it was worthwhile if it can be shown to be done at no or nominal cost.
 

cool110

Member
Joined
12 Dec 2014
Messages
832
Location
Preston
(apparently it's surprisingly expensive not due to signage etc. but due to IT system and related changes).
But all of those systems (mainly signalling) need to be updated anyway to add P3, so the marginal cost will be mostly signage.

It's why when platforms do get renumbered it's usually when the rest of the area is due for resignalling
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,630
Has it never occurred to "the powers-that-be" that it would have been an opportune time for the workforce on the third platform to finally put a roof on the footbridge that leads to platforms 1 and 2.
Not if its not a remitted part of the scheme, no. Way things are.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,268
Location
East Midlands
But all of those systems (mainly signalling) need to be updated anyway to add P3, so the marginal cost will be mostly signage.

It's why when platforms do get renumbered it's usually when the rest of the area is due for resignalling
I'm not convinced. Adding an extra platform can be done to any IT system, at leisure, at any time before the platform comes into use, with no need to coordinate the changes. Swapping platforms 1 and 2 needs to be done at a very specific time to all relevant IT systems simultaneously to avoid chaos. The latter type of change would typically be much more expensive due to the amount of coordination and bureaucracy involved, particularly when these IT systems are being run by a multitude of different companies. I've dealt with similar situations in my 35 year IT career and getting a coordinated simultaneous change to a number of IT systems belonging to different companies is typically a nightmare.
 

Chrisyd

Member
Joined
16 May 2015
Messages
210
A few photos from yesterday (02 February) including the platform ends and the Platform 3 sign hanging from the shelter roof.


PXL_20260202_095843236~2.jpgPXL_20260202_095907774.jpgPXL_20260202_100021689~2.jpgPXL_20260202_100024084~2.jpg
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
When's it due to open?
"Autumn 2026", in time for the Dec26 timetable change, according to NR's press release:

Salford Crescent​

We arrived on site over Christmas 2024 and the work began in March 2025. We will complete construction of the third platform in January 2026 and the lift to access the third platform in May 2026.

Once construction work is completed, the third platform and new gate line will enter into service and open to the public in Autumn 2026.

Trains will start to make scheduled stops at Salford Crescent’s third platform following the December 2026 National Rail timetable change.

(The Enhancements Delivery Plan has it as part of a wider set of projects so gives Dec-26 for Entry into service)
1770128195823.png
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,726
Location
Worcester
"Autumn 2026", in time for the Dec26 timetable change, according to NR's press release:



(The Enhancements Delivery Plan has it as part of a wider set of projects so gives Dec-26 for Entry into service)
View attachment 197305
That seems rather late considering how close to completion it looks. I'll be passing over it on the bus in less than three minutes time. I wonder if it may open ahead of schedule?
That plan, as you acknowledged, includes further projects such as turnbacks and sidings, so it may well be that the platform opens in Spring or Summer and then the full list of projects there is done by the date of Dec 26.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
That seems rather late considering how close to completion it looks. I'll be passing over it on the bus in less than three minutes time. I wonder if it may open ahead of schedule?
That plan, as you acknowledged, includes further projects such as turnbacks and sidings, so it may well be that the platform opens in Spring or Summer and then the full list of projects there is done by the date of Dec 26.
The press release is quite clear that the platform as a standalone element is scheduled to open in Autumn, so I'd be flabbergasted if NR opened the platform in Spring, although very late summer is possible.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Yes I must admit I had assumed May but looks like I am wrong.
it would be nice in these sort of project if NR could be a lot more transparent on it's project page about what it is planning to do when. It doesn't need to be the line-item project plan, just 'physical construction works will be complete by X, then we will be installing the internal wiring and electrics until y, then we will be testing and commissioning ready for the opening approval by z.'

It would help calm some of the criticisms of 'how can it take that long to finish' (or, indeed, allow those questions to be appropriately raised!) as well as general nosiness, but also accountability for how the public money is being spent and the public service is being provided.

Not least because the EDP already lists a 1-year delay to the scheme!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,630
it would be nice in these sort of project if NR could be a lot more transparent on it's project page about what it is planning to do when. It doesn't need to be the line-item project plan, just 'physical construction works will be complete by X, then we will be installing the internal wiring and electrics until y, then we will be testing and commissioning ready for the opening approval by z.'

It would help calm some of the criticisms of 'how can it take that long to finish' (or, indeed, allow those questions to be appropriately raised!) as well as general nosiness, but also accountability for how the public money is being spent and the public service is being provided.

Not least because the EDP already lists a 1-year delay to the scheme!
As you say, that also starts the comments of "has that bit been done yet, or why is it late", when it the grand scheme of things its noise and doesn't matter. Opening it on time to facilitate whatever its meant to is more important.
 

TheGoodDoctor

Member
Joined
24 Feb 2026
Messages
8
Location
Off The Rails
Hello all, this is my first post here after visiting for about a month or so! I wanted to share some recent photos of the new platform from the old footbridge. I am a student at the university so get to check on progress often!

It seems like the progress is now with the stairs and security fencing, plus rebuilding the wall behind the platform and on University Road West under the Windsor bridge. I have an older photo of the new ticket barrier/gateline next to the refurb entrance. I'd be curious if it will be "dynamic" during peak times to be entrance/exit only, as it perfectly aligns with the new platform but crosses the current flow of passengers.

I wanted to ask what this building below is for? There seems to be a path being made to the footpath next to University Road roundabout.
Photo of a grey square building on Salford Creacent's new platform. It has a long rectangular window made of 3 panes on it's East side.
 

Attachments

  • 20260124_113130.jpg
    20260124_113130.jpg
    2 MB · Views: 109
  • 20260124_113305.jpg
    20260124_113305.jpg
    1.4 MB · Views: 112
  • 20260223_124904.jpg
    20260223_124904.jpg
    1.5 MB · Views: 108
  • 20260223_124923.jpg
    20260223_124923.jpg
    1.3 MB · Views: 109
  • 20260223_125026.jpg
    20260223_125026.jpg
    1.7 MB · Views: 110

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,586
Location
Greater Manchester
I wanted to ask what this building below is for? There seems to be a path being made to the footpath next to University Road roundabout.
Photo of a grey square building on Salford Creacent's new platform. It has a long rectangular window made of 3 panes on it's East side.'s new platform. It has a long rectangular window made of 3 panes on it's East side.
Just a guess, but currently on Platform 1 and 2 there is a small building the dispatchers sit in when there's no train, may be this could be the same (but a bit bigger) on platform 3? It only has 1 simple door at the front with no windows or similar so I doubt it's a public room.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
I went by today and it honestly looked complete to me.

Platform looks structurally complete. Still cones in place and orangemen around. But substantially complete.
 

Attachments

  • SFD 1.jpg
    SFD 1.jpg
    218.6 KB · Views: 98
  • SFD 2.jpg
    SFD 2.jpg
    106.8 KB · Views: 99
  • SFD 3.jpg
    SFD 3.jpg
    121.9 KB · Views: 98
Last edited:

td97

Established Member
Joined
26 Jul 2017
Messages
1,556
In the same entry as the Salford Crescent new platform on the enhancements pipeline register, there has been some fascinating recent content about the new Salford Central sidings.

What looks like a simple area of infilled foam concrete was actually a massive achievement for the Kier Infrastructure Oldfield Road team this weekend!

We had uncovered a buried arch bridge that spanned directly beneath the proposed tracks for the new sidings lines. The arch was circa 150 years old and had already been compromised. Therefore whilst an arch is an inherently strong structure we could no longer rely on it to support the new track.

The structure was in between two existing tracks and in the vicinity of an OLE structure. This meant excavations required for surveys were very difficult to undertake safely and we could not ascertaine the details and the condition of the structure in any great detail.

We explored a vast number of options to undertake these works but most of them were not suitable as we could not safely mitigate risks such as confined spaces, working at height and operation of the existing railway infrastructure.

The final design solution comprised a Geobear Global gepolymer grout injection with foam concrete slab on top. We had very weak fill on the internal faces of the arch and we were conerenced tha the increased active pressure from the new trains would cause the walls of the arch to collapse. The Geobear Global technical team worked fantastically to assure us that their product could provide the required bearing capacity to support the new loading.

Mainly photos
 

TheGoodDoctor

Member
Joined
24 Feb 2026
Messages
8
Location
Off The Rails
Just a guess, but currently on Platform 1 and 2 there is a small building the dispatchers sit in when there's no train, may be this could be the same (but a bit bigger) on platform 3? It only has 1 simple door at the front with no windows or similar so I doubt it's a public room.
That would make sense. From old photos of SLD that staff building used to be the public waiting room.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,607
Will it be able to turn services from the Bolton or Atherton direction? It might also be useful for any peak additional shuttles - although they'd just feed existing services so maybe counter-productive. Other than the uni, Crescent is not a huge commuting destination.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,586
Location
Greater Manchester
Will it be able to turn services from the Bolton or Atherton direction?
No, although in theory you can already turn a train from Bolton in Platform 1 (the middle one) or from Atherton in Platform 2.
I've seen a TPE 397 arrive from Castlefield into Platform 2, and then turn around and go back during an issue, but no Northerns.
 

bengley

Established Member
Joined
18 May 2008
Messages
1,987
Will it be able to turn services from the Bolton or Atherton direction? It might also be useful for any peak additional shuttles - although they'd just feed existing services so maybe counter-productive. Other than the uni, Crescent is not a huge commuting destination.
The signal at the north end of the new platform is a fixed red and can't be cleared.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
Went through twice today and tbh I could not see much progress. Loads of blue and white cones and some orangemen. There must be progress but it does not seem visible.
 

sefyllian

Member
Joined
14 Jan 2013
Messages
138
One thing I noticed the other day is that the matching Rail Alphabet signs are being installed all around the station, including on platforms 1 & 2, which now have what look like new platform signs that are currently blanked out / covered over. I’m guessing that’s because the numbering of 1 & 2 will be swapped once 3 opens.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,112
Do we know if the Barrow/Windermere services will call at Salford Crescent when the new platform has been commissioned?
 