geordieblue
Member
There’s an STP in from Lindsey Refinery to Jarrow next Monday (9 March), flows out of Lindsey restarting?
Also spotted there was a Masborough-Tees and return last week...
Slam door stick was still running when I last went to Tilbury. Is the terminal near the Riverside old station?
There's some DB aggregate moves from Machen Quarry to Appleford (via Westbury) scheduled over at least the next two days. Are these just one off moves or will it become fairly regularly over the coming weeks?
If Goole is already geared up for storing and handling these rails I imagine they will be at the front of the queue for the job.
November 28, 2025
British Steel secures £35m contract for Turkish high-speed project
British Steel will supply £35m ($45.7m) worth of rail products to Türkiye’s high-speed rail network under a newly announced contract.
https://www.railway-technology.com/news/british-steel-contract-turkish-high-speed-project/?cf-view
CWR long rails up to 216m long loaded on BQA/ IGA/ IGB/ YEA type wagons,
These movements are within gauge but are subject to a minimum radius of 120 metres.
https://spartan.metinvestholding.com/en-us/products-and-services/
Spartan UK can produce plates with thickness from 12mm to 150mm, max width 2100mm and max length 22,000mm.
Thanks to its wide production mix, Spartan UK plates can be used in the most varied of sectors including buildings, bridges, yellow goods, industrial machinery, wind turbines and general construction.
The steel trains run for a few weeks when a new shipment of steel comes in, it’s quite normal to have gaps of a few weeks between these blocks - last year for example there was a three week gap from 29th July to 18th August, and a much longer gap from 2nd September (when the last DB working ran) and 20th October.Apologies if this has been covered already but what’s the latest on the Portbury > Margam steel flow? Every recent diagram has been cancelled according to my (free) view in RTT. Has this service stopped for the time being? I ask because I like to plan my after-work rides to catch a glimpse of it along the Pill Path!
Rumor mill says Middleton Towers is closing in April this year.Any update on the Gbrf loosing Middleton towers traffic rumor?
I've heard from Anglia Gen on Facebook that it's only the GBRF flows that are ending, DCR flows (and possibly FL) will be continuing as usual. Of course, just rumours.Rumor mill says Middleton Towers is closing in April this year.
Hum,interesting. I understand that Goole switched sand supplies due to inferior product from Middleton Towers, wet or not dry enough sand been quoted. Can't remember who or where I read it though.I've heard from Anglia Gen on Facebook that it's only the GBRF flows that are ending, DCR flows (and possibly FL) will be continuing as usual. Of course, just rumours.
Class 4 (75mph) so not cement from Hope.Some Heavy Haul paths in tomorrow to Ellesmere Port Manisty Wharf which hasn't seen revenue earning freight since about 2016 https://www.realtimetrains.co.uk/se...26-03-14/0000-2359?stp=WVS&show=all&order=wtt
Anybody have an idea what this is about? Possible trial stone train?
Class 4 (75mph) so not cement from Hope.
Looking at the route of this, it's booked straight onto the Independants at Crewe via the 'Up & Down Chester Indepdndant' If this runs regularly (and the signallers actually send it via the chord) it'll the first regular freight to use the chord since the 2024 resignalling if i'm not mistaken!DCR have, reportedly, ceased working into Tytherington for HS2 aggregates, as of next week 6M29 will be operating daily between Penmaenmawr Quarry and Quainton Railhead alongside the current 6A25
So that's why we have had no slate chippings traffic from Llandudno Jct this year.I've since learnt that this is flyash from Fiddlers Ferry power station for Earles sidings. Reason not being loaded at Fiddlers is because the signalling is currently / sidings are currently out of use so it is being trucked from the power station to Ellesmere Port.
All three cement works delivering to Avonmouth belong to Heidelberg so any permutation would seem to be possible.Does anyone have any more information on the new Ketton to Avonmouth flow that started last week? Has this replaced the Penyffordd flow or is it just a short-term working?
Funnily enough I saw a GBRF van parked up in a lay-by on the A30 on Monday afternoon in Cornwall. I did wonder what it was doing there!GBRF are reported to be taking over the Cornish clay work from April bringing an end to EWS,DB being seen in the far west.
Info from various private Facebook groups.
Though someone here may have more details/info for workings etc.
Considering that a load of money is being spent on upgrading the Penyffordd crossover, it would be a bit wasteful if traffic from there was ending…All three cement works delivering to Avonmouth belong to Heidelberg so any permutation would seem to be possible.
As far as I know, the current hiatus is due to maintenance work at PenyfforddConsidering that a load of money is being spent on upgrading the Penyffordd crossover, it would be a bit wasteful if traffic from there was ending…
I see, thanks for the help everyone. I'll make the most of the long PCA rakes while they're down Bristol way then!As far as I know, the current hiatus is due to maintenance work at Penyffordd
and trains should restart in due course...
MARK
A new loading point for DCR next Tuesday showing on RTT as 0313 6O11 Willesden to Newhaven Aggregate Terminal for 1049 6M12 to Chessington South Sidings, no idea if it's a new regular service or a one off
There’s an STP in from Lindsey Refinery to Jarrow next Monday (9 March), flows out of Lindsey restarting?
The runs with 66850 were so that Colas could keep the paths.Looks like that Jarrow working didn't run, but 66850 has been in and out of Lindsey several times this week on light engine moves to Kingsbury and back, presumably route learning, which suggests traffic may be restarting from Lindsey. Last I heard, there was little prospect of the refinery itself reopening, but Phillips 66 (owner of neighbouring Humber Refinery) had bought it with plans to use some of the infrastructure such as storage tanks... so perhaps the rail loading facilities too? https://www.bbc.com/news/articles/c2d7xn7ed66o