If you could re-design HS2 with hindsight, knowing everything you know now, would you do it differently?
I would make a 'Y' shaped route... at the south end. One leg to Heathrow airport, the other to Euston, with no faffing about trying to serve Old Oak Common. There could then be, potentially, a totally different solution for OOC on the main lines. In my view a high speed line shouldn't have many intermediate stops, certainly not close together like OOC and Euston would be. Of course, we are where we are now...!If you could re-design HS2 with hindsight, knowing everything you know now, would you do it differently?
Some of this I agree with, certainly the M1 corridor (which was dismissed by the HS2 studies, but far too hastily I've always believed). Not sure about the rest thoughPretty much everything, because what I think is needed in a country with our population distribution is a “National Crossrail” not a TGV.
Follow the M1. Link to HS1 at the London end. Have stops at Old Oak (with a link to Willesden Junction), Milton Keynes, Leicester, Birmingham Airport, central Birmingham, Manchester Airport and Manchester.
Combined with HS1 you now have a railway linking pretty much all the major railway lines and several major aiports. Run 4th from Dover to Manchester Airport stopping at all stations. Between these services slot in numerous services from London to the north via Birmingham only.
Do not incude Glasgow or Edinburgh services. If they sprint up the High Speed line to Crewe and then continue to Scotland without tilt, they will take longer than they currently do. Just leave these running with tilting trains on the (emptier) conventional network.
The concept of this, the main spine more thickly outlined, was the best by far. Firstly NPR was not on the radar when the odd HS2 Y shape was presented. The Y shape should have been dropped when NPR was in active focus. This incorporates NPR. Should have been NPR with a base tunnel under the Pennines. An upgraded ECML to 140mph or over an removal of bottlenecks. ECML branches to London and HS1. NPR could have been built by now, inc base tunnel, for less of than cost of HS2 from London to Aylesbury. Birmingham to the ECML would be on an upgraded line to Derby. Birmingham to London on an upgraded Chiltern Line.
![]()
I agree with this.Yes. Handsacre wouldn't even be a line of crayon on a piece of paper.
Not really.There are many things on this map that make me smile but given how much folk complain about putting a line across the Chilterns this is proposing putting one across the UK’s first National Park!
Not really.


Both sensible.I would probably do a combined phase 1 and phase 2A, following the route as is to Crewe. I would rename Curzon Street to Moor Street,
That does have to in part at least be blamed on the planners.I don't think I could design a better overall route than the existing one that's been produced by dozens of trained experts (the fact that mismanagement, NIMBYism and political interference has led to the route being quite troublesome is another thing).
That's not true. With an expected time saving to Crewe from London of 55 minutes, assuming HS infrastructure extends that far, that comfortably offsets any small increase in journey time north thereof due to no tilt. Even with just the Phase 1 Handsacre connection, time savings should be made to Scotland. TPE today can often do Preston - Glasgow only 11 or 12 minutes slower than an Avanti Pendo, and the TPEs typically make ~2 more stops en route. NR are investigating raising non EPS speed in some places for non-tilt units that can exceed 110mph, including future HS2 trains, so that should help claw back a few more minutes. Tilt trains can be quite a bit heavier than similar non-tilt examples, which affects their acceleration performance.Do not incude Glasgow or Edinburgh services. If they sprint up the High Speed line to Crewe and then continue to Scotland without tilt, they will take longer than they currently do. Just leave these running with tilting trains on the (emptier) conventional network.
NPR is best with a base tunnel emerging around Barnsley. NPR branches into an upgraded ECML.How are you doing Sheffield-Manchester then? Going around or going underneath?
View attachment 198204
(Image is a cropped version of the OP, highlighting with red how the proposed high speed line runs London-Leicester-Sheffield-Manchester-Liverpool).
Here’s the route with the national park:
View attachment 198206
(Image shows the proposed route Leicester-Sheffield-Manchester-Liverpool crossing the UK’s first national park).
Moor street to new street are actually pretty close. The main barrier is the between station transfer rules.Better interchange between Curzon Street and New Street: walking between the two will be frustrating with luggage
NPR is best with a base tunnel emerging around Barnsley. NPR branches into an upgraded ECML.

In that case I must eat my words; I have certainly read that HS2 will be detrimental to Scottish journey times before.That's not true. With an expected time saving to Crewe from London of 55 minutes, assuming HS infrastructure extends that far, that comfortably offsets any small increase in journey time north thereof due to no tilt. Even with just the Phase 1 Handsacre connection, time savings should be made to Scotland. TPE today can often do Preston - Glasgow only 11 or 12 minutes slower than an Avanti Pendo, and the TPEs typically make ~2 more stops en route. NR are investigating raising non EPS speed in some places for non-tilt units that can exceed 110mph, including future HS2 trains, so that should help claw back a few more minutes. Tilt trains can be quite a bit heavier than similar non-tilt examples, which affects their acceleration performance.
That only tilt trains can go faster than 110mph on this section is an artifact of how modernisation was carried out exclusively for new Virgin trains at the time, with the new higher EPS speeds only being authorised for trains fitted with the new TASS (tilt advisory and speed supervision) system. There are many places on the WCML where pendolinos go faster than 110mph but do not actually tilt, because the line is straight or only very moderately curved. An example is the section from Crewe to Preston, near straight all the way, yet limited to 110mph for all non-tilt stock.
I agree, but I want to check. Handsacre was the wrong place to divide the phases?Yes. Handsacre wouldn't even be a line of crayon on a piece of paper.
That's interesting. Build Coventry towards Balsall Common (albeit in the green belt and getting close to the flight path) and rebuild Berkswell as a city centre station plus HS2 interchange. Widen the rail corridor with the metro. Prioritise local residents, people coming by metro and local existing rail (and a parkway at the east end of the metro line), rather than a station located for an airport.Building Birmingham Interchange about halfway between Coventry and the Airport instead of as a giant parkway station, with a people mover connecting the airport, International station, the NEC, Interchange HS2 station and Coventry, where it would join the city's light rail network. Then you could build a lot of high-value housing around the station as well. I know the WM Metro Eastside extension will eventually get to Interchange but that'll take decades at this rate.
The anti-HS2 movement latched onto the issue for a while, and much of the media lapped it up without checking.In that case I must eat my words; I have certainly read that HS2 will be detrimental to Scottish journey times before.

I agree with the idea of a second north-south line. I've gone for going via Luton and Leicester, but have thought about going via Peterborough.Scope for another line to be built from London to meet the X somewhere near the Sheffield station, via Cambridge.
Something approximately like this sketch. Obviously more development work is required, when I'm not sat on a train!
View attachment 198210
*This one is a bit dubious. But I'm biased as it would be of great benefit to me personally! Also the new high speed line would be do much faster than the existing that it wouldn't really matter having an extra stop, unlike a stop at Milton Keynes, for example.
For starters, don't bother with OOC and go straight to Euston.

The fact that HS2 was produced by dozens of trained experts is not necessarily a great recommendation, given that their design did not prevent what has happened to it. Whilst you’ve recognised that there are other factors that have contributed to the decimation of the project, surely there is more that you would change with the benefit of hindsight?I don't think I could design a better overall route than the existing one that's been produced by dozens of trained experts (the fact that mismanagement, NIMBYism and political interference has led to the route being quite troublesome is another thing).
That is, I think, why a bunch of people here, including both amateurs like myself and experts like @The Planner have "remove Handsacre, have phase 1 all the way to Crewe" as the main/only change to the route under construction.With hindsight a scheme which was designed so that it would not be vulnerable to being terminated at Birmingham, would surely be a better prospect than what we have now?