Meanwhile, in TPE news, 9E05 05:20 Liverpool-Newcastle ran fast from York to Newcastle because it was 30 late at York. That's the main morning commuter train from Northallerton to Darlington, Durham and Newcastle. It appears that, unlike normal routine, no LNER was stopped to deal with it either. The next train northbound from Northallerton was LNER's 1N01 some 75 minutes after 9E05 should have left.

Not dissimilarly, Chester-le-Street, which largely depends on Transpennine Express for calls, saw this morning's Northbound 08:15 peak service pass without calling, as did the 09:16.

The 14:14 and 15:13 this afternoon have been cancelled outright.

There was therefore a 66 minute gap between calls in the morning peak, and those calls were two car Northern services.

This afternoon's timetabled gap is three hours, only reduced to two hours 2h40m ish by the late running of the 13:15.

It looks as though Durham's Northbound morning peak service was nearly as parsimonious, partially as an exacerbation of the current East Coast Main Line timetable's extreme imbalance around the clockface at that station.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Segedunum

Established Member
Associate Staff
International Transport
Joined
22 Dec 2013
Messages
4,754
Location
Up North
Not dissimilarly, Chester-le-Street, which largely depends on Transpennine Express for calls, saw this morning's Northbound 08:15 peak service pass without calling, as did the 09:16.

The 14:14 and 15:13 this afternoon have been cancelled outright.

There was therefore a 66 minute gap between calls in the morning peak, and those calls were two car Northern services.

This afternoon's timetabled gap is three hours, only reduced to two hours 2h40m ish by the late running of the 13:15.

It looks as though Durham's Northbound morning peak service was nearly as parsimonious, partially as an exacerbation of the current East Coast Main Line timetable's extreme imbalance around the clockface at that station.
1613 and 1713 now cancelled (former running fast, latter binned entirely) at Chester-le-Street.

Small mercy for Darlington/Durham this morning is that the following LNER (0808 Darlington-Newcastle) was 9 vice 5 carriages.
 

D1537

Established Member
Joined
11 Jul 2019
Messages
2,054
Location
North Yorkshire
Not dissimilarly, Chester-le-Street, which largely depends on Transpennine Express for calls, saw this morning's Northbound 08:15 peak service pass without calling, as did the 09:16.
The railway running services for the railway, not the passengers. Little changes, especially with TPE.
 

Tge1435

Member
Joined
20 Oct 2023
Messages
14
Location
Northumberland
Meanwhile, in TPE news, 9E05 05:20 Liverpool-Newcastle ran fast from York to Newcastle because it was 30 late at York. That's the main morning commuter train from Northallerton to Darlington, Durham and Newcastle. It appears that, unlike normal routine, no LNER was stopped to deal with it either. The next train northbound from Northallerton was LNER's 1N01 some 75 minutes after 9E05 should have left.
This was the exact same for me last night also, left Leeds 35 minutes later than planned and when we got to York, decided to cancel the rest of the stops and head straight up to Newcastle.
 

TUC

Established Member
Joined
11 Nov 2010
Messages
5,071
The examples above do suggest a rail system which is focussed upon Manchester, with little consideration of the impact upon North East commuter.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,345
Location
Yorkshire
Is there any update on when the tunnel may reopen? Are TPE services likely to be diverted on Thursday, or will it be back to normal by then?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,801
Is there any update on when the tunnel may reopen? Are TPE services likely to be diverted on Thursday, or will it be back to normal by then?

Latest is for it to open for start of service Thursday morning. That could change of course. Some fairly heavy duty engineering going on.
 

David Bullock

Member
Joined
18 Mar 2018
Messages
71
The railway running services for the railway, not the passengers. Little changes, especially with TPE.
im not sure its all 'the tail wagging the dog' - making sure that these delays are not transmitted across the national network does sort of depend on these trains presenting as planned at leeds and manchester as these are the major bottlenecks where lots of bits of the network converge. If it goes wrong there then disruption is much more likely to spread across the country.

thats not to say that two consecutive cancellations at Chester-le-Street is acceptable, but skipping stops and terminating services early is more than just an exercise in box ticking and making the operator look good.
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,303
Location
milton keynes
Latest is for it to open for start of service Thursday morning. That could change of course. Some fairly heavy duty engineering going on.
This is looking like an occasion where the railway has shown it can get itself into gear and get on with what needs to be done quickly. Best of luck to the team on this, spinning up a repair job in this situation within hours of getting access is the very best of 'the railway' spirit.
 

Lawrence18uk

Member
Joined
13 Aug 2020
Messages
19
Location
cambridge
im not sure its all 'the tail wagging the dog' - making sure that these delays are not transmitted across the national network does sort of depend on these trains presenting as planned at leeds and manchester as these are the major bottlenecks where lots of bits of the network converge. If it goes wrong there then disruption is much more likely to spread across the country.

thats not to say that two consecutive cancellations at Chester-le-Street is acceptable, but skipping stops and terminating services early is more than just an exercise in box ticking and making the operator look good.
In this situation, presumably taxis make sense?
 

TUC

Established Member
Joined
11 Nov 2010
Messages
5,071
im not sure its all 'the tail wagging the dog' - making sure that these delays are not transmitted across the national network does sort of depend on these trains presenting as planned at leeds and manchester as these are the major bottlenecks where lots of bits of the network converge. If it goes wrong there then disruption is much more likely to spread across the country.

thats not to say that two consecutive cancellations at Chester-le-Street is acceptable, but skipping stops and terminating services early is more than just an exercise in box ticking and making the operator look good.
But there is such a thing as sharing the pain and skipping stops at different stations for each journey.
 

D1537

Established Member
Joined
11 Jul 2019
Messages
2,054
Location
North Yorkshire
im not sure its all 'the tail wagging the dog' - making sure that these delays are not transmitted across the national network does sort of depend on these trains presenting as planned at leeds and manchester as these are the major bottlenecks where lots of bits of the network converge. If it goes wrong there then disruption is much more likely to spread across the country.

thats not to say that two consecutive cancellations at Chester-le-Street is acceptable, but skipping stops and terminating services early is more than just an exercise in box ticking and making the operator look good.
The ridiculous thing about running 9E05 fast to Newcastle is that unless there is something that we're missing, it wasn't necessary. It was 30 late at York, but it has 37 minutes to spin at Newcastle (plus 3 minutes allowance on its way).

I really hope they weren't trying to minimise the delay repay, because if they were (a) 9E05 isn't that full anyway before it arrives at Northallerton and (b) given the time until the next service, a number of passengers were told to get a taxi to Darlington, which TPE will be paying...

Still, better today. Cancelled from Liverpool, started at York instead, still 30 late.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,654
Location
Nottingham
The ridiculous thing about running 9E05 fast to Newcastle is that unless there is something that we're missing, it wasn't necessary. It was 30 late at York, but it has 37 minutes to spin at Newcastle (plus 3 minutes allowance on its way).
Could be the crew were rostered to work the return and needed a break in between?
 

mpthomson

Established Member
Joined
18 Feb 2016
Messages
1,383
No-one seems to have replied to this. Did they actually do that? If not it is indeed surprising.
The fire services own postings state that they utilised and open water source, so the canal is a likely option.
 

800Travel

Member
Joined
3 Nov 2023
Messages
658
Location
UK
Could be the crew were rostered to work the return and needed a break in between?
TPE were starting some services late from Newcastle in order to facilitate crew breaks. So doesn't necessarily require skipped stops on the inbound working
 

josh-j

Member
Joined
14 Sep 2013
Messages
321
TPE's advice was updated sometimes in the last few hours and now states:
Work to repair the tunnel and reopen the line have been ongoing, and we now expect the line to reopen tomorrow, Thursday 29th January at 05:20.
https://www.tpexpress.co.uk/travel-updates

Previously this said something about not expecting the tunnel to reopen before Thursday 06:00 at the earliest so this sounds like good news!
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
The fire services own postings state that they utilised and open water source, so the canal is a likely option.
Dramatic pictures up-thread from 1.5k inside the tunnel!
I don't think it was a water source problem, more of getting it over a distance of 1.5k.
Just connecting a hose doesn't work!

It would have needed staged/relay pumping and larger diameter hose [at least in the initial stages] to reduce pressure loss and then to deliver sufficient quantities of water!
In the open fire tenders can provide the staged pumps, but in the tunnel independent pumps would probably have been brought in.
All would have needed both planning and resource.

I am not sure if RAIB will be reporting [I would expect but do not know].
There could be quite a number of learning points to come from this.
 

Viper

Member
Joined
11 Apr 2020
Messages
73
Location
York
I would expect that the adjacent tunnels will have been used to provide access for the fire appliances into the tunnel rather than running equipment from the appliances outside the tunnel.
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
Thanks @Viper - would there be room to turn a fire tender to relay water up to the fire? Or can water from the canal be accessed inside a service tunnel?
 

Viper

Member
Joined
11 Apr 2020
Messages
73
Location
York
I don't know the logistics personally, however I was reading that the disused tunnels can be used for access, and have personnel access links into the railway tunnel.
 

josh-j

Member
Joined
14 Sep 2013
Messages
321
Canals are not very deep - I'm not sure whether it would necessarily be a suitable water source for the big pumps they use. So maybe they had to run lines in from outside the tunnel.

All speculation though - they know what they're doing.
 

Fawkes Cat

Established Member
Joined
8 May 2017
Messages
5,282
Joined
1 Nov 2021
Messages
307
Location
Berwick
No-one seems to have replied to this. Did they actually do that? If not it is indeed surprising.
Normal practice is to pump water from the canal from the outside as the shafts linking to the canal inside are not the safest places to work. There is a a design response to the tunnel which makes use of the ‘disused’ tunnels which has cross shafts to both the canal and the live bore. It is just possible, or was in my day, to turn a fire engine around in the ‘cathedral’ which joins the two original tunnels roughly in the centre. The photos show a ground monitor in use which requires a water supply using 64mm hose with intermediate pumps doubling the hose significantly increase the capability to pump water although as the tunnels are level that makes life easier. The canal is for all intents an unlimited supply.
 
Status