Nobody seems to know what is going on this this contract. Rumours were that GBRf were taking over. Then GBRf were pulling out and the traffic is going via road. Not surprising with what little traffic there is left. I've heard that Cliff Vale don't require as much clay any more and the train was to go down to once every two weeks. Also strangely the Cliff Vale job is down to run this week after i was informed the last train ran 2/3 weeks ago.
My understanding is that GBRF won the Imerys contract, but lost the Cliffe Vale traffic to road haulage.
The Cliffe Vale train should run again this week, and if it runs next week that could be the final train, depending on the date the contract swaps over (1st April?)
One concern with losing the Cliffe Vale flow is that all the traffic to Fowey is currently loaded at Goonbarrow, leaving a question mark over the Parkandillack and Par Harbour branches. Cliffe Vale traffic is normally loaded at Treviscoe and Par Harbour, with a trip to Par Harbour on Wednesdays and Treviscoe on Thursdays (or sometimes vice versa).
Trains used to run regularly from Treviscoe to Fowey (and also from nearby Parkandillack until that ceased being used as a loading point in 2020) but these workings have been very rare since the CDAs were taken out of traffic in August 2023.
Will it continue to be operated by 66's?
I would think so, for reasons already mentioned but also because of some steep gradients which I don't think would suit the 69s. From Par to Lostwithiel involves a climb up to Treverrin tunnel, part of which is at 1 in 62 and can pose a challenge in autumn.
======================================
Update 19th March: The Cliffe Vale working (today's 6M53 and associated trips) ended up being cancelled this week...