Bletchleyite
Veteran Member
On this thread:
www.railforums.co.uk
...it's pointed out that Bletchley has lifts to all platforms except 6 for the Marston Vale. I suspect the reasons for this are twofold - one, that BR expected at the time the lifts were installed that the line would close fairly soon, and two, that at the time they could use Platform 5 more readily for this service as until the 12-car platform extensions you could get from the Up Bletchley and the carriage sidings to Platform 4 so 5 wasn't needed as much for other purposes (though in my experience the service has mostly used 6 for the time I've been familiar with it, which is about 25 years now).
Notably the maps on the Class 730s are wrong and suggest Bletchley has lifts to all platforms. It can generally be arranged for the MV service to use 5 when it is booked 6 (even if they have to shunt it out of the station or across to 6 during the long layover to let a freight past or get a unit out of the depot or carriage sidings) but it's only done when assistance is booked, though some services where no other use of 5 is required during the layover time (e.g. during the day) do use it anyway.
Are there any other stations in this sort of position, and what in each case are the reasons, even if they might be flawed?
I don't include here London Underground, where there are quite a few examples and the reason is generally the cost/complexity of doing this underground. Just "National Rail" stations.
Bletchley Eastern entrance UPDATEs
My apologies, and mods please delete or move this if so, if there is already a more appropriate thread somewhere - it didn't quite fit with E-W rail updates or consultation as it is about an existing station - but is it worth having a thread for updates on the new eastern entrance to Bletchley...
...it's pointed out that Bletchley has lifts to all platforms except 6 for the Marston Vale. I suspect the reasons for this are twofold - one, that BR expected at the time the lifts were installed that the line would close fairly soon, and two, that at the time they could use Platform 5 more readily for this service as until the 12-car platform extensions you could get from the Up Bletchley and the carriage sidings to Platform 4 so 5 wasn't needed as much for other purposes (though in my experience the service has mostly used 6 for the time I've been familiar with it, which is about 25 years now).
Notably the maps on the Class 730s are wrong and suggest Bletchley has lifts to all platforms. It can generally be arranged for the MV service to use 5 when it is booked 6 (even if they have to shunt it out of the station or across to 6 during the long layover to let a freight past or get a unit out of the depot or carriage sidings) but it's only done when assistance is booked, though some services where no other use of 5 is required during the layover time (e.g. during the day) do use it anyway.
Are there any other stations in this sort of position, and what in each case are the reasons, even if they might be flawed?
I don't include here London Underground, where there are quite a few examples and the reason is generally the cost/complexity of doing this underground. Just "National Rail" stations.
Last edited: