Mattplans
Member
Hopefully they are idiot enough to buy an e-ticket from City Thameslink to Blackfriars and get caught red handed
City Thameslink on a Saturday? The barriers are probably wide open
Hopefully they are idiot enough to buy an e-ticket from City Thameslink to Blackfriars and get caught red handed
Sadly so, I did see a few revenue hanging around St Pancras around 07;30 this morning mind.City Thameslink on a Saturday? The barriers are probably wide open
It really bothers me that Elizabeth line doesn’t have automatic announcements for status of interchanging lines like Victoria line does.I travelled on the Elizabeth line to Farringdon this morning. The on board screens and announcements still said to change for trains to Luton and Gatwick, nothing heard from the driver. Also the Barbican end exit from the platforms was also closed with no warning.
You'd have to be cutting it pretty tight for this to cause such a significant issue. Its not that far to walk to St Pancras or alternatively Moorgate for Northern line to there.Someone is going to miss their Eurostar or flight today because of this.
If there is no capability of the PIS to do so, a manual announcement can always be made...
Good prediction: it caught me out today and cost me half an hour.That's going to catch a lot of people out, especially as Farringdon is now such an important interchange.
As I said, TfL trains do this perfectly when it comes to TfL disruption - not so much for NR disruption, and NR trains seem to not really announce anything at all.Take the Victoria Line trains that can announce all sorts of things relating to disruption or planned engineering works, partial closures and more.
Absolutely, especially with it basically being cross-platform.The Thameslink < > Elizabeth Line interchange at Farringdon is one of the most useful rail interchanges in London.
A decision to close a station is never taken lightly - and certainly not taken locally for a planned closure like this.Any decision to close it should not be taken lightly. If there's a serious reason why this closure was unavoidable, it hasn't been communicated. Consequently, rightly or wrongly it feels a lot like a closure for reasons of convenience or cost rather than necessity.
Err... I think you're thinking of the Thameslink - Circle / H&C / Met connection which is cross platform in one direction and nearly so in the other direction; the Elizabeth Line is quite a long way downstairs and at the east end of the station only.Absolutely, especially with it basically being cross-platform.
I find the Sunday and overnight closure of City Thameslink a nuisance as it is better connected by buses than Blackfriars. Many I know who work in the West End and no longer have the overnight Victoria to Croydon service wish Thameslink was only one bus ride away.I guess that’d require a bit too much co-ordination alongside consideration for passengers. Instead, the mitigation is acceptance of paper tickets on the 40 and 63 buses.
City Thameslink will be closed on Sunday, so trains will be fast from Blackfriars through to St Pancras.
You’re probably right. Those who are not familiar with London will on journey planners anyway which will take into account the disruption; those who don’t use journey planners should be familiar with London enough to devise an alternative plan quickly.You'd have to be cutting it pretty tight for this to cause such a significant issue. It’s not that far to walk to St Pancras or alternatively Moorgate for Northern line to there.
Sorry, but this is simply a figment of your imagination based on an uniformed opinion posited by yourself.Closing a station simply because it's too hard to make an onboard announcement on arriving Elizabeth Line trains seems very poor.
They left Farringdon open during the recent LU strike so I doubt the reason for the closure would have been about overcrowding. There were clear measures during that week to prevent overcrowding and a lot of staff including a lot of suits were about.As for Farringdon. The Thameslink platforms are rather narrow at the North/West end so perhaps the way to deal with the extra crowds resulting from no Metropolitain/Circle service is to close the whole lot.
Why aren't suitable announcements made on the Elizabeth Line when the usual connections aren't available, then?Sorry, but this is simply a figment of your imagination based on an uniformed opinion posited by yourself.
I cannot say I have ever noticed this in the past. Indeed, the Central line is closed the weekend after this (31 Jan / 1 Fby) and District line will be stopping at Mile End as usual. But if you have ever seen this in the past, I would say the same principles as above may be relevant.
I may be missing something but where is this stated? The TfL website, 6 month lookahead, and journey planners still says Mile End is open next weekend for District line services, and Mile End is not listed as being closed on the weekly station closure posters.Mile End is closed next weekend, in connection with rail grinding works and Leyton station upgrade works on the Central line.
Oops, my mistake. I was looking at May not February!I may be missing something but where is this stated? The TfL website, 6 month lookahead, and journey planners still says Mile End is open next weekend for District line services, and Mile End is not listed as being closed on the weekly station closure posters.
The District line train I was on this evening said at Aldgate East to “change here for Hammersmith and City line via King’s Cross St Pancras” with no mention of the fact that no such trains are running.It really bothers me that Elizabeth line doesn’t have automatic announcements for status of interchanging lines like Victoria line does.
The Met line service was advertised as resumed from 06:15, so it wouldn’t have been anywhere as near as the full frequency through The City at that time of the day, especially given in the timetable there are quite a lot of trains that start at Baker St (platforms 4,2 and 1) that time of the day.I noticed that Platforms 1 and 4 at Baker Street were being used to reverse the full Met service. Was the entire 16tph being reversed here?