Haymarket to Dalmeny electrification

DesDobramento

Member
Joined
12 Jun 2025
Messages
77
Location
Portugal/UK
Curious. The Scotrail app and RTT both suggest that those services are running as booked but having checked the WON myself you are indeed correct. Will see what happens on Monday.
Realtime Trains suggests that the relevant passenger Dundee<>Glasgow services via the Forth Bridge operated as booked on Monday 19 January 2026, along with a number of engineering trains during the later part of the evening.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HamBuoy

Member
Joined
8 Sep 2017
Messages
48
Its not an arched bridge but im surmising the wire height through the station platforms has to be at a minimum which may be the issue.
If that does turn out to be the issue then there is perhaps the possibility of extending the platforms west and decommissioning the eastern end of the platforms closest to the bridge.
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
Some Pictures from today around Lennymuir and Turnhouse. I had assumed that the works being carried out during the weeks possession was for installing the wires. Turns out to be Only Track Lowering and Drainage Works Under the 2 Road Bridges. Pictures don't really show it but looks to be a reasonable amount
 

Attachments

  • 1  Lennymuir Edinburgh Stenhouse OB.jpg
    1 Lennymuir Edinburgh Stenhouse OB.jpg
    1.1 MB · Views: 249
  • 2 Track Lowering At Lennymuir.jpg
    2 Track Lowering At Lennymuir.jpg
    1.1 MB · Views: 246
  • 3 Lennymuir to Turnhouse Road OB.jpg
    3 Lennymuir to Turnhouse Road OB.jpg
    1.4 MB · Views: 237
  • 4 Mast Equipment Detail.jpg
    4 Mast Equipment Detail.jpg
    1.5 MB · Views: 245

AMD

Member
Joined
6 Dec 2017
Messages
773
Some photos from today -
1 - New deck installed for the lane by the Ineos site up by Dalmeny
2 & 3 - Track lowering at Lennymuir & Turnhouse Road bridges
4 - The farm access bridge just north of Gateway station is gone, along with the west parapet
5 - The old bridge has been removed at South Gyle exposing the new footbridge
6 - New deck installed on Ladywell Avenue.
 

Attachments

  • 1 Lane by Ineos.jpg
    1 Lane by Ineos.jpg
    3.9 MB · Views: 242
  • 2 Lennymuir.jpg
    2 Lennymuir.jpg
    3.8 MB · Views: 226
  • 3 Turnhouse Road.jpg
    3 Turnhouse Road.jpg
    4 MB · Views: 221
  • 4 OB gone north of Gateway.jpg
    4 OB gone north of Gateway.jpg
    3 MB · Views: 234
  • 5 South Gyle Road.jpg
    5 South Gyle Road.jpg
    4.4 MB · Views: 238
  • 6 Ladywell Avenue.jpg
    6 Ladywell Avenue.jpg
    4.2 MB · Views: 244

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
Some photos from today -
1 - New deck installed for the lane by the Ineos site up by Dalmeny
2 & 3 - Track lowering at Lennymuir & Turnhouse Road bridges
4 - The farm access bridge just north of Gateway station is gone, along with the west parapet
5 - The old bridge has been removed at South Gyle exposing the new footbridge
6 - New deck installed on Ladywell Avenue.
Not sure if anyone knows, but is the green bridge at South Gyle temporary or is it the permanent bridge?
 

Avenger20

Member
Joined
8 Aug 2011
Messages
284
I don't know for a fact, but it looks quite substantial and well-built for a temporary structure.
It's considerably narrower than the bridge it has replaced. I know it only offers access to the station car park, but still seems short sighted.
 

AMD

Member
Joined
6 Dec 2017
Messages
773
Was the footbridge at Dalmeny repaired/replaced during this recent work?
Nope, Dalmeny is currently north of the works taking place south of the bridge.
Not sure if anyone knows, but is the green bridge at South Gyle temporary or is it the permanent bridge?
Permanent. Just a footbridge now, I haven't had a look at the station car park, but I presume that this is getting altered as half of it was only accessible over the bridge.
 

och aye

Member
Joined
21 Jan 2012
Messages
1,014
You can see some of the electrification works by the runway at Edinburgh Airport in YouTuber Steve Marsh's video that he took in December. If the link below doesn't go directly to the right timestamp. It's at 20m57s.

 
Last edited:

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
I contacted network rail asking about when the wires will be installed between Saughton and Dalmeny, and got a very helpful and informative response! I also received this attached to a letter which was sent to the locals of the line. IMG_1014.jpeg
 

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
Here's a full video of what's new:


== Doublepost prevention - post automatically merged: ==

As mentioned by one of my friends, wiring has commenced around the Lennymuir area as well.
It seems both sides of masts have registration arms, but one side is beginning to have wires.IMG_1256.png
 
Last edited:
Joined
5 Aug 2015
Messages
913
Location
Norfolk
In that picture, looks like they've started with contact rather than catenary wire which is odd. But I suspect this might be a contenary area which could explain that
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,861
Location
Beeston (Notts)
Co located arrangement of both CONtact and caTENARY wires at the same height at low clearance locations
Or as near as damnit. While most low clearance areas have a "system height" (difference in height between catenary & contact) of 0mm, some contenary arrangements have 30mm system heights the last time I checked.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,861
Location
Beeston (Notts)
Thanks to @AMD for the video, what type of OLE is this? Seen at the bridge near Edinburgh airport over the river almond:
View attachment 200733
It's also UKMS, like the Series 2 cantilevers. Unlike the Series 2 cantilevers (part of Bonomi's Omnia range), these are from Furrer + Frey's UKMS-R1 range, originally designed for Mark 1/GE reconstructions on the routes out of Liverpool St & Fenchurch St. These, and the goose-necked Single Insulator Cantilevers, are now visible as far east as Beaulieu Park on the GEML and Pitsea on the LTS corridor*.
All the cantilevers within the UKMS overarching design range can be used interchangeably.
As to why these cantilevers are being used instead of the others, I would imagine it's due to needing a larger encumbrance/system height (the gap between the catenary & contact wires) to allow for longer spans between masts/portals etc.

For UKMS100 (11kN catenary & 11kN contact, which I imagine would be being used here), the maximum normal span length is 72m. For normal span lengths, the system height is 1.3m. After that point, system heights increase in 0.1m intervals for every 3-4m of span length added, until a 95m span is reached, where the system height reaches an impressive 2.0m. UKMS125 pushes things even further, but that's for another thread.

(*newer registrations are only on the Tilbury Loop (i.e. Barking-Grays-Tilbury-Pitsea) and are not entirely continuous)
 