Worth bearing in mind that a block of that magnitude would have taken 2-3 years to plan and deliver if not in a scenario such as this.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

35B

Established Member
Joined
19 Dec 2011
Messages
5,484
Worth bearing in mind that a block of that magnitude would have taken 2-3 years to plan and deliver if not in a scenario such as this.
Which makes it the more impressive that the opportunity was taken so effectively.
 

Chriso

Member
Joined
7 Dec 2006
Messages
526
Good to hear there has been much work done during the closure . Good work Network Rail
 

alxndr

Established Member
Joined
3 Apr 2015
Messages
1,693
Was one already being worked on that they could rush up?
It was all done on the fly. The first couple of days in there were fairly quiet as there wasn’t the resources to do much at the drop of a hat, then got busier and busier as people got themselves organised.

Additional work has also been achieved on the Cathcart Circle and Kirkhills as well as these have been shut a little longer.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,002
Location
London
Worth bearing in mind that a block of that magnitude would have taken 2-3 years to plan and deliver if not in a scenario such as this.

Outside of the very extreme circumstances that happened here, it proves how beneficial long (5+ day) blocks are versus sporadic weekend and overnight works.
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,503
Location
Cheshire

10 months worth of work if trains were running.

More than 108 tonnes of used rail were removed from the tracks on the approaches to the station, along with 73 old timber sleepers.

Meanwhile, more than 6200 square metres of vegetation was also cleared.

Extensive maintenance was undertaken on overhead line equipment around the station, inspecting 299 sections and carrying out a range of repairs to the wires, insulators, and other kit.
I've been know <cough>, from time to time, to sometimes give the railways a hard time for not being proactive or just being so slow moving. So credit where it's due, it's good to see NR used the closure to carry out these works.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,671
Location
Nottingham
I've been know <cough>, from time to time, to sometimes give the railways a hard time for not being proactive or just being so slow moving. So credit where it's due, it's good to see NR used the closure to carry out these works.
Indeed, kudos to NR for this. Most of the work seems to have been inspecting infrastructure and fixing any minor problems found, so not something that would have needed design work or advance planning.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,427
Location
Somerset
Indeed, kudos to NR for this. Most of the work seems to have been inspecting infrastructure and fixing any minor problems found, so not something that would have needed design work or advance planning.
But thereby hopefully avoiding the need for much more expensive and disruptive work in the future. We shall of course never know….
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,697
But thereby hopefully avoiding the need for much more expensive and disruptive work in the future. We shall of course never know….
People need to manage expectations with this. Work that could be quickly organised and resourced got done, however, its not as though you could suddenly bring forward a S&C renewal job in those timescales. There will still be a requirement at some point for disruptive work.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,427
Location
Somerset
People need to manage expectations with this. Work that could be quickly organised and resourced got done, however, its not as though you could suddenly bring forward a S&C renewal job in those timescales. There will still be a requirement at some point for disruptive work.
Of course there will be- but everything they were able to do counts as a stitch in time that might save five or six, even if not the full nine. As I say, we’ll never know.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Removing discarded sleepers and lengths of rail plus devegetation is one thing. Having the opportunity to examine closely the condition of the OHLE and S&C is quite another and should deliver longer term benefits with targeted maintenance
 

alxndr

Established Member
Joined
3 Apr 2015
Messages
1,693
Removing discarded sleepers and lengths of rail plus devegetation is one thing. Having the opportunity to examine closely the condition of the OHLE and S&C is quite another and should deliver longer term benefits with targeted maintenance
Removing the scrap potentially frees up machines for other work in the future, as well as making it a safer place to work. Cutting back vegetation, especially where it’s near signals and too close to the OLE to do it without an isolation is a big help; especially now that we’re heading into spring and leaves are coming back on the trees.
 

kez19

Established Member
Joined
15 May 2020
Messages
2,205
Location
Dundee
Credit due they have done well, if I am being honest (not used Central in a while), but for going in it was easy (I noted I used the Hope Street stairs entrance (never used that before), and then on way back I came down the ramp? (I’m guessing that’s the ramp used on special occasions?)

I’ve attached a couple of mines from today in terms of Central Station
 

Attachments

  • IMG_0616.jpeg
    IMG_0616.jpeg
    2.4 MB · Views: 333
  • IMG_0615.jpeg
    IMG_0615.jpeg
    4.2 MB · Views: 341
  • IMG_0614.jpeg
    IMG_0614.jpeg
    2.4 MB · Views: 342
  • IMG_0613.jpeg
    IMG_0613.jpeg
    4.8 MB · Views: 337

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,277
Credit due they have done well, if I am being honest (not used Central in a while), but for going in it was easy (I noted I used the Hope Street stairs entrance (never used that before), and then on way back I came down the ramp? (I’m guessing that’s the ramp used on special occasions?)

I’ve attached a couple of mines from today in terms of Central Station
Thanks for the updated pictures. I’m guessing they don’t really know exactly what they’ll find when they investigate the interface with neighbouring property’s walls, I bet there’ll be all sorts of surprises. Would they have just build against whoever came first? Looks like there’s a few blanked off windows and similar.
 

bcarmicle

Member
Joined
11 May 2018
Messages
408
I'm surprised that Network Rail could pull together teams for track work that quickly; wouldn't the other work they'd have been assigned to be difficult to reschedule if possessions had been booked?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,427
Location
Somerset
Credit due they have done well, if I am being honest (not used Central in a while), but for going in it was easy (I noted I used the Hope Street stairs entrance (never used that before), and then on way back I came down the ramp? (I’m guessing that’s the ramp used on special occasions?)

I’ve attached a couple of mines from today in terms of Central Station
A sadly appropriate name for the demolition contractors!
 

kez19

Established Member
Joined
15 May 2020
Messages
2,205
Location
Dundee
Thanks for the updated pictures. I’m guessing they don’t really know exactly what they’ll find when they investigate the interface with neighbouring property’s walls, I bet there’ll be all sorts of surprises. Would they have just build against whoever came first? Looks like there’s a few blanked off windows and similar.
Being honest I only took them on the off chance
 

alxndr

Established Member
Joined
3 Apr 2015
Messages
1,693
I'm surprised that Network Rail could pull together teams for track work that quickly; wouldn't the other work they'd have been assigned to be difficult to reschedule if possessions had been booked?
A lot of the work was done using staff that were available during dayshifts. Work done during dayshifts is usually non-distruptive and can be easily rescheduled.
 

kez19

Established Member
Joined
15 May 2020
Messages
2,205
Location
Dundee
A sadly appropriate name for the demolition contractors!

Indeed what I will add this included myself, people coming from Hope Street to turn right towards Union Street (it’s blocked off), I thought you could walk alongside the demolition (I’m familiar with the street layout as a non local), but it did throw people off, had to go through a side street to get back onto Union Street as far as the closure is (just to make people aware for time being)

There is also a no drone flying/allowed sign beyond that point too (Union Street), was surprised to see that one!
 

styles

Established Member
Joined
7 Dec 2014
Messages
4,895
Location
Gwynedd
There is also a no drone flying/allowed sign beyond that point too (Union Street), was surprised to see that one!
There is no legally enforceable flight restriction zone over the station or its surroundings.

Whatever dodgy signs landowners have put up saying otherwise are unenforceable. Obviously they're likely to cause confrontation, and drone pilots also need to avoid conflict with other air raft, before anyone jumps in with that).
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,507
Location
Lichfield
There is no legally enforceable flight restriction zone over the station or its surroundings.

Whatever dodgy signs landowners have put up saying otherwise are unenforceable. Obviously they're likely to cause confrontation, and drone pilots also need to avoid conflict with other air raft, before anyone jumps in with that).

Enforcing it would require locating the drone operator first!
 

kez19

Established Member
Joined
15 May 2020
Messages
2,205
Location
Dundee
There is no legally enforceable flight restriction zone over the station or its surroundings.

Whatever dodgy signs landowners have put up saying otherwise are unenforceable. Obviously they're likely to cause confrontation, and drone pilots also need to avoid conflict with other air raft, before anyone jumps in with that).

I’m unsure who put the sign in place of no drone flying (sign was similar to “road ahead closed”)
 

d70g

Member
Joined
12 Nov 2020
Messages
69
Location
Paisley
There is no legally enforceable flight restriction zone over the station or its surroundings.

Whatever dodgy signs landowners have put up saying otherwise are unenforceable. Obviously they're likely to cause confrontation, and drone pilots also need to avoid conflict with other air raft, before anyone jumps in with that).

Signs are probably left over from the firefighting / dampdown.

Per Glasgow Times, 12 March: Airspace restrictions above the site of a fire-ravaged building in Glasgow city centre have now been lifted.

Police confirmed that the temporary restrictions on drones being flown over the site on Union Street are no longer in place.
Earlier this week, the force issued a warning to drone pilots and operators planning to fly near Glasgow Central Station and the partially collapsed building, stressing that unmanned aircraft must stay out of the area.
At the time, pilots were warned that it was an offence to fly over an ongoing emergency response.
 

158715

Member
Joined
10 Sep 2022
Messages
40
Location
Scotland
Credit due they have done well, if I am being honest (not used Central in a while), but for going in it was easy (I noted I used the Hope Street stairs entrance (never used that before), and then on way back I came down the ramp? (I’m guessing that’s the ramp used on special occasions?)

I’ve attached a couple of mines from today in terms of Central Station
Yes, they said that ramp is used for special events although I've never actually noticed that happening. It's a good way of getting people in and out and it's interesting to see it.
 

kez19

Established Member
Joined
15 May 2020
Messages
2,205
Location
Dundee
Yes, they said that ramp is used for special events although I've never actually noticed that happening. It's a good way of getting people in and out and it's interesting to see it.

Yeah I was surprised if I’m honest anytime I’ve used Central it’s always been the front or few months back was Union Street itself.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,823
I'm surprised that Network Rail could pull together teams for track work that quickly; wouldn't the other work they'd have been assigned to be difficult to reschedule if possessions had been booked?

in a block of this nature the collegues involved will be much more productive, and you will get s lot of work done each shift. Especially with works in daylight where it’s easier to see what you‘re doing.
 

CEN60

Member
Joined
17 Dec 2018
Messages
299
Yes, they said that ramp is used for special events although I've never actually noticed that happening. It's a good way of getting people in and out and it's interesting to see it.
Used for segregating Rangers & Celtic fans when matches are played at Hampden. In recent years Rangers fans have been queued in the Carriage Drive and walked to Mount Florida Specials.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,671
Location
Nottingham
There is no legally enforceable flight restriction zone over the station or its surroundings.

Whatever dodgy signs landowners have put up saying otherwise are unenforceable. Obviously they're likely to cause confrontation, and drone pilots also need to avoid conflict with other air raft, before anyone jumps in with that).
As far as I'm aware unlicensed drone operators wouldn't be able to fly here at any time, due to the rules on separation from other people. Those with a license allowing them to fly legally in this area would hopefully be more aware of the risks, and perhaps wary of losing their licence although that may not be possible if there's no legal enforcement.
 
Status
Not open for further replies.

Top