I’m I right to say I be best going in via Hope Street than say Argyll Street?

There is an entrance on Hope Street at the junction with Argyle Street and the low level ticket office is directly inside there.

There is an escalator and lift right next to the ticket office, which will take you to the high level platforms which are currently operational.

There are also escalators and a lift to the low level platforms from the same area.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
3 Mar 2020
Messages
673
Location
Furness
I arrived and departed from Central on Friday early afternoon and the flow of passengers through the station seemed to be operating smoothly with no pinch points or congestion anywhere. I noticed on my return journey the platform for my train was on the departure board approximately 18 minutes before its departure so there was no need to wait in the limited concourse area.

I noticed on TRAKSY that there are 3x EMUs stabled on platform 9 and have been since the station partially re-opened and I noticed their presence on Friday - anyone know the reason platform 9 does not appear to be in use.
I was there on Friday afternoon and noticed this. I thought it might have been a mechanism for allowing for segregation of passengers waiting to travel with Avanti to London from those getting off the Avanti train. I couldn't think of any other reason.
 

kez19

Established Member
Joined
15 May 2020
Messages
2,205
Location
Dundee
There is an entrance on Hope Street at the junction with Argyle Street and the low level ticket office is directly inside there.

There is an escalator and lift right next to the ticket office, which will take you to the high level platforms which are currently operational.

There are also escalators and a lift to the low level platforms from the same area.
Thank you, I’ve been so familiar with going in by the front so this will be a new experience
 

Retorus

Member
Joined
30 Mar 2012
Messages
340
There’s an iron fence circa 60’s to prevent this. Unless you plan to squeeze through the coffee stall. P1&2 has no gateline and there’s no way to get to P3/4 without going through the concourse.
It's a gate, not a fence, and is used regularly.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,283
Latest update from Glasgow City Council, there’s a couple of photos of what’s left:
The facade on Gordon Street has now been demolished by contractors who will now focus on the external back wall of the collapsed building and joining the gable end of the Voco Grand Central Hotel.
Our building control colleagues are liaising with the hotel's structural engineers about access and timelines to restrain the wall and make it safe.
Work has begun in earnest to remove the rubble from the site.
Central Station has announced that from today, Sunday 22 March, the Hope Street exit restored at Glasgow Central to improve passenger flow
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,765
Location
SW London
I noticed on TRAKSY that there are 3x EMUs stabled on platform 9 and have been since the station partially re-opened and I noticed their presence on Friday - anyone know the reason platform 9 does not appear to be in use.
Could the units be being used as a screen? I've seen this done before, for example during the rebuilding work at Waterloo a few years ago, or to provide some privacy for a special train (eg the Royal Train)
 

Chrism20

Established Member
Joined
27 Feb 2013
Messages
1,400
I arrived and departed from Central on Friday early afternoon and the flow of passengers through the station seemed to be operating smoothly with no pinch points or congestion anywhere. I noticed on my return journey the platform for my train was on the departure board approximately 18 minutes before its departure so there was no need to wait in the limited concourse area.

I noticed on TRAKSY that there are 3x EMUs stabled on platform 9 and have been since the station partially re-opened and I noticed their presence on Friday - anyone know the reason platform 9 does not appear to be in use.
Are they possibly being used as mess rooms? Lots of space will no doubt be out of use at the moment.
 

Bill57p9

Member
Joined
1 Dec 2019
Messages
887
Location
Ayrshire
I noticed on TRAKSY that there are 3x EMUs stabled on platform 9 and have been since the station partially re-opened and I noticed their presence on Friday - anyone know the reason platform 9 does not appear to be in use.
One day they were showing as "WAIT" "ROOM" so I had assumed they are a temporary waiting room (or possibly mess as @Chrism20 suggests) complete with toilets.

I haven't been through Glasgow Central recently so cannot confirm
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,263
Are there any toilets for public use at Glasgow Central station just now? Or are they still closed / inaccessible for the time being?
 

380101

Member
Joined
18 Feb 2015
Messages
1,141
Are there any toilets for public use at Glasgow Central station just now? Or are they still closed / inaccessible for the time being?

Currently only the disabled access toilets next to Costa are available. Normal toilets will be available again on Wednesday.
 

ld0595

Member
Joined
1 Aug 2014
Messages
672
Location
Glasgow
Brilliant news, will make it much easier to get into work for me, although a silver lining out of this is that I've discovered how good the Voi bike share scheme is!
 

Spsf3232

Member
Joined
21 Apr 2016
Messages
416
Location
Glasgow
Just watched another video posted by Ross Moran, he's been a credit to Network Rail throughout this incident
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
457
Can we have a link please?
The video is linked from this Network Rail news item: https://www.networkrailmediacentre....open-at-glasgow-central-on-wednesday-25-march
All platforms to reopen at Glasgow Central on Wednesday 25 March

Network Rail will reopen platforms 1-6 at Glasgow Central on Wednesday 25 March, restoring all train routes through the high-level station following the Union Street fire.

An exclusion zone had been in place across much of the high-level concourse while Glasgow City Council carried out the demolition of the fire-damaged neighbouring building, restricting access to platforms and station entrances........

There is a video with Ross Moran, route director at Network Rail Scotland explaining the changes at the station.
 
Last edited:

deerokus

Member
Joined
30 Sep 2024
Messages
45
Location
Glasgow
Good to see they used to opportunity to clear plenty of vegetation. Parts were looking very overgrown.
 

Pete_uk

On Moderation
Joined
28 Jan 2017
Messages
1,548
Location
Stroud, Glos
Having worked in a building (coffee shop) adjacent to some demolition going on, one thing they may be concerned about is any vibration knocking anything out of place, such as glass panels etc

I think we lost about 5 cups, BTW
 

Pacef8

Member
Joined
21 Mar 2020
Messages
479
Location
Wirral
Radio Scotland said a compensation scheme has started for businesses that have been affected (coffee shops as well )
 

chiltern trev

Member
Joined
28 Mar 2011
Messages
517
Location
near Carlisle

10 months worth of work if trains were running.

More than 108 tonnes of used rail were removed from the tracks on the approaches to the station, along with 73 old timber sleepers.

Meanwhile, more than 6200 square metres of vegetation was also cleared.

Extensive maintenance was undertaken on overhead line equipment around the station, inspecting 299 sections and carrying out a range of repairs to the wires, insulators, and other kit.
 
Last edited:

Dave W

Member
Joined
27 Sep 2019
Messages
886
Location
North London
Feels like the railway has come out of this with a good deal of credit here. Inventive and creative solutions to problems (the EMU waiting rooms, if indeed the case, are a very smart idea!) plus all the extra work happening. Good effort all round.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,510
Location
Preston Lancs
Also on Network Rail Website


Network Rail engineers seized the rare opportunity of the closure of Scotland’s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete.
With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a broad range of essential works before the station partially reopened on March 18.
The work would’ve normally required multiple weekend and weekday nightshifts to complete around passenger services at Central, where over 1,200 trains move in and out each day.
On the tracks more than 108 tonnes of used rail were removed from the station approaches along with 73 old timber sleepers. More than 6,200 sqm of vegetation was also cleared.
Engineers carried out extensive maintenance on Overhead Line Equipment (OLE) around the station, inspecting 299 sections and carrying out a range of repairs to the wires, insulators and other kit.
Work was carried out on switches and crossings (pieces of track that move trains from one line to another) and inspections made on 439 insulated block joints (part of the signalling system that pinpoints where trains are on the tracks).
Keiren Sharkey, infrastructure maintenance delivery manager at Network Rail, said: “It was a situation none of us expected, but our teams reacted immediately and were determined to make the most of this rare opportunity.

"It allowed teams based in Motherwell and Glasgow to complete an enormous amount of work that would have required a much longer period of time to complete under normal conditions.”
 

nlogax

Established Member
Joined
29 May 2011
Messages
6,035
Location
Mostly Glasgow-ish. Mostly.
I'm keen to see the results of all the clear-up! The approaches to Central have looked really tatty in recent years so it makes sense that NR have taken this opportunity.
 
Status
Not open for further replies.

Top