Leeds station improvement updates

43367

Member
Joined
16 Jan 2014
Messages
103
The escalators on platforms 6/8 are the wrong way round, the one on platform 8 should go down and the one on platform 6 should go up. At present passengers going up the escalator walk right into the path of passengers coming from platforms 9-17.
If they were swapped passengers going up from platform 8 would be on the outside track avoiding passenger from 9-17 should could use the inside track, rather than having to cross over as the do now.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

anothertyke

Member
Joined
23 Jun 2023
Messages
380
Location
Leeds
The escalators on platforms 6/8 are the wrong way round, the one on platform 8 should go down and the one on platform 6 should go up. At present passengers going up the escalator walk right into the path of passengers coming from platforms 9-17.
If they were swapped passengers going up from platform 8 would be on the outside track avoiding passenger from 9-17 should could use the inside track, rather than having to cross over as the do now.
Wouldn't that mean swapping the entry and exit gates which would have consequences for the exit flow from Pls 0 to 6? I suspect there are no good solutions on that plaza.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,697
Location
Leeds
Wouldn't that mean swapping the entry and exit gates which would have consequences for the exit flow from Pls 0 to 6? I suspect there are no good solutions on that plaza.
The current gate configuration dates from the pandemic, to keep people apart. Previously, the centre block of gates had been exits, with the 25% or so either side as entry gates.

Before the southern entrance opened they evaluated the ped flow and left it as it was. I think the idea is that you start left and keep left after turning, which is where the steps down to the platforms are. Unfortunately, the steps down come after the escalators up, so you end up on the right trying to get around them.
 

43367

Member
Joined
16 Jan 2014
Messages
103
Wouldn't that mean swapping the entry and exit gates which would have consequences for the exit flow from Pls 0 to 6? I suspect there are no good solutions on that plaza.
Am sure the direction of the gates can be changed as required, on a morning there are more used for exit, so swapping them round is just a matter or pressing a few buttons on the controlling screen
 

anothertyke

Member
Joined
23 Jun 2023
Messages
380
Location
Leeds
Am sure the direction of the gates can be changed as required, on a morning there are more used for exit, so swapping them round is just a matter or pressing a few buttons on the controlling screen
My point was not about the gates themselves but about managing the exit flows from Pls 0-6 and 8-17. I wonder if it is possible to have two banks of exit gates to left and right with the entry gates in the middle. I think the flow management is a tricky problem.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,803
It isn't so much the flow of passengers that is the problem, it is the blockade formed by those stood staring at the boards waiting for the platform of the next LNER to be announced.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,663
Location
West Riding
Interestingly, today Northern are using P16 to have a 4 carriage 158 formation on Nottingham-Sheffield-Leeds services. Makes you question why they can’t do it as standard?

XC also have some strong formations through Leeds today.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,925
Location
West Yorkshire/Tuscany
Interestingly, today Northern are using P16 to have a 4 carriage 158 formation on Nottingham-Sheffield-Leeds services. Makes you question why they can’t do it as standard?

XC also have some strong formations through Leeds today.
Can they fit in their turnarounds between the Eastbound TPE services?
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,697
Location
Leeds
Where are they putting the Knottingleys?
A couple of weeks ago some of the Knottingleys were doubled as well. I wonder if there's engineering work somewhere so that there's fewer TPE services around on Saturdays to use platforms 15 & 16?
 

1D53

Established Member
Joined
2 Apr 2006
Messages
2,885
You can only get 4 cars on the Nottingham by moving the Knottingley to 13, doing so means retiming them to be after the 2Jxx leaves which in turn reduces the turnaround so it's is often bare minimum or not compliant with the Train Planning Rules. Some of the Knottingley are booked 4 anyway so already have this move to 13 so it's easier to make the respective Nottingham diagrams 4 car. However as there is something like 9 diagrams across the Leeds - Nottingham - Leeds - Lincoln - Leeds circuit there isn't the units to make many 4 cars.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,244
Location
Yorks
The 10:49 Leeds to Carlisle reduces to two carriages around this time of year, so I expect that's one source of the spare units.
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,260
Location
North West
Presumably the new Greggs inside the station will be charging circa 50p extra per item more than the two existing outlets just outside the station …?
They might. When I worked near Manchester Victoria I noticed the prices a bit higher at the station branch than outside.
 

ChrisC

Established Member
Joined
7 Oct 2018
Messages
2,251
Location
Nottinghamshire
Interestingly, today Northern are using P16 to have a 4 carriage 158 formation on Nottingham-Sheffield-Leeds services. Makes you question why they can’t do it as standard?
Thats good to hear. Some of the Leeds-Sheffield-Nottingham trains are very overcrowded on Saturdays both north and south of Sheffield. Hopefully the situation between Sheffield and Nottingham on Saturdays mornings will be improved as the new timetable restores a mid morning EMR train which has been missing from the timetable since Covid.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,663
Location
West Riding
Thats good to hear. Some of the Leeds-Sheffield-Nottingham trains are very overcrowded on Saturdays both north and south of Sheffield. Hopefully the situation between Sheffield and Nottingham on Saturdays mornings will be improved as the new timetable restores a mid morning EMR train which has been missing from the timetable since Covid.
I caught a Northern 4-car service yesterday and it was still very busy even as 4 carriages. It would undoubtedly have left people behind if it was 2 carriages. It also ended up going into P17 which caused chaos on that platform which can’t cope with such a volume of passengers.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
Many Sunday Leeds Nottinghams are four cars and have been for at least 5 years, additional platform capacity in Leeds allows it.
 

J-2739

Established Member
Joined
30 Jul 2016
Messages
2,237
Location
London
Many Sunday Leeds Nottinghams are four cars and have been for at least 5 years, additional platform capacity in Leeds allows it.
Though this additional capacity is from another platform altogether, not platform 17, right?
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,663
Location
West Riding
…On a related note, Holbeck depot seems to be being upgraded, and more sidings seems to have appeared on the opposite side of the access points to the depot.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,842
…On a related note, Holbeck depot seems to be being upgraded, and more sidings seems to have appeared on the opposite side of the access points to the depot.
I think the ones you are referring to are the Annex roads - they have been there for a long time, the change is that a fence has been removed so they are more visible now.

There are additional roads going in across from the fuel point as well as a lot of other upgrade works.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
I think the ones you are referring to are the Annex roads - they have been there for a long time, the change is that a fence has been removed so they are more visible now.

There are additional roads going in across from the fuel point as well as a lot of other upgrade works.
All of which are doubtless in advance of the great Neville Hill shutdown for TRU...
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,697
Location
Leeds
What's happening with the BAM compound? We "railway neighbours" haven't been informed of any noisy work over Christmas, and the signs they've put up just seem to be the usual site safety ones.
 

mm333

Member
Joined
28 Aug 2008
Messages
776
Location
53.8331°N 1.7734°W
Regarding the escalator, at a certain point, you have to wonder if there is a secret plot to increase the exercise of the railway users.

I can certainly imagine that if the LNER services departed from platforms that required using the bridge that it would have been permanently fixed many many months ago ;)

Exhibit A this morning: The 0946 to London comes in from Neville Hill and is booked from platform 9. There was probably about 8-10 people plus luggage queueing for the lift on platforms 6-8 so - with only a few minutes to make my connection - I lugged my luggage up the stairs.
 

Freemo

Member
Joined
19 Dec 2019
Messages
94
Location
Sheffield
Exhibit A this morning: The 0946 to London comes in from Neville Hill and is booked from platform 9. There was probably about 8-10 people plus luggage queueing for the lift on platforms 6-8 so - with only a few minutes to make my connection - I lugged my luggage up the stairs.
I have not found it uncommon at Sheffield when travelling with luggage for the only lift to the footbridge from the foyer to not be working at all, with no escalators either.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,244
Location
Yorks
I still don't understand why they can't just reverse the down escalator and have it as the up escalator while the works go on.
 

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,311
I still don't understand why they can't just reverse the down escalator and have it as the up escalator while the works go on.
Agreed. But don’t worry.This week I noticed a sign on the hoarding by the escalator saying that the job would be finished by November.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,268
Location
East Midlands
I still don't understand why they can't just reverse the down escalator and have it as the up escalator while the works go on.
Can't locate it at present but I think I read here that some types of escalators can't be set to reverse operation apart from some sort of emergency mode (presumably ultra slow or something).
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,244
Location
Yorks
Can't locate it at present but I think I read here that some types of escalators can't be set to reverse operation apart from some sort of emergency mode (presumably ultra slow or something).

Oh that's interesting. I assumed they were all like LU.
 