A Derby loco move is due to arrive at Ely on Wednesday, which could be ahead of a 175 drag (there is already what looks like a Networker scrap drag in earlier on this day so I can see this specific loco move being for that).

Path is activated but no gen on consist yet.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,591
Location
Llanharan
If it runs, lets hope more than one unit.
Looks to have been manually activated rather than the doomed 1 hour auto activation, should be running! Fingers crossed for more than 1 unit! (I'm hoping 113, no bias on it being my favourite of the Class I swear ;))
 

ThatBloke

On Moderation
Joined
29 Nov 2025
Messages
73
Location
SNE
That is assuming all of the little faults on each of the units have been rectified, in order to be allowed into Passenger Service.
That is a very important assumption in respect of any maintenance backlog and outstanding repairs, which may not all be 'little' to make the 175 units fit and safe for service.
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,106
Location
West Wiltshire
006+011 Quoted for the Laira move
I think situation is now :

Wolverton currently has 10 units, some have been there months
175 (no 2 car units)
175 101, 102, 106, 107, 108, 111, 112, 113, 115, 116 (10 x 3 car)

Laira now has 4 sets that have passed through Wolverton & 4 training sets
175 001, 003, 006, 011 (4 x 2car with Wolverton updates)
175 002, 007, 009 (3x2 car for training)
175 114 (1x3car for training).

Still stored at Ely 8 units
175 004, 005, 010 (3 x 2car)
175 103, 104, 105, 109, 110 (5 x 3car)
and 175008 which is not formed as a unit

So only 8 of 68 vehicles (just 11.8%) have been through Wolverton
 

ThatBloke

On Moderation
Joined
29 Nov 2025
Messages
73
Location
SNE
I think situation is now :

Wolverton currently has 10 units, some have been there months
175 (no 2 car units)
175 101, 102, 106, 107, 108, 111, 112, 113, 115, 116 (10 x 3 car)

Laira now has 4 sets that have passed through Wolverton & 4 training sets
175 001, 003, 006, 011 (4 x 2car with Wolverton updates)
175 002, 007, 009 (3x2 car for training)
175 114 (1x3car for training).

Still stored at Ely 8 units
175 004, 005, 010 (3 x 2car)
175 103, 104, 105, 109, 110 (5 x 3car)
and 175008 which is not formed as a unit

So only 8 of 68 vehicles (just 11.8%) have been through Wolverton

At only approximately 12% complete, Angel Trains and their contractor at Wolverton still have a lot of work to do to get those units in an acceptable condition for GWR.
 

berneyarms

Established Member
Joined
26 Nov 2013
Messages
3,111
Location
Dublin
I think situation is now :

Wolverton currently has 10 units, some have been there months
175 (no 2 car units)
175 101, 102, 106, 107, 108, 111, 112, 113, 115, 116 (10 x 3 car)

Laira now has 4 sets that have passed through Wolverton & 4 training sets
175 001, 003, 006, 011 (4 x 2car with Wolverton updates)
175 002, 007, 009 (3x2 car for training)
175 114 (1x3car for training).

Still stored at Ely 8 units
175 004, 005, 010 (3 x 2car)
175 103, 104, 105, 109, 110 (5 x 3car)
and 175008 which is not formed as a unit

So only 8 of 68 vehicles (just 11.8%) have been through Wolverton
I don’t think sets 006 and 011 have made it to Laira from Wolverton - wasn’t that the move that was cancelled this week?
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,260
Location
Paignton
Just watched through Dawlish Cams 45 minutes early. Two 2 car units. I meant to post this yesterday; still on my laptop.


== Doublepost prevention - post automatically merged: ==

I don’t think sets 006 and 011 have made it to Laira from Wolverton - wasn’t that the move that was cancelled this week?
 

berneyarms

Established Member
Joined
26 Nov 2013
Messages
3,111
Location
Dublin
Just watched through Dawlish Cams 45 minutes early. Two 2 car units. I meant to post this yesterday; still on my laptop.


== Doublepost prevention - post automatically merged: ==


Thanks for that!
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,035
Location
81D & 81E
Just to be clear, what's the current estimated/expected date for the start of entry-to-service of Class 175 with Great Western Railway?
The 175 traction diagrams start from Sunday 14th.

For the week commencing Monday 15th December the only booked passenger workings are:

175/0
2C26 13:40 Plymouth - Penzance
2P21 15:52 Penzance - Plymouth

175/1
No booked workings.
 

Siemens Staines

Established Member
Joined
30 Jul 2015
Messages
1,502
The 175 traction diagrams start from Sunday 14th.

For the week commencing Monday 15th December the only booked passenger workings are:

175/0
2C26 13:40 Plymouth - Penzance
2P21 15:52 Penzance - Plymouth

175/1
No booked workings.

Thank you for this. Do you know what is booked for 2C00/2E06/2C20/2P20 & 2P05/2C11/2P16 that have also been mentioned on another forum as booked 175 from next week. I suspect the difference being they were LTP diagrams and this one that remains is after STP has been applied?
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
607
Location
Hull
At only approximately 12% complete, Angel Trains and their contractor at Wolverton still have a lot of work to do to get those units in an acceptable condition for GWR.
In the March GWR press release it did state the full fleet wouldn't be in service until "the end of next year", so no rush to get them out of Ely/Wolverton.

"https://news.gwr.com/news/class-175...ailway-improve-reliability-across-the-network" - Great Western Railway (GWR) will welcome 26 Class 175 trains to its fleet..... . The 10 two-car trains and 16 three-car trains are expected to start to enter service in Devon and Cornwall later this year, with the entire fleet expected to be operational from the end of next year.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
In the March GWR press release it did state the full fleet wouldn't be in service until "the end of next year", so no rush to get them out of Ely/Wolverton.
Not that big a rush for the entire fleet, agreed; but if the last of the Castle HSTs are to be stood down NOW that is quite a big loss of capacity. Assuming that GWR are going to be losing 3x4-coach sets of mark 3s (I can't remember how many Castle sets are left, think I read 3 sets somewhere) then the rush is for at least six (2-car) class 175s to be ready for service just to replace lost capacity ASAP.
 

Bob85

Member
Joined
17 Jul 2024
Messages
26
Location
England
There are now 8 175s at Laira (4 refurbished) so the HSTs three diagrams can be covered.
What has the refurbishment involved? Will there be a repaint before entry into service?
If yes, will they even be able to get any 175s in this year?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,361
Location
Somerset
Not that big a rush for the entire fleet, agreed; but if the last of the Castle HSTs are to be stood down NOW that is quite a big loss of capacity. Assuming that GWR are going to be losing 3x4-coach sets of mark 3s (I can't remember how many Castle sets are left, think I read 3 sets somewhere) then the rush is for at least six (2-car) class 175s to be ready for service just to replace lost capacity ASAP.
Though the chances are that for the next 4 months or so 4 coaches on the majority of the HST operated services is overkill. What is definitely needed is something to fill 3 diagrams.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
607
Location
Hull
Not that big a rush for the entire fleet, agreed; but if the last of the Castle HSTs are to be stood down NOW that is quite a big loss of capacity. Assuming that GWR are going to be losing 3x4-coach sets of mark 3s (I can't remember how many Castle sets are left, think I read 3 sets somewhere) then the rush is for at least six (2-car) class 175s to be ready for service just to replace lost capacity ASAP.
It's mentioned in post #1783 there's only one simple out and back run/diagram to cover next week so the four "updated" units GWR have should be able to cover that, they will not be running four car 175's on all the current three HST diagrams in the near future if ever.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,361
Location
Somerset
It's mentioned in post #1783 there's only one simple out and back run/diagram to cover next week so the four "updated" units GWR have should be able to cover that, they will not be running four car 175's on all the current three HST diagrams in the near future if ever.
Though this of course implies that coverage for two diagrams will have to sources from what is already an overstretched fleet.
 

paulwestwood

Member
Joined
11 Nov 2012
Messages
102
On today's training runs, the team that deal with the onboard Passenger Information System, were onboard 175003 & then 175001 ensuring that it was working correctly, so that they can enter service. Although there were some other faults with them will need sorting ready for service entry. Both sets worked the stopping patterns without much issue, although as the day went on the wheelslip system got a tryout when pulling away from stations
 

150249

Established Member
Joined
13 Dec 2021
Messages
1,241
Location
The better Devon city
What has the refurbishment involved? Will there be a repaint before entry into service?
If yes, will they even be able to get any 175s in this year?
If the 175s require a repaint before entry into service, it would be impossible to get any working this year. You can't repaint a train in 3 days.
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,260
Location
Paignton
If the 175s require a repaint before entry into service, it would be impossible to get any working this year. You can't repaint a train in 3 days.
Why repaint? GWR will come under Great British Railways soon and their colour scheme, so no point.
 

Rich McLean

Established Member
Joined
6 Feb 2012
Messages
1,757
Thank you for this. Do you know what is booked for 2C00/2E06/2C20/2P20 & 2P05/2C11/2P16 that have also been mentioned on another forum as booked 175 from next week. I suspect the difference being they were LTP diagrams and this one that remains is after STP has been applied?

Appears to be 2 car Class 150s (or a 2 car 158). Schedules altered for 75mph operation. I am sure someone else will confirm.
 

northernbelle

Member
Joined
10 Oct 2018
Messages
768
The 175 traction diagrams start from Sunday 14th.

For the week commencing Monday 15th December the only booked passenger workings are:

175/0
2C26 13:40 Plymouth - Penzance
2P21 15:52 Penzance - Plymouth

175/1
No booked workings.
This will commence, as you say on the 15th.

This diagram will then revert to other traction for the Christmas period, commencing 22nd Dec, until 5th Jan when it moves to 175 traction permanently.
 

northernbelle

Member
Joined
10 Oct 2018
Messages
768
What has the refurbishment involved? Will there be a repaint before entry into service?
If yes, will they even be able to get any 175s in this year?
It's work to make them operational, such as systems and mechanical work.

The cosmetic work won't happen until after entry into service, so they will go into traffic in TfW colours with interior labelling changed to GWR where essential.
 