If a Coryton is only +3 late it throws the whole paths out with Rhymney line services.
So far as I can see a huge amount of the disruption is caused by the fact that Heath Junction is almost always set for a train coming down from Caerphilly well before it reaches the junction.
So a train from Coryton arriving at Low Level 3 minutes late misses its path at the junction and just sits there waiting for the train it should have gone in front of to pass, even though there would have been plenty of time for the train from Coryton to pass the junction without actually delaying the train from Caerphilly.
I'm sure there is a very good reason it's done like this, and I appreciate the logic behind setting the path at a junction so drivers don't get a yellow aspect on approach. But as all trains from Caerphilly are timetabled to call at Heath High Level, it's not obvious to me why it matters in this case - whether they get yellow or green at the signal before the junction, they're going to stop at the next signal anyway.
This is then compounded by the frequent decision to turn delayed trains at Heath and have them sit there even for 15 minutes or so rather than running further up the line, or indeed going the whole way but skipping stations.
Going forward the time it takes for the doors to release, steps extend and close etc is coming in at 40/50 seconds per stop.
That agrees with my experience - and it doesn't seem to be compensated for by improved acceleration between stations.
But much of this is caused by the way the doors are currently worked, not the trains themselves. If the doors were worked from a cab (either by the driver or a guard in the rear cab) then dwells would still be longer than a non low floor train as time is still needed for ramps to deploy and retract, but it would only be 2 cycles per station, not 4.
So I'd have thought a 398 would be just as bad if worked in the same way, unless they are set up so that all ramps extend when the ramp goes out for the local door and maybe the local door can be shut without having to wait for the alarm to sound. And maybe their ramps are quicker?
Currently though the Coryton Line seems to just about work with Ty Glas closed - but perhaps trains are being driven to arrive at Heath when they need to, and when Ty Glas reopens they will be driven a bit harder to make up the extra time they need.