The latest RAIL edition includes a double-page spread about studies into upgrading this line to double the service, which includes the following:
-ETCS (dependent on new fleet)
-Another passing loop north of Eggesford
-Changing level crossing at Eggesford to signaller control
-Double track Credtion-Newton St Cyres
Andrew Robinson of NR also says there are no "showstopper" requirements, and that "the the money was there tomorrow, we could crack on with designing and building and have something in place within three or four years."
There was no clear mention of reopening a second platform at Barnstaple, or integrating the lines through Yeoford into a dynamic loop, which I'd have thought would be the low-hanging fruit, but maybe they are being considered just not mentioned yet.
-ETCS (dependent on new fleet)
-Another passing loop north of Eggesford
-Changing level crossing at Eggesford to signaller control
-Double track Credtion-Newton St Cyres
Andrew Robinson of NR also says there are no "showstopper" requirements, and that "the the money was there tomorrow, we could crack on with designing and building and have something in place within three or four years."
There was no clear mention of reopening a second platform at Barnstaple, or integrating the lines through Yeoford into a dynamic loop, which I'd have thought would be the low-hanging fruit, but maybe they are being considered just not mentioned yet.