SuspectUsual
Established Member
- Joined
- 11 Jul 2018
- Messages
- 6,671
Something that came up in a conversation with my dad yesterday evening, that both of us vaguely remember but neither of us is sure of.
Does anyone know how the junction to the heart of Wales line was operated back then?
We both vaguely recall (or at least think we do) that trains to and from the branch had to operate the junction points and signals for themselves, from a little ground frame by the end of the platform. So any movement required an additional stop on the branch adjacent to the junction to set or reset (depending on direction) the points for the main line. There must have been communication with the signalman, but we can't remember seeing this
Is that really what happened then? Or are we misremembering? Or did we happen to be there when there was some kind of problem that resulted in a temporary change to ways of working?
Does anyone know how the junction to the heart of Wales line was operated back then?
We both vaguely recall (or at least think we do) that trains to and from the branch had to operate the junction points and signals for themselves, from a little ground frame by the end of the platform. So any movement required an additional stop on the branch adjacent to the junction to set or reset (depending on direction) the points for the main line. There must have been communication with the signalman, but we can't remember seeing this
Is that really what happened then? Or are we misremembering? Or did we happen to be there when there was some kind of problem that resulted in a temporary change to ways of working?
