And I can confirm that "from the horse's mouth" so to speak.
Do CSRE have any idea where they might site an assembly plant?
And I can confirm that "from the horse's mouth" so to speak.
Do CSRE have any idea where they might site an assembly plant?
Virgin could use the paths they have currently to run the following hourly pattern with more 11 car Pendolinos:
* Glasgow to Euston with additional call at Crewe to set down only southbound and to pick up only northbound. 11 car Pendolino.
* Manchester to London via Stoke with calls at Stockport, Macclesfield and Stoke. 11 car Pendolino.
* Manchester to London via Wilmslow with calls at Stockport and Wilmslow and possibly call at Crewe to set down only southbound and to pick up only northbound. 11 car Pendolino.
* Stoke to London via Birmingham with call at Wolverhampton. 11 car Pendolino. (existing call pattern south of Birmingham)
* Birmingham to London x 2. 9 car Pendolinos. (existing call patterns south of Birmingham)
* Liverpool to London. 9 car Pendolino. (existing call pattern)
* Liverpool to London. 9 car Pendolino. Calling at Crewe and Milton Keynes Central.
* North Wales to London - remains same as now
If CSRE want support at both local and national level then Derby would be a good place to consider, they could in theory takeover the existing Bombardier works there which would save quite a bit on setting up a new factory as most of the infrastructure is already there rather then having to set up a brand new site when a existing one is good enough to use.
You are suggesting cutting one of the Manchester services (with Stoke having a replacement by extending the EBW)?
Given the number of units GNWR would need for their proposals, I think Bombardier's Derby site would be a bit on the large side
You are suggesting cutting one of the Manchester services (with Stoke having a replacement by extending the EBW)?
--- old post above --- --- new post below ---
Given the number of units GNWR would need for their proposals, I think Bombardier's Derby site would be a bit on the large side
If CSRE want support at both local and national level then Derby would be a good place to consider, they could in theory takeover the existing Bombardier works there which would save quite a bit on setting up a new factory as most of the infrastructure is already there rather then having to set up a brand new site when a existing one is good enough to use.
OK, first ask yourself what the UK's public debt is currently running at (when I last looked, it was £1.38 Trillion, that's 1,380,000,000,000).
Yes but they will also be bidding for other orders such as crossrail, cardiff Valley lines if they are wired and the merseyrail contract's.
I also suspect that a few new dmu's will need to be ordered to replace the pacers and it could be possible to build a bi-mode version which the ROSCO's may be more willing to buy.
Finally CSRE could also bid for other contracts in the eu as well
would help if CSRE's website was fully functional...
Not to be critical but 1,380,000,000,000 is 1,380 trillion in economics....
£1.38 Tr is actually 1,380,000,000 (1,380bn)
In the imperial measurement system 1.80 Tr would be 1,380,000,000,000,000,000,000,000
would help if CSRE's website was fully functional...
If CSRE want support at both local and national level then Derby would be a good place to consider, they could in theory takeover the existing Bombardier works there which would save quite a bit on setting up a new factory as most of the infrastructure is already there rather then having to set up a brand new site when a existing one is good enough to use.
A trillion is 10^12 (one thousand billion, or one million million).
£1.38tn is £1 380 000 000 000.
There's no arguing; that's the way it is.
Yes but they will also be bidding for other orders such as crossrail, cardiff Valley lines if they are wired and the merseyrail contract's.
I also suspect that a few new dmu's will need to be ordered to replace the pacers and it could be possible to build a bi-mode version which the ROSCO's may be more willing to buy.
Finally CSRE could also bid for other contracts in the eu as well
I am sure i read somewhere that one proposed site was in south wales, and i think another was in the north west of england
Sorry, too busy dealing with customers' enquiries![]()
Just looked at the Pulsar - now hoping that 1) At least one of the companies bidding for the Northern/TPE franchise propose purchasing these, and 2) DafT selects that (or one of those) bid(s).
Here's the Pacer replacement one I found that way: http://www.csre.co.uk/files/Download/2010_Pulsar_Data_Sheet_v2.pdf The illustration of the train says Sheffield on the front. Let's hope some brand new units are coming to the North to replace Pacers in the next few years.
The length is shown as 19 metres in the document in the link. Is there any likelihood that a longer version could be produced or is the standard package offered for this particular unit carriage?