I have just looked at RTT to see how many special trains were going to Cheltenham Spa today and noticed that many trains in the Gloucster/Cheltenham are were being delayed by around an hour from mid morning, any members know the reason? TIA
Initial incident will have backed trains up, all rammed to the gunnels with race goers. Turning those trains back to recover service would have simply caused worse crush loads.If it was trespassers, it caused delays of nearly one hour to most trains in the area, lasting for a period of approx four hours.

It didn’t!I understand there was also a problem with the track (I've heard a broken rail) on the Birmingham-Bristol line today; not being all that familiar with the route, I'm not sure where, but it probably didn't help matters.
I can imagine being a train planner is a fascinating job. I imagine nowadays AI can be a great help. Feed the relevant timetable into it and it can probably help to identify spaces where a path may be possible. Obviously you'd still need a human to check the suggestions and account for speed, braking distance etcMany years ago I worked in the Train Planning Unit at Swindon. One March we had a new recruit who'd been given basic training and it was thought a good idea to set them a little project for them to gain real-time experience and see how well they did. So they were put in charge of compiling the train plan for the Cheltenham Festival. In those days there was a long single-line section from Swindon to Kemble, severely constricting capacity. Unfortunately the new train planner failed to include sufficient performance allowances or recovery margins and what started as a few minor delays snowballed into near-chaos. Most trains were late and a few arrived at Cheltenham after the first race had been run, leading to an avalanche of complaints.
Sometimes it's best to leave sensitive plans like that to the old hands!
Timetable Planning software these days will have presets for timing loads and performance already in, so if you tell it you want to go from A to B, it'll generate a path. Its then up to you to add in allowances and make it workable.I can imagine being a train planner is a fascinating job. I imagine nowadays AI can be a great help. Feed the relevant timetable into it and it can probably help to identify spaces where a path may be possible. Obviously you'd still need a human to check the suggestions and account for speed, braking distance etc.
Speed and Braking distance are accounted for in the database of runtimes (BPlan) and the Timetable Planning Rules. No human judgement in those elements (NR has a whole building of timetable planners, and then there's the TOCs, so it'd be far too variable if left to judgement alone). Some rarer movements like heritage stock or trains with specific characteristics (e.g. on tests) may be adjusted but in general it's a logic puzzle.I can imagine being a train planner is a fascinating job. I imagine nowadays AI can be a great help. Feed the relevant timetable into it and it can probably help to identify spaces where a path may be possible. Obviously you'd still need a human to check the suggestions and account for speed, braking distance etc
They got stitched up then in my opinion. If they produced something that was compliant and no one suggested looking at adding resilience then they didn't do anything wrong. A new planner is not going to know to take a step back and think wider. The same thing would happen today.Many years ago I worked in the Train Planning Unit at Swindon. One March we had a new recruit who'd been given basic training and it was thought a good idea to set them a little project for them to gain real-time experience and see how well they did. So they were put in charge of compiling the train plan for the Cheltenham Festival. In those days there was a long single-line section from Swindon to Kemble, severely constricting capacity. Unfortunately the new train planner failed to include sufficient performance allowances or recovery margins and what started as a few minor delays snowballed into near-chaos. Most trains were late and a few arrived at Cheltenham after the first race had been run, leading to an avalanche of complaints.
Sometimes it's best to leave sensitive plans like that to the old hands!
Attune comes out with some right old nonsense and false positives. You have to double check as you say.Timetable Planning software these days will have presets for timing loads and performance already in, so if you tell it you want to go from A to B, it'll generate a path. Its then up to you to add in allowances and make it workable.
Some newer software can identify clashes and turnarounds that are too short etc (so long as those rules and presets are input into the software) but it certainly won't fix it for you. That's still a human job!
I imagine it is just as likely to be a great hindrance too. AI may know what's in the official numbers but won't know how things actually work out in the real world. Essentially just like that newbie in the original comment.I imagine nowadays AI can be a great help.
Agreed. Infact it almost sounds like hazing to me - give the newbie a job you knoe they will mess up because they don't have the experience yet.They got stitched up then in my opinion. If they produced something that was compliant and no one suggested looking at adding resilience then they didn't do anything wrong.
Was also the same at Chelmsford back when V Festival took place.There is also a 20mpg TSR through Cheltenham during races week presumably for safety reasons in case inebriated racegoers take a tumble onto the tracks which slows down operations
Old Ends crossing had a broken rail in the crossing surface in the up direction. That train ran wrong line back stopping at Yate and crossing back to the down line at Westerleigh Junction. Coaley ground frame which would have been an "official" cross over point would have needed an operator but has been unusable for ages.As an aside, yesterday’s fun and games resulted in RTT showing a passenger train as terminating at Charfield (2E66 14.03 Westbury -Charfield). Looking at the entry it got that far before being turned back - I hope! Otherwise, the poor passengers are going to be very bored by the time there’s a station for them to get off at!