A normal everyday Set swap.810012 seems to have had its plans for today changed, the 1705 Nottingham has been changed to a 222, with 810012 now destined to Sheffield according to the external destination screen. Does anyone know what happened?
A normal everyday Set swap.810012 seems to have had its plans for today changed, the 1705 Nottingham has been changed to a 222, with 810012 now destined to Sheffield according to the external destination screen. Does anyone know what happened?
810012 terminated at Derby due to problem with the traction equipment.A normal everyday Set swap.
Looks like 810006 has been taken off 1F15 today and the service has been cut short at derby (cancellation code was TB - Train cancelled or delayed at Train Operator’s request), unit has probably returned to Etches. Has there been another issue with 006?
On GWR with Class 8xx they continue to experience failures of the diesel pumps .. So engines get isolated, trains that do run then loose time.Baring in mind a 810 is basically a new train compared to the earlier 8Xx fleet.
What was the 8XX issues when they were first introduced?
Not sure how much of this can be held at Transport UKs door, apart from ordering the trains. But when you order trains like this you expect the builder to be able to deliver. ”Japanese reliability“ etcOn GWR with Class 8xx they continue to experience failures of the diesel pumps .. So engines get isolated, trains that do run then loose time.
Yesterday a class 8xx on a Wigan / Carlisle diverted over the Settle & Carlisle never actually made Carlisle but "gave up" at Hellifield and later returned to Wigan ... Given you most likely need full diesel engine power over the "long drag" .. that could very well of been another diesel pump failure .
And what of this damper fatigue issue that continues to plague class 8xx?
Overall I am not so sure that "new trains" on EMR intercity is going to be quite all EMR are trying to crack up it's going to be .
On a happier note during 2026 the EMR franchise comes to an end so that should mean Transport UK out of the picture .
If you pardon the pun...On GWR with Class 8xx they continue to experience failures of the diesel pumps .. So engines get isolated, trains that do run then loose time.
Yesterday a class 8xx on a Wigan / Carlisle diverted over the Settle & Carlisle never actually made Carlisle but "gave up" at Hellifield and later returned to Wigan ... Given you most likely need full diesel engine power over the "long drag" .. that could very well of been another diesel pump failure .
And what of this damper fatigue issue that continues to plague class 8xx?
Overall I am not so sure that "new trains" on EMR intercity is going to be quite all EMR are trying to crack up it's going to be .
On a happier note during 2026 the EMR franchise comes to an end so that should mean Transport UK out of the picture .
An interesting construction, not seen often. To 'crack up' means to praise or commend.all EMR are trying to crack up it's going to be
Overall I am not so sure that "new trains" on EMR intercity is going to be quite all EMR are trying to crack up it's going to be .
On a happier note during 2026 the EMR franchise comes to an end so that should mean Transport UK out of the picture .
Yes, if there is to be any substantial change I really don't expect it until after GBR is fully operational and has (hopefully) gained a decent amount of independence from and distance from the DfT, so at least the DfT will no longer be micro-managing the railways. And even then of course, GBR will still have the legacy of many of the DfT's decisions for years to come.I fear from reading your posts that you’d be inclined to suggest that the passing of all current franchises (sic) to the DfT Operator will be the solution for everything. It’s important to remember that the DfT have a say in pretty much everything already - the launch of these new trains would look the same even if Transport UK weren’t involved.
I add (sic) after the word franchise with the acknowledgement that the concept of franchises disappeared some years ago now.
Well yes Transport UK were most likely just little more than the facilitator of ordering new trains ...no doubt using a specification prepared by DaFT.... which could very well of been little more than a variation to contract to HitachiSNot sure how much of this can be held at Transport UKs door, apart from ordering the trains. But when you order trains like this you expect the builder to be able to deliver. ”Japanese reliability“ etc
Not wishing to go off topic but phrase probably should read "it's not all it's cracked up to be"? This then means something that falls short of expectation.An interesting construction, not seen often. To 'crack up' means to praise or commend.
Running around with passengers and to the demands of the timetable is going to bring up issues that weren't apparent in the pre-release to the customer testing.aren't new trains supposed to have a period of fault free running before being accepted into service? Something isn't adding up here.
You would think though with the amount of units failed so far, they would need to at least retest them to see what is really going on.Running around with passengers and to the demands of the timetable is going to bring up issues that weren't apparent in the pre-release to the customer testing.
The fault free running isn't really intended to prove that the whole train is completely issue free, more that the traction equipment is sufficiently reliable that it's not going to sit down on every trip because of a silly mistake during construction.
Well, every train introduction comes with issues. Some more than others, true, but overall I think the higher-than-normal failure rate is expected at this time of the process. The failures also don't seem to be serious issues (like the new DLR trains) which would require trains being pulled out of service and retested.You would think though with the amount of units failed so far, they would need to at least retest them to see what is really going on.
810 010 on the 11:32 St Pancras to Sheffield - 30 December 2025 - seemed considerably slower on diesel than usual from most station stops north of Leicester. Can anyone confirm whether it was running with an engine out?
Hmm, that's interesting. It looks as though the degraded performance started as early as the 7:00 Sheffield to St PAncras and persisted throughout the day. The berth timings exiting most of the stations seems to indicate a much more lethargic performance than has been the norm for most 810's on diesel.It had 4L13 in front of it from Leicester, then doesn't really seem to have lost anything despite stopping pretty well everywhere. It did have a reset at Leicester late in the day, but doesn't seem to have any further issues and was kept in service. Usually anything persistent, even one engine out, would see one pulled from service.
A very tiny percent of drivers have trained on them.810008 once again operating today running 3Z01 from Etches to Kettering Stabling Sidings (Schedule: https://live.rail-record.co.uk/train.php/?c=J73080&d=2026-01-04). Wonder why it needs to move from Etches, driver training has been completed no?
So they still have more training to do then, as I noticed they'd stopped doing the weekday 3A__ services that performed the driver training so presumed they'd finished. Does this mean these services are coming back then?A very tiny percent of drivers have trained on them.
If the units passed all the testing, putting them through the exact same testing again will often see them pass again. At this stage in the rollout typically there will be someone on board monitoring the data in addition to being stored for later evaluation. The test programme will be designed to replicate real world as much as possible, but there's limitations what can be done on the network without impacting other services.You would think though with the amount of units failed so far, they would need to at least retest them to see what is really going on.
All those training paths are still in the system, but won't necessarily run all the time. It's common for training to pause over the festive period both due to engineering work and a period of higher leave.So they still have more training to do then, as I noticed they'd stopped doing the weekday 3A__ services that performed the driver training so presumed they'd finished. Does this mean these services are coming back then?
The 810s also had to do a certain amount of fault-free running before being accepted...Railfreight was unhappy with the reliability of its locos. and had a project team for replacements. They emerged as the Class 60.
When the locos. were handed over, they were put into service. An hours counter was started. If they failed by not conforming to the performance specification the counter was reset to zero and it stated again.
There was an agreed number of fault-free hours which, when achieved, only then resulted in the loco. builder being paid. It focussed the minds.
I don't understand why something similar can't be used for passenger trains, particularly bearing in mind that it's mainly tax-payers that are stumping up the costs.