With the building od Sizewell C starting, the plans include using the branch from Saxmundham to Leiston to bring in materiels and mitigate the amount of lorries travelling on the local roads. There have been suggestions in some quarters that passenger traffic could also restart on the branch, initially as a means of getting construction staff in and out each day but with the hope that after several years of construction the service might live on beyond that. Personally, I can't see it as viable as there seems to me to be only 3 options for such a service;
So all the possibilities for a passenger service to Leiston seem to me to be impossible without significant investment in infrastructure which can surely never stand up to a cost/benefit analysis against the revenue that could be generated.
Can anyone see a case where such a service could be made to stand up?
With the building od Sizewell C starting, the plans include using the branch from Saxmundham to Leiston to bring in materiels and mitigate the amount of lorries travelling on the local roads. There have been suggestions in some quarters that passenger traffic could also restart on the branch, initially as a means of getting construction staff in and out each day but with the hope that after several years of construction the service might live on beyond that. Personally, I can't see it as viable as there seems to me to be only 3 options for such a service;
a branch-only shuttle - there's no bay at Saxmundham so there's a problem in how close a connection you can make between branch trains and East Suffolk Line services without blocking the branch line for the construction traffic. And without those connections the value of the service immediately diminishes.
portion working off/on East Suffolk Line trains to/from Ipswich - this would result in 6, 7 or 8 car trains south of Saxmundham and I doubt there are any platforms at those stations capable of handling more than 4 cars and additional staff would be required for the attaching and detaching at Saxmundham.
through working to Ipswich - I doubt there is the capacity for many additional trains on that route, especially west of Westerfield and in the platforms at Ipswich for any worthwhile service frequency. I am assuming that the existing (and growing) service frequency up to Lowestoft would have to be maintained.
So all the possibilities for a passenger service to Leiston seem to me to be impossible without significant investment in infrastructure which can surely never stand up to a cost/benefit analysis against the revenue that could be generated.