• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

What could an “ideal” Bristol service recast look like?

Manutd1999

Member
Joined
21 Feb 2021
Messages
549
Location
UK
Something still needs to serve Wellington and Cullompton when they reopen, so terminating everything at Taunton won't be an option, unless you want to annoy London passengers by making those services call there instead. You could maybe make it 2tph to Taunton, where 1tph is extended to Exeter (Bristol, WSM, Highbridge, Bridgwater, Taunton, Wellington, Cullompton*, Exeter), with the other 1tph all stations between Bristol and Taunton.
One of the 2ph to Taunton could maybe be extended to Exeter once those stations open? I'd have both services follow the same semi-fast calling pattern north of Taunton though (indicatively - Bridgewater, Highbridge, WSM, Nailsea, Bristol TM, Filton AW, Patchway, Severn Tunnel Jn, Newport, Cardiff)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Oxfordblues

Member
Joined
22 Dec 2013
Messages
1,139
I'm not sure the users of the two level-crossings at Steventon would welcome an additional four trains per hour!
 

JohnRegular

Member
Joined
12 Dec 2016
Messages
318
  • Cardiff-Portsmouth becomes a regional express, skipping Filton/Patchway/Severn Tunnel Jn.
I was under the impression there was some MoD interest in maintaining direct trains between Filton Abbey Wood and Warminster (and possibly Portsmouth?), although I have no source for that (other than 'I think I may have read that on these forums once upon a time').
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,605
Location
Taunton or Kent
I'm not sure the users of the two level-crossings at Steventon would welcome an additional four trains per hour!
Shut em, the villagers have already annoyed Network Rail with the electrification and resultant speed limit reduction debacle with preserving their precious bridge, they need to learn they can't have everything their own way.

I was under the impression there was some MoD interest in maintaining direct trains between Filton Abbey Wood and Warminster (and possibly Portsmouth?), although I have no source for that (other than 'I think I may have read that on these forums once upon a time').
The service does cover at least three prominent military areas; Portsmouth has a naval base, Warminster is the nearest station to the main Salisbury plain military training areas and Filton Abbey Wood is close to a military storage site. I suspect the latter two link up most of all though, but adding Portsmouth is a bonus.
 

William3000

Member
Joined
24 May 2011
Messages
610
Location
Cambridgeshire
This would be a very bad idea. it would introduce significant performance risk on East West Rail for very little benefit. For most journeys from west of Oxford to Cambridge and east thereof, via London is still going to be the best route, especially now that the Elizabeth Line is open.

From a Bristol perspective (and Bath and Swindon) the important thing is to have a decent 2tph service Oxford-Swindon-Bath-Bristol. That will provide good connectivity with East West Rail.
I totally disagree - I think it would be a very good idea - going via London is a real pain from Cambridge. And something to be avoided at all costs - the Elizabeth line makes some journeys via London marginally more bearable (but that involves semi-fast trains to either London Liverpool Street and Farringdon and two changes and the associated faff with time penalties, luggage, etc - a fast train from Cambridge to London King’s Cross via the Elizabeth line to London Paddington would require 3 changes or using the Circle line. But the avoiding route to the South West is an absolute game changer. Cardiff/Bristol to Norwich has been cited as possibilities. I appreciate keeping journeys simple but EWR isn’t some sort of backwater branch line, it’s a 100mph mainline. Cambridge (for its size and economic power)is a city that suffers dreadfully from poor or non existent long distance services and EWR is an opportunity to change that once and for all. And even if it was quicker - I’m not sure it would be - the pain in going into London and out is a significant penalty. Sometimes it can be quicker to get from Cambridge to Liverpool or Manchester via London but much more preferable for those with luggage to travel via Ely, or Peterborough and Leeds/York.

== Doublepost prevention - post automatically merged: ==

This I don't agree with. I see Swindon and Bristol as an obvious extension of the Cambridge - Oxford knowledge arc, and I don't see Oxford being an obvious break point in travel patterns. The way Oxford station is set up favours trains running through rather than a load of services terminating from both ends.

I don't get this mentality that Cambridge needn't bother with the great unwashed west of Oxford or Peterborough.
Totally agree - spot on with Oxford station. It’s too constrained to have multiple trains terminating there so the more through trains that can go through (taking up 2 mins rather than 20+ mins of platform space the better). Swindon is in fact in England’s Economic Heartland, a strategic partnership of local authorities trying to enhance connectivity.

Many in the business community along the Arc are advocating for precisely what you say - and linking Bristol with Cambridge has considerable logic. Not sure about extending through to Norwich and Ipswich but Cambridge itself has limited bay platform capacity so through trains there are desirable logistically.

EWR is a great opportunity to reduce passenger numbers making unnecessary journeys via London - freeing up capacity for economic growth in the London area.
 
Last edited:

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
Shut em, the villagers have already annoyed Network Rail with the electrification and resultant speed limit reduction debacle with preserving their precious bridge, they need to learn they can't have everything their own way.
Building a link road from the isolated part of the village south of the level crossing to the main B4017 road looks relatively straightforward, and could even be done as part of a housing development. The bridge definitely needs replacing regardless of what happens, and can be done offline on undeveloped land between the existing bridge and Stocks Lane level crossing.

== Doublepost prevention - post automatically merged: ==

I totally disagree - I think it would be a very good idea - going via London is a real pain from Cambridge. And something to be avoided at all costs - the Elizabeth line makes some journeys via London marginally more bearable (but that involves semi-fast trains to either London Liverpool Street and Farringdon and two changes and the associated faff with time penalties, luggage, etc - a fast train from Cambridge to London King’s Cross via the Elizabeth line to London Paddington would require 3 changes or using the Circle line. But the avoiding route to the South West is an absolute game changer. Cardiff/Bristol to Norwich has been cited as possibilities. I appreciate keeping journeys simple but EWR isn’t some sort of backwater branch line, it’s a 100mph mainline. Cambridge (for its size and economic power)is a city that suffers dreadfully from poor or non existent long distance services and EWR is an opportunity to change that once and for all. And even if it was quicker - I’m not sure it would be - the pain in going into London and out is a significant penalty. Sometimes it can be quicker to get from Cambridge to Liverpool or Manchester via London but much more preferable for those with luggage to travel via Ely, or Peterborough and Leeds/York.

== Doublepost prevention - post automatically merged: ==


Totally agree - spot on with Oxford station. It’s too constrained to have multiple trains terminating there so the more through trains that can go through (taking up 2 mins rather than 20+ mins of platform space the better). Swindon is in fact in England’s Economic Heartland, a strategic partnership of local authorities trying to enhance connectivity.

Many in the business community along the Arc are advocating for precisely what you say - and linking Bristol with Cambridge has considerable logic. Not sure about extending through to Norwich and Ipswich but Cambridge itself has limited bay platform capacity so through trains there are desirable logistically.

EWR is a great opportunity to reduce passenger numbers making unnecessary journeys via London - freeing up capacity for economic growth in the London area.
The deciding factor on providing direct trains between Bristol and Cambridge will ultimately lie on whether the benefits and revenue gain from them outweigh the cost, capacity constraint and performance risk of doing so. Even if through trains don’t exist, some people may decide to travel via Oxford anyway for a less stressful connection experience.

== Doublepost prevention - post automatically merged: ==

The service does cover at least three prominent military areas; Portsmouth has a naval base, Warminster is the nearest station to the main Salisbury plain military training areas and Filton Abbey Wood is close to a military storage site. I suspect the latter two link up most of all though, but adding Portsmouth is a bonus.
If the goal is to skip Filton in order to speed up the Cardiff - Portsmouth service, the Warminster - Abbey Wood link can be maintained by extending the Salisbury - Temple Meads stopping service to Bristol Parkway.
 
Last edited:

The exile

Established Member
Joined
31 Mar 2010
Messages
9,499
Location
Somerset
If the goal is to skip Filton in order to speed up the Cardiff - Portsmouth service, the Warminster - Abbey Wood link can be maintained by extending the Salisbury - Temple Meads stopping service to Bristol Parkway.
At the cost of blocking the East end throat every time it runs. On paper, there are very good operational reasons for not having through services between the Bath and Filton lines. Commercially there are good reasons for doing so!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,296
Location
West Wiltshire
I was under the impression there was some MoD interest in maintaining direct trains between Filton Abbey Wood and Warminster (and possibly Portsmouth?), although I have no source for that (other than 'I think I may have read that on these forums once upon a time').
The MOD has moved a large number of its office staff to Filton Abbey Wood, originally a mix of London staff and army. About 20 years ago the MOD main building in Whitehall was refurbished and lots of surrounding buildings sold off. More moved to Filton Abbey Wood.
Then 10-15 years ago, the 3 big sites around Bath (Naval and administrative, a legacy of wartime dispersal) were closed and more staff moved to Filton Abbey Wood.

Returning to main theme of thread, Bristol is becoming one of the big regional office cities, where staff formerly in (now expensive) London are being moved to. This affects commuting patterns. This week over 500 new apartments near Temple Meads were granted planning permission. The Government also approved 1700 new homes in Frome (Keyford area), over 4000 new homes are authorised in South Trowbridge. Actually Wiltshire has just mucked up its planning, it's old policy expired 31 March, and its replacement is about to be withdrawn or rejected, allowing bit of a free for all for home builders

So if anything commuter services to Warminster, Melksham, Frome need to be strengthened as these are now expected to be the commuting growth towns for Bristol due to Wiltshire planning outcome. (Can't go in certain directions, Mendips stop growth southwards, Bristol Channel stops growth to west, Cotswolds regional area stops growth north east)
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,499
Location
Somerset
So if anything commuter services to Warminster, Melksham, Frome need to be strengthened as these are now expected to be the commuting growth towns for Bristol due to Wiltshire planning outcome. (Can't go in certain directions, Mendips stop growth southwards, Bristol Channel stops growth to west, Cotswolds regional area stops growth north east)
Particularly for those heading for the North Bristol centres of employment , the Bristol Channel isn’t too much of a barrier - it just restricts which bits of SE Wales are attractive to commuters.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,443
Location
The Fens
But the avoiding route to the South West is an absolute game changer.
The East West Rail game changers are Cambridge-Oxford connectivity and commuter flows into Cambridge and Oxford, at this end from Cambourne and Tempsford. Compared to those, connectivity between Cambridge and the South West is a drop in the bucket. On a daily basis the number of people doing Cambridge-South West journeys will be tiny, to claim that it is an "absolute game changer" is an absurd exaggeration.

Don't forget that, when East West Rail was primarily about long distance connectivity, it struggled to get support. It was only when the focus switched to linking it to development of Tempsford and Cambourne that its prospects became much more secure. If there is any "absolute game changer" for East West Rail, it is Tempsford. The subsequent Universal Theme Park proposals only push long distance connectivity further down the list of priorities.

something to be avoided at all costs - the Elizabeth line makes some journeys via London marginally more bearable (but that involves semi-fast trains to either London Liverpool Street and Farringdon and two changes and the associated faff with time penalties, luggage, etc - a fast train from Cambridge to London King’s Cross via the Elizabeth line to London Paddington would require 3 changes or using the Circle line.
If it is to be avoided it at all costs, nobody would be doing it, and that's not the case. In particular the time penalty of doing Thameslink to Farringdon for the Elizabeth Line, compared with a fast train to Kings Cross, is tiny, because of the amount of walking time at Kings Cross saved. The Thameslink-Elizabeth Line route is a significant improvement for Cambridge-Paddington.

Cambridge (for its size and economic power)is a city that suffers dreadfully from poor or non existent long distance services and EWR is an opportunity to change that once and for all. And even if it was quicker - I’m not sure it would be - the pain in going into London and out is a significant penalty. Sometimes it can be quicker to get from Cambridge to Liverpool or Manchester via London but much more preferable for those with luggage to travel via Ely, or Peterborough and Leeds/York.
Cambridge isn't a particularly big city, it doesn't even make the top 30 in England by population. Lots of cities bigger than Cambridge have similar long distance connectivity. The notion that Cambridge should have direct services to places all over England is unrealistic, and whether those direct trains are there or not isn't going to make significant difference to Cambridge's economic prospects.

== Doublepost prevention - post automatically merged: ==

The MOD has moved a large number of its office staff to Filton Abbey Wood, originally a mix of London staff and army. About 20 years ago the MOD main building in Whitehall was refurbished and lots of surrounding buildings sold off. More moved to Filton Abbey Wood.
Then 10-15 years ago, the 3 big sites around Bath (Naval and administrative, a legacy of wartime dispersal) were closed and more staff moved to Filton Abbey Wood.

Returning to main theme of thread, Bristol is becoming one of the big regional office cities, where staff formerly in (now expensive) London are being moved to. This affects commuting patterns. This week over 500 new apartments near Temple Meads were granted planning permission. The Government also approved 1700 new homes in Frome (Keyford area), over 4000 new homes are authorised in South Trowbridge. Actually Wiltshire has just mucked up its planning, it's old policy expired 31 March, and its replacement is about to be withdrawn or rejected, allowing bit of a free for all for home builders

So if anything commuter services to Warminster, Melksham, Frome need to be strengthened as these are now expected to be the commuting growth towns for Bristol due to Wiltshire planning outcome. (Can't go in certain directions, Mendips stop growth southwards, Bristol Channel stops growth to west, Cotswolds regional area stops growth north east)
Thanks for this interesting local insight.

One other interesting factor, that you don't mention, is that, for Chippenham, Trowbridge, Bradford on Avon and Warminster, the biggest origin/destination station is Bath Spa.
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,296
Location
West Wiltshire
One other interesting factor, that you don't mention, is that, for Chippenham, Trowbridge, Bradford on Avon and Warminster, the biggest origin/destination station is Bath Spa.
And not the easiest to serve either, especially with no reversing sidings at Warminster or Frome (can reverse, but then blocking through track whilst waiting to do return service).

At peak times really need double units, but with mainly 3car units in Bristol area, that would require the remaining few platforms extended bit to 145m

Interestingly there used to be a bay platform at Bath facing London, the platform edge is still there, but trackless. Probably not worth reinstating it (although would be useful during disruption) as trains regularly get cancelled at Westbury when there are problems near Bristol
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,443
Location
The Fens
I'm not sure the users of the two level-crossings at Steventon would welcome an additional four trains per hour!

Shut em, the villagers have already annoyed Network Rail with the electrification and resultant speed limit reduction debacle with preserving their precious bridge, they need to learn they can't have everything their own way.
I'm interested in the views of people with local knowledge on what is actually feasible here.

Normally I'm cautious about proposals to turn 2 track railways into 4 track railways, with the current experience of trying to do it Shepreth Branch Junction-Cambridge.

Looking at a track map, a relatively short section of 2 tracks through Steventon is the missing link otherwise it would be 4 tracks Didcot-Challow. But Steventon appears to have a bridge and 2 level crossings, and the Ordnance Survey show a (possibly quite big?) embankment between Steventon and Wantage Road.

It is all very well to say "shut the level crossings" but that would need expensive alternative road routes. Harston and Hauxton in the East West Rail proposals are good examples.
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
549
Location
UK
So if anything commuter services to Warminster, Melksham, Frome need to be strengthened as these are now expected to be the commuting growth towns for Bristol due to Wiltshire planning outcome. (Can't go in certain directions, Mendips stop growth southwards, Bristol Channel stops growth to west, Cotswolds regional area stops growth north east)
My proposals increase frequency from Bradford upon Avon and Trowbridge to 3ph, plus Frome gets an hourly service. Maybe the Bristol-Oxford could run via Melksham? Not sure it would be worht the detour though.
If the goal is to skip Filton in order to speed up the Cardiff - Portsmouth service, the Warminster - Abbey Wood link can be maintained by extending the Salisbury - Temple Meads stopping service to Bristol Parkway.
I was under the impression there was some MoD interest in maintaining direct trains between Filton Abbey Wood and Warminster (and possibly Portsmouth?), although I have no source for that (other than 'I think I may have read that on these forums once upon a time').
Th Salisbury service doesn't exist in my proposal, it's replaced by 2ph MetroWest Henbury-Westbury stoppers and 2ph regional Bristol-Bath-Frome/Oxford. Filton passengers would have simple connections from MetroWest onto the regional Cardiff-Portsmouth at either Temple Meads or Bath.

There will be some losers (ie, the passengers discussed above), but I feel move away from the "hourly everywhere to everywhere" model. Running services along consistent routes at regular intervals and separating into local/regional/national services is done all over Europe, Britain doesn't need to be an exeption here. With the Filton Bank 4-tracking, the Bristol area is well setup for a suburban metro type network (MetroWest), but it won't work if we try to maintain all existing links.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,499
Location
Somerset
Filton passengers would have simple connections from MetroWest onto the regional Cardiff-Portsmouth at either Temple Meads or Bath.

There will be some losers (ie, the passengers discussed above), but I feel move away from the "hourly everywhere to everywhere" model.
Even for passengers who aren’t elderly /of reduced mobility /encumbered with luggage and/or children, interchange at Bristol TM is frequently anything but simple. OK, if it’s between two trains in the same island platform that’s fine, but try getting up the stairs to 13/15 just after a fully loaded London train has arrived. It wouldn’t go down well with the heritage authorities, but a footbridge at the Western end is badly needed.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,341
Location
Swansea
Even for passengers who aren’t elderly /of reduced mobility /encumbered with luggage and/or children, interchange at Bristol TM is frequently anything but simple. OK, if it’s between two trains in the same island platform that’s fine, but try getting up the stairs to 13/15 just after a fully loaded London train has arrived. It wouldn’t go down well with the heritage authorities, but a footbridge at the Western end is badly needed.
Agree fully.

Is there space underneath for more subways? I know the station is on arches for much of its length, but have no idea what is down there.

To me, the heritage people would have a point if talking about the station approach, maybe even the original Brunel shed, but for the operating station they should not be involved too much. If a modern footbridge can help the accessibility then it should be built (ideally in a sympathetic style, but not to the point of making it prohibitively expensive).

(Similar issues apply with Cardiff Central, and other stations where modern demands far outstrip what was initially built. Say what you like about Platforms 13/14 at Piccadilly, but their integration into the main shed works very well from a preserving the heritage appearance of the main shed perspective).
 

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
Th Salisbury service doesn't exist in my proposal, it's replaced by 2ph MetroWest Henbury-Westbury stoppers and 2ph regional Bristol-Bath-Frome/Oxford. Filton passengers would have simple connections from MetroWest onto the regional Cardiff-Portsmouth at either Temple Meads or Bath.
This would be a retrograde step for Warminster, which would go down from 2 to 1 trains per hour. Could you extend one of the MetroWest Westbury terminators to Warminster to compensate for this?
 

JohnRegular

Member
Joined
12 Dec 2016
Messages
318
Even for passengers who aren’t elderly /of reduced mobility /encumbered with luggage and/or children, interchange at Bristol TM is frequently anything but simple. OK, if it’s between two trains in the same island platform that’s fine, but try getting up the stairs to 13/15 just after a fully loaded London train has arrived. It wouldn’t go down well with the heritage authorities, but a footbridge at the Western end is badly needed.
Platform alterations at Temple Meads are a frequent occurrence also. It's by no means the worst station to change at, but as discussed above there are significant cross-Bristol flows, certainly including Filton Abbey Wood. I don't personally think it's worth having the Portsmouths skip it for the sake of a couple of minutes.
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
549
Location
UK
This would be a retrograde step for Warminster, which would go down from 2 to 1 trains per hour. Could you extend one of the MetroWest Westbury terminators to Warminster to compensate for this?
You could extend both if there's space to terminate at Warminster.
Depends how far out you want to run the MetroWest concept really .
 
Last edited:

The exile

Established Member
Joined
31 Mar 2010
Messages
9,499
Location
Somerset
You could extend both if there's space to terminate at Warminster.
Depends how far out you want to run the MetroWest concept really .
And let’s not forget the aspirations for a proper Trans-Wilts (Swindon - Salisbury - calling at a reopened Wilton North) - which we can assume go ahead along with these Bristol area improvements.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,296
Location
West Wiltshire
You could extend both if there's space to terminate at Warminster.
Depends how far out you want to run the MetroWest concept really .
Plenty of space to construct a reversing siding, just beyond the Imber Road bridge (on strip of land between running tracks and MOD sidings). There is already trailing crossover here.
And let’s not forget the aspirations for a proper Trans-Wilts (Swindon - Salisbury - calling at a reopened Wilton North) - which we can assume go ahead along with these Bristol area improvements.
Yes this is a realistic alternative, there are couple of out of use west facing platforms at Salisbury, although would need direct passenger rated signalling.

My proposals increase frequency from Bradford upon Avon and Trowbridge to 3ph, plus Frome gets an hourly service.
Frome has just had a massive westward extension granted 2nd April by Secretary of State for Housing, this suggests a new station at Blatchbridge might be better terminating location than Frome

Maybe the Bristol-Oxford could run via Melksham? Not sure it would be worht the detour though.
It would be fairly easy to reopen Bradford north curve as single reversible track. The station site at Holt (which formerly had island platform) would be suitable for a 800m passing loop. There are few housing estates with permission at eastern end of Holt, which will soon be built.

It would make more sense to have a single platform at (reopened) Holt and a local train serving this and Melksham (and Avoncliffe and Freshford) starting from a reopened platform at Chippenham. There is much lower demand from these small stations southwards than towards Bath and Bristol.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,490
Th Salisbury service doesn't exist in my proposal, it's replaced by 2ph MetroWest Henbury-Westbury stoppers

If this timetable is designed for growth why chop the service at Salisbury and Warminster from 1/2 hourly to hourly?
 

JohnRegular

Member
Joined
12 Dec 2016
Messages
318
.
Frome has just had a massive westward extension granted 2nd April by Secretary of State for Housing, this suggests a new station at Blatchbridge might be better terminating location than Frome
Whether or not a new station is a good idea, Frome is badly underserved by rail and definitely justifies hourly Bristol trains.

From probably also justifies 1tp2h semifast to London, which is outside the scope of this thread, but might mean reopening the second platform would be required.
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,296
Location
West Wiltshire
My proposals increase frequency from Bradford upon Avon and Trowbridge to 3ph, plus Frome gets an hourly service.
There are already 3 trains an hour (if rather badly spaced) eg from May timetable northbound at Trowbridge towards Bristol :
12:11 Westbury-Gloucester
12:18 Portsmouth-Cardiff
12:48 Salisbury-Bristol
13:13 Weymouth-Gloucester (not even at same minutes at previous hour)
intervals of 7min, 30min, 25min etc

Southbound from Trowbridge from May is :
12:22 Bristol-Salisbury
12:40 Gloucester-Weymouth
12:54 Cardiff-Portsmouth
13:22 Bristol-Salisbury
intervals of 18min, 14min, 28min etc.

Th Salisbury service doesn't exist in my proposal, it's replaced by 2ph MetroWest Henbury-Westbury stoppers
Unless want Henbury to have an uneven service, going to have to do something fundamental as stoppers to Westbury are currently 18min and 42min intervals, each hour.

Timetable at Trowbridge is anything but customer friendly in its current form, more something bodged together for operational convenience.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,490
Timetable at Trowbridge is anything but customer friendly in its current form, more something bodged together for operational convenience.

Every 20mins from Temple Meads (the current timetable) is hardly operational convenience!
 

William3000

Member
Joined
24 May 2011
Messages
610
Location
Cambridgeshire
The East West Rail game changers are Cambridge-Oxford connectivity and commuter flows into Cambridge and Oxford, at this end from Cambourne and Tempsford. Compared to those, connectivity between Cambridge and the South West is a drop in the bucket. On a daily basis the number of people doing Cambridge-South West journeys will be tiny, to claim that it is an "absolute game changer" is an absurd exaggeration.

Don't forget that, when East West Rail was primarily about long distance connectivity, it struggled to get support. It was only when the focus switched to linking it to development of Tempsford and Cambourne that its prospects became much more secure. If there is any "absolute game changer" for East West Rail, it is Tempsford. The subsequent Universal Theme Park proposals only push long distance connectivity further down the list of priorities.


If it is to be avoided it at all costs, nobody would be doing it, and that's not the case. In particular the time penalty of doing Thameslink to Farringdon for the Elizabeth Line, compared with a fast train to Kings Cross, is tiny, because of the amount of walking time at Kings Cross saved. The Thameslink-Elizabeth Line route is a significant improvement for Cambridge-Paddington.


Cambridge isn't a particularly big city, it doesn't even make the top 30 in England by population. Lots of cities bigger than Cambridge have similar long distance connectivity. The notion that Cambridge should have direct services to places all over England is unrealistic, and whether those direct trains are there or not isn't going to make significant difference to Cambridge's economic prospects.

== Doublepost prevention - post automatically merged: ==


Thanks for this interesting local insight.

One other interesting factor, that you don't mention, is that, for Chippenham, Trowbridge, Bradford on Avon and Warminster, the biggest origin/destination station is Bath Spa.

== Doublepost prevention - post automatically merged: ==

I disagree again. East West Rail isn’t solely about Oxford and Cambridge being linked - that’s a convenient but naive assumption based on the fact they are two university cities. It’s about so much more than that.

Tempsford is key - but that’s been promoted since 2017/18 - and we are 8 or 9 years on.

The fact Cambridge currently doesn’t make the top 30 cities in terms of size is scarcely relevant. It is one of the fastest growing cities in the UK, and the Government has set up a Growth Company to facilitate high levels of growth. Even before this, Cambridge is among the 13 or so busiest railway stations in the UK outside London. In terms of passenger numbers it exceeds York, Newcastle, Sheffield, and is similar to Bristol Tenple Meads - and that is inspite of the fact it only has two moderately long distance services to Brighton and Birmingham New Street respectively. Had we been having this discussion 20 years ago rather than planning for the next time I might have been inclined to agree with your analysis but we aren’t. And it’s critical that EWR is utilised to its full potential to ensure the economic benefits are harnessed.
 
Last edited:

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,443
Location
The Fens
I disagree again. East West Rail isn’t solely about Oxford and Cambridge being linked - that’s a convenient but naive assumption based on the fact they are two university cities. It’s about so much more than that.
It is about hard headed decisions on what does most to contribute to economic growth. For Cambridge that's local connectivity, plus links with London and Oxford. Cambridge and Oxford aren't just two universities, they are 2 of the top 10 universities in the world, and they have global recognition, unlike most other UK universities.

What's naive is thinking that East West Rail is about long distance connectivity, it isn't.

Tempsford is key - but that’s been promoted since 2017/18 - and we are 8 or 9 years on.
Tempsford only became the game changer at the 2023 route announcement.

Even before this, Cambridge is among the 13 or so busiest railway stations in the UK outside London.
Almost all of those journeys are local. Cambridge has 25 stations where the number of one way journeys were more than 50k in 2024/25, that's 100k two way journeys or 1% in comparison with the 10m total. All of those 25 stations are in the East of England (20) or London (5). The biggest outside East of England or London is Gatwick Airport at 39k, followed by Brighton at 27k and Birmingham at 19k. Oxford, at 17k, is 4th outside East of England and London, and the biggest that doesn't have direct trains.

Cambridge-Bristol is 8k and Cambridge-Bath is 5k. Even if those numbers trebled, which is unlikely, they would still be tiny, less than Brighton is now.

The numbers for long distance travel to/from Cambridge are a drop in the bucket compared to the London and local journeys. When East West Rail opens, all of Cambourne, Tempsford, Bedford and Oxford will go straight into the top end of the table of Cambridge's destination pairs, and possibly Bletchley too. But, whether there are through trains or not, it is going to take a lot of scrolling down to find Bristol and Bath.
 
Last edited:

lachlan

Member
Joined
11 Aug 2019
Messages
1,171
It is about hard headed decisions on what does most to contribute to economic growth. For Cambridge that's local connectivity, plus links with London and Oxford. Cambridge and Oxford aren't just two universities, they are 2 of the top 10 universities in the world, and they have global recognition, unlike most other UK universities.

What's naive is thinking that East West Rail is about long distance connectivity, it isn't.


Tempsford only became the game changer at the 2023 route announcement.


Almost all of those journeys are local. Cambridge has 25 stations where the number of one way journeys were more than 50k in 2024/25, that's 100k two way journeys or 1% in comparison with the 10m total. All of those 25 stations are in the East of England (19) or London (6). The biggest outside East of England or London is Gatwick Airport at 39k, followed by Brighton at 27k and Birmingham at 19k. Oxford, at 17k, is 4th outside East of England and London, and the biggest that doesn't have direct trains.

Cambridge-Bristol is 8k and Cambridge-Bath is 5k. Even if those numbers trebled, which is unlikely, they would still be tiny, less than Brighton is now.

The numbers for long distance travel to/from Cambridge are a drop in the bucket compared to the London and local journeys. When East West Rail opens, all of Cambourne, Tempsford, Bedford and Oxford will go straight into the top end of the table of Cambridge's destination pairs, and possibly Bletchley too. But, whether there are through trains or not, it is going to take a lot of scrolling down to find Bristol and Bath.
Whether intended for it or not, as I wrote previously EWR is going to become the most convenient and likely fastest route for many long distance journeys involving Bristol, Bath, Milton Keynes, Bletchley, Bedford, and Universal Studios. Not even considering Cambridge as we need to build the thing first. We can either take advantage of this, or not, but in my view the railway should be operated for passengers, not operational convenience.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,443
Location
The Fens
the railway should be operated for passengers, not operational convenience.
Operational convenience is for the benefit of the passengers because it leads to a more robust and resilient service.

Whether intended for it or not, as I wrote previously EWR is going to become the most convenient and likely fastest route for many long distance journeys involving Bristol, Bath, Milton Keynes, Bletchley, Bedford, and Universal Studios.
And that will be the case whether there are through trains or whether passengers change at Oxford.

The key point is that nearly all passengers on East West Rail will be travelling between Cambridge and Oxford, or the intermediate stations, and the trains are being operated for them. The passengers going east of Cambridge or west of Oxford are a tiny minority. The large numbers of commuters at Tempsford and Cambourne are not going to think that the trains are being operated for them if their train is cancelled because of a points failure at Swindon.
 

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
Here is a revised proposal of mine, based on subsequent replies from this thread.

Intercity
  • 2tph Bristol Temple Meads - London Paddington
  • 1tph XC Newcastle - Plymouth
  • 1tph XC Manchester - Bristol Temple Meads
Regional
  • 1tph Cardiff Central - Portsmouth Harbour
  • 2tph Swansea - Taunton via Weston-Super-Mare
  • 1tph Great Malvern - Gloucester - Bristol
  • 1tph Gloucester - Bristol - Frome, 1tp2h of which continues to Weymouth
  • 1tph Bristol - Bath - Oxford
  • 1tph Bristol - Salisbury stopping service
  • 1tph Bristol - Plymouth. Fast to Taunton then semi-fast from there to Plymouth
MetroWest
  • 2tph Portishead - Henbury via Filton Abbey Wood
  • 1tph Weston-Super-Mare - Avonmouth - Severn Beach
  • 1tph Weston-Super-Mare - Yate via Avonmouth and Henbury
 

Top