Transpennine Route Upgrade and Electrification updates

Blockman

Member
Joined
19 Dec 2007
Messages
42
Was the loop from platform 3 15mph before? That will feel massively different! A class 331 there will feel very different to any sprinters before.
It was 15 mph from the points at the end of the P3 to the points in the Up Leeds. The loop up to there was (and is) 40 mph in the Up direction.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

KN94

Member
Joined
12 Mar 2025
Messages
71
Location
Stalybridge
Just passed though Dewsbury this evening and noticed the ticket barriers have been removed.

I wonder if this TRU related or to do with the station front redevelopment?
Neither - gates were rarely in operation, especially on platform 1 (Leeds-bound). Gateline staff have been re-deployed to Huddersfield.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,284
Location
Bolton
Neither - gates were rarely in operation, especially on platform 1 (Leeds-bound). Gateline staff have been re-deployed to Huddersfield.
Installing those gates at the end of 2017 did seem like very dubious value. I heard the hardware was being recovered so some of it could be re-used elsewhere, although I don't know where. It probably makes sense given how rarely they were actually in use.
 

Railsecrets

Member
Joined
9 May 2024
Messages
20
Location
Leeds
Neither - gates were rarely in operation, especially on platform 1 (Leeds-bound). Gateline staff have been re-deployed to Huddersfield.
Quite surprised about that. Until last year I passed through there regularly and it was the case that P2 (Huddersfield bound) was gated in the morning and afternoon peaks, but often found most of the time P1 (Leeds bound) was rarely gated, but when it was very inconsistent.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
6,074
Summary of latest line speed improvements:

Micklefield junction
Increase from 80 to 90mph on route to and from Church Fenton.

Church Fenton
Northbound, increase from 80 to 90mph around curve south of the station.

Southbound, 125mph extended from River Wharfe viaduct to Church Fenton North junction, then 85mph through station and around curve - up from 70mph through the curve.

Loop from platform 3, 50mph round curve and joining mainline towards Leeds.

Speeds from latest Sectional Appendix.

Would I have gone through Church Fenton at 90 last Tuesday? And sped up to 125 until the Wharfe Bridge? Or do these new speeds not yet take effect?
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,861
Location
west yorkshire
Summary of latest line speed improvements:

Micklefield junction
Increase from 80 to 90mph on route to and from Church Fenton.

Church Fenton
Northbound, increase from 80 to 90mph around curve south of the station.

Southbound, 125mph extended from River Wharfe viaduct to Church Fenton North junction, then 85mph through station and around curve - up from 70mph through the curve.

Loop from platform 3, 50mph round curve and joining mainline towards Leeds.

Speeds from latest Sectional Appendix.
Strange that the northbound curve is 90mph but the outer lager radius southbound curve is 85.
K
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,082
Location
West Yorkshire/Tuscany
Strange that the northbound curve is 90mph but the outer lager radius southbound curve is 85.
K
There was a similar differential previously....80 on the Down (Northbound) and 70 on the Up (Southbound). Possibly something to do with a reduced cant to accommodate the trailing points from the platform loop?
 

Monkeyhead

Member
Joined
21 Sep 2016
Messages
90
The cast iron bridge between Cross Gates and Garforth seems to have been reinstalled over the past days or so
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,861
Location
west yorkshire
There was a similar differential previously....80 on the Down (Northbound) and 70 on the Up (Southbound). Possibly something to do with a reduced cant to accommodate the trailing points from the platform loop?
Perhaps they haven't made the recent loop extension long enough.
K
 

Phillipimo

Member
Joined
5 Jan 2013
Messages
237
Location
Portsmouth
There was a similar differential previously....80 on the Down (Northbound) and 70 on the Up (Southbound). Possibly something to do with a reduced cant to accommodate the trailing points from the platform loop?
The loop now extends around the curve and joins up on the straight, so this won't be the reason.
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,957
Location
York
The loop now extends around the curve and joins up on the straight, so this won't be the reason.
I wanted to ask about this too. The northbound line through the platform has the 90, the southbound non-platform line only 85, which is the reverse of what one might expect if a cant limit through a platform we’re the reason. And the points to and from the platform loop seem comfortably clear of the curve in both directions. So is it signalling? But if so, why, on a new installation?
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,831
Installing those gates at the end of 2017 did seem like very dubious value. I heard the hardware was being recovered so some of it could be re-used elsewhere, although I don't know where. It probably makes sense given how rarely they were actually in use.

Weren't they install as part of some sort of guarantee for funding for something?

The position on platform 2 in particular always seemed dubious, and effectively cut off the shop from over half it's potential custom at the busiest times, leading to it's closure. In theory passengers could ask to use the shop, but in reality how many people were going to do that, and there was always previous regular custom from non rail users such as people using the footbridge to get to town, waiting taxi drivers, and seemed to be effectively used as a small corner shop by some of those living near the station, who were cut off entirely.
 

KN94

Member
Joined
12 Mar 2025
Messages
71
Location
Stalybridge
Installing those gates at the end of 2017 did seem like very dubious value. I heard the hardware was being recovered so some of it could be re-used elsewhere, although I don't know where. It probably makes sense given how rarely they were actually in use.
They've gone into storage to act as spares, I believe.
 

Railsecrets

Member
Joined
9 May 2024
Messages
20
Location
Leeds
Just passed though Dewsbury this evening and noticed the ticket barriers have been removed.

I wonder if this TRU related or to do with the station front redevelopment?
A update on this:
TPE have confirmed they have permanently removed them, but no reason why.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,510
Location
Preston Lancs
Well there are so many good updates from the likes of Sarah Bell I feel my updates are a little superfluous. I took a trip today to view with my own eyes.
  1. After Stalybridge tunnel heading east but before Mossley there is a work compound on the north side. It could be for a more extensive route survey.
  2. I noticed after Mossley the embankments are very steep. My view is some pinning an earthwork stabilisation will be required.
  3. There is a Balfour Beaty compound set up at Slaithwaite.
  4. Around Church Fenton there is loads of kit missing - and not just wires.
  5. At Huddersfield station, I have never ever in my life seen so much scaffolding crammed into so little space. Overall at Huddersfield there was loads of orangemen.
I will post photos in a day or two.

EDIT - OT but -I learned Slaithwaite is pronounced slough -it !
 
Last edited:

MboroFC

Member
Joined
10 Dec 2025
Messages
264
Location
United Kingdom
Well there are so many good updates from the likes of Sarah Bell I feel my updates are a little superfluous. I took a trip today to view with my own eyes.
  1. After Stalybridge tunnel heading east but before Mossley there is a work compound on the north side. It could be for a more extensive route survey.
  2. I noticed after Mossley the embankments are very steep. My view is some pinning an earthwork stabilisation will be required.
  3. There is a Balfour Beaty compound set up at Slaithwaite.
  4. Around Church Fenton there is loads of kit missing - and not just wires.
  5. At Huddersfield station, I have never ever in my life seen so much scaffolding crammed into so little space. Overall at Huddersfield there was loads of orangemen.
I will post photos in a day or two.
Thanks, are there any electrification masts around Dewsbury yet?
 

Alexd

Member
Joined
12 Aug 2024
Messages
21
Location
West Yorkshire
Well there are so many good updates from the likes of Sarah Bell I feel my updates are a little superfluous. I took a trip today to view with my own eyes.
  1. After Stalybridge tunnel heading east but before Mossley there is a work compound on the north side. It could be for a more extensive route survey.
  2. I noticed after Mossley the embankments are very steep. My view is some pinning an earthwork stabilisation will be required.
  3. There is a Balfour Beaty compound set up at Slaithwaite.
  4. Around Church Fenton there is loads of kit missing - and not just wires.
  5. At Huddersfield station, I have never ever in my life seen so much scaffolding crammed into so little space. Overall at Huddersfield there was loads of orangemen.
I will post photos in a day or two.

EDIT - OT but -I learned Slaithwaite is pronounced slough -it !
Pronounced Slawit by locals, I live very close. ( sla as in slap)
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,203
I learnt the Slawit pronunciation info in the Stalybridge Buffet Bar from a friendly local. I think the on board train announcements have also been changed to reflect this.
I have known that since I bought a suit there in the 1980s.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,510
Location
Preston Lancs
Anyone know what this is on Huddersfield Station? I suppose it could be an electrification gantry base - surely not for a signal or is it? It has appeared since I last visited in December.
 

Attachments

  • Hudd 4.jpg
    Hudd 4.jpg
    272.2 KB · Views: 234
  • Hudd 5.jpg
    Hudd 5.jpg
    345.6 KB · Views: 234

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
Anyone know what this is on Huddersfield Station? I suppose it could be an electrification gantry base - surely not for a signal or is it? It has appeared since I last visited in December.
A staircase or footbridge support leg? Is it possible to give a more specific location with respect to the existing station?
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,510
Location
Preston Lancs

Attachments

  • Hudd 2.jpg
    Hudd 2.jpg
    282.8 KB · Views: 195

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,584
Location
Northampton
Thanks. That makes sense. I was getting too excited that OLE gantries could be going up sooner rather than later.
Not to worry. From the same design document it looks like most of the OLE is mounted to the roof or canopy in some way, to mitigate the impact of lots of masts around the station. So they may go up quite late.

The December Enhancements Delivery Plan shows the Huddersfield section of TRU to be On-Target for February2030 Entry into service, so visible signs of OLE may be a while away yet. There may be an updated EDP soon - it comes out about every quarter for England & Wales. Note that the date given is for EIS of all elements, so it's possible OLE could be delivered earlier (although OLE is likely to be one of the later things, after as much track and signalling work is complete to avoid needing to come back and amend things).
1773408096708.png
On another note - I was absolutely bamboozled by the amount of scaffolding in the station. See attached:
Looks like a crash deck - Bristol Temple Meads has only just got rid of it's one, they do make themselves felt don't they!
 