but until something is done there will still be DMUs running into Waverley from this line. Things might well change as batteries and charging capabilties and systems develop, but I would say go with what works now (it's not an immature technology) and get rid of some more diesel emissions in the city centre.Agreed: BEMUs are the future. There are two strategic decisions needed now for future GB electrification programmes:
Getting back on topic, there is a real risk that the four and a half miles of electrification being planned for the 30-mile Borders Line will prove in future to have been unnecessary.
- What range should BEMUs have off the wires? (i.e. operating range in all conditions, without over-draining batteries). This determines what the spacing needs to be between islands of electrification. I note that the 802207 trial suggested that a BEMU based on the 802 with "all three GUs were replaced by batteries, a return run of 135 km off wire was feasible e.g. York to Scarborough."
- At what rate should BEMUs recharge? Should they recharge at the limits of OHLE contact wires (i.e. 7.5MW), which might mean more expensive batteries to accept that charging rate? Or at a slower rate, which would require longer lengths of OHLE in every island of electrification?
The next time stock needs renewing will be the time to see what has emerged and move to whatever has become the most cost- and energy-efficient system by then. For now just forget the bionic duckweed, hydrogen and other subsidy-farming rubbish (see the last paragraph of https://www.bbc.co.uk/news/articles/cnv6e5l588jo "A house built on sand") and implement a sensible BEMU scheme asap.