There is no status quo, well unless you’re based at a certain depot down west. And from what I can see the staff are keen to move on and learn the new traction. I have an opinion on tram-trains, so do many senior colleagues, who are experienced enough to know they are not fit for this kind of work. We are not Germany or Manchester and the area is very unique. Would it benefit from a metro, definitely, however the valleys are completely deprived and there is nothing left in terms of work.
Moving on, an agreement called DRI3 has set up the future valley drivers and gaurds for massive changes to their working environment. This does not affect the mainline, who outvoted them on something that they should never have been allowed to be included in. The majority of senior drivers will be gone soon anyway, when the time comes, and that will be 398 rollout no doubt.
You for sure can expect more delays with these compared with the flirts. Customers have waited years on the valleys to have decent trains, now they have them they will soon be taken away and replaced, it’s a shame.
Valley drivers are also in for a shock when they see what is to come on these, and they are being told they are trains, tram drivers will be employed to do the latter bits etc by union guys, who are more concerned in getting out of working trains altogether.
The truth is they won’t, the current drivers are doing that bit too! And once signed up on line of sight for the bay, it will gradually get introduced elsewhere on the valleys. By then you are already trained and there is nothing you can do about it.
I’ve heard over and over as long as they pay me 70k I’d drive anything. Current drivers will be downgraded in the future, and tfw will save thousands in wages per unit on the network, lowering the cost per mile for passengers.
When the time is right they are going to order more soon for the rest of the CVL, and the flirts will be moving to the mainline. Yes Rhymney line enjoy your toilets!
Mainline will then get dissolved into GBR and you have the valleys, light rail system running as an entire system on its own. All signalling controlled from Taffs well. Tfw will then franchise it off as a completely different network to the highest bidder, stick a different colour T on the network, passing on the operating costs form the government.
The issues mentioned with the 398’s are valid, and the team are working away trying to meet a deadline. More cash is needed and sadly it’s not coming in the quantities they would like.
I’d happily welcome a second opinion to correct the incorrect assumptions made here. All opinions were based on operational experience with the units and seeing designs and procedures first hand.
Luckily I’ve not got long left in this industry, and like many other colleagues we wish them all the best. But don’t say we didnt tell you about it!