It’s going to chaos for 6-12 months but it’ll be worth it
NR will deliver the rail infrastructure to enable a 1tph service.
Authorised for putting into Service, Original Agreed Date: December 2028, Status: On Target.

Is that a 12 month slippage? Previous statements were late 2027 / early 2028.March Enhancements Delivery Plan from Network Rail now published: https://www.networkrail.co.uk/wp-co...nhancements-Delivery-Plan-Mar-2026-Update.pdf
Key elements are:
View attachment 201020
Network Rail: The Portishead LineWe are a community organisation in Portishead, North Somerset. We need your support to help us re-instate the railway link between Portishead and Bristol.
We’re restoring the Portishead Line from Bristol to Portishead.
Were the previous statements ever anything more than hopeful estimates? Arguably it's already slipped several times anyway.Is that a 12 month slippage? Previous statements were late 2027 / early 2028.
The Portishead branch line shut in 1964 but is now part of a project which aims to reopen the line to passenger services by 2021.
Indeed, maybe Dec 2028 has been chosen as a worst case scenario type. Hopefully with lessons learned from Project Speed on the Okehampton line, it will be earlier than that, especially if machines such as Balfour’s NTC is used to lay the Pill > Portishead section.Were the previous statements ever anything more than hopeful estimates? Arguably it's already slipped several times anyway.
In 2019 it was hoped trains would be running by 2021(!) - https://www.bbc.co.uk/news/uk-england-bristol-47853916
So it's always a bit of a 'how do you feel' question about stated opening dates. As this is the first appearance of the scheme in an actual document measuring delivery, I'm minded to take the Dec-28 date as the 'original' opening date for this scheme.
It's possible that services will start earlier than Dec-28 but there will be some final snagging that means final project closeout does not take place until then.
True, but 37 year old diesels, which by then will be few years since last refurb, is not exactly the image of glitzy everything new.By 2028 there’s a vague chance there might actually be some stock available to run the service!
So - do we wait for an as yet indeterminate time for new trains to be ordered, then another as yet indeterminate period while people scratch their heads while trying to get them to actually work or do we get on with doing what is practical (and within the constrained budget) now?True, but 37 year old diesels, which by then will be few years since last refurb, is not exactly the image of glitzy everything new.
OK, it's a step up from current no service, although the suggestion that peak hour trains will be just 3cars once an hour is not going to impress someone moving to Portishead from London
Also an official Facebook page run by NR it seems: https://www.facebook.com/portisheadlineA couple of resources for updates on the line’s progress:
Facebook: Portishead Railway Group
Network Rail: The Portishead Line
Link to North Somerset Times article: https://www.northsomersettimes.co.u...stage-portishead-line-works-cause-disruption/ (my bold)Local paper reporting that work on removing the old track and preparing the trackbed from Portishead to Pill will begin on 4 May.
The next stage of construction for the rebuilding of the Portishead to Bristol railway line is set to begin soon.
The work will see the old railway along the disused line removed and the area prepared for new track to be installed.
It is set to take place from Tuesday, May 5 until August this year, with Network Rail working from Monday to Friday between 7.30am and 5.30pm.
...
The work will see old sections of track and tree stumps removed to create space for the new railway line.
Network Rail will also put up fencing, remove old track equipment, and reprofile culverts and ditches.
...
The line is expected to reopen in 2028, after main construction on its restoration started earlier this year.
Just cycled from Portishead to Pill the majority of the track has been removed on the Portishead side of the M5 although most is still in place on the Pill side. Work going on one of the bridges into Portbury Dock
I hope it doesn't have a similar encounter with the Portbury gates to what happened to the 153 when they did the jolly to launch the concept that became Metro West. Rather depressingly - that was 14 years ago!A preserved Pacer is going to Portbury tomorrow from Temple Meads on a WECA / Metrowest jaunt. 0900 ex BTM and back there by 1015. Then a jolly out to Henbury and WSM.

Link to North Somerset Times article: https://www.northsomersettimes.co.u...stage-portishead-line-works-cause-disruption/ (my bold)
The work will see the old railway along the disused line removed and the area prepared for new track to be installed.
It is set to take place from Tuesday, May 5 until August this year, with Network Rail working from Monday to Friday between 7.30am and 5.30pm.
...
The work will see old sections of track and tree stumps removed to create space for the new railway line.
Railway volunteers give extra help to Wye Valley Greenway
By Sarah Wood | 7th December 2020
Volunteer members of the Dean Forest Railway Society have completed their clearance of track and overgrown vegetation from part of the railway which used to link Chepstow and Monmouth along the Wye Valley, ready for a new tourist attraction for the Forest.
The work will help to create the new Wye Valley Greenway which is set to open next year, providing cyclists and walkers with a path without traffic along the bank of the Wye.
![]()
Alastair Clarke, DFRS chair of trustees, said: "It took us about 25 site visits for our volunteers to clear the south end of the route, between the junction with the main line northwards as far as the 1090m-long Tidenham tunnel.
Apart from vegetation, we unclipped the continuously welded rail from the sleepers and cut it into 18m-odd lengths for lorry transport to Lydney along with the lifted concrete sleepers.
1 buyer
- North Somerset Council Weston Super Mare
1 supplier
- Amalgamated Construction Leeds
Description
North Somerset Council procured a contractor to deliver the design and construction works to upgrade highways and bridges as part of the MetroWest Phase 1B project. The overall objective of MetroWest Phase 1B is to re-open the Portishead rail line and provide an hourly service between Portishead and Bristol Temple Meads, with new stations at Portishead and Pill. The Project will connect 50,000 residents to the rail network and forms part of a wider MetroWest programme to deliver strategic enhancements to the local rail network. The highway and bridge works comprise of two works packages. Package 1 is the highways scope which includes detailed design (stage 1) and construction (stage 2). Package 2 is the bridges scope which includes stage 2 construction only (covered by 3 separate contracts). This notice relates to the award of the Stage 2 Package 2 Bridges construction contract 2 of 3 (Sheepway Bridge and Old Station Road Bridge)
More history gone to waste.From the Portishead Line FB Page - Pill Station old topside buildings demo underway
![]()
More history gone to waste.
Not to waste.More history gone to waste.