Severn Tunnel Closure Summer 2026

rubin

On Moderation
Joined
23 Mar 2024
Messages
19
Location
bristol
I noticed on GWR website that there'll be rail improvement work between Bristol to South Wales between 18-May and 15-June?!

That is much longer than expected as I remembered only 2 weeks (or shorter) in recent years. I can't imagine they'll close it for 4 weeks! Maybe I am overreacting as it is showing tbc for this..
Track renewal and maintenance work will affect train services via the Severn Tunnel. As a result, there will be no direct trains between Bristol and South Wales on these dates:

Services between Cardiff Central and Portsmouth Harbour start/terminate at Bristol Parkway
Services between Cardiff Central and Taunton or Exeter St Davids start/terminate at Bristol Temple Meads

Monday 9 to Saturday 14 June, plus Monday 16 to Friday 20 June

Customers travelling between Bristol and South Wales should change at Gloucester or Cheltenham Spa, where trains will still be running to/from South Wales.

Trains between London and South Wales will use an alternative route between Swindon and Newport – stopping at Gloucester instead of Bristol Parkway.

A limited train service will still run between London Paddington and Bristol Parkway....

1764588762928.png
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,585
Location
Northampton
I noticed on GWR website that there'll be rail improvement work between Bristol to South Wales between 18-May and 15-June?! That is much longer than expected as I remembered only 2 weeks (or shorter) in recent years. can't imagine they'll close it for 4 weeks! Maybe I am overreacting as it is showing tbc for this..
It's posible that there will be preliminary and follow up work either side of the complete closure that won't close the route but would still be disruptive (such as being mainly overnight, affecting late and early trains).
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,491
Location
Taunton or Kent
According to GWR, this has been condensed to close from Saturday 23rd May-Monday 8th June:


Overhead power supply upgrades and track renewal work will impact all train services via the Severn Tunnel.

Replacement road transport is planned between Bristol Parkway and Newport – both non-stop and stopping services.

In addition, valid rail tickets can also be used to travel on the m4 Metrobus services running between Bristol Parkway and Patchway.

Trains will run hourly between London Paddington and Swansea/Carmarthen by using an alternative route – stopping at Gloucester instead of Bristol Parkway.

Trains will also run between London Paddington and Bristol Parkway at peak periods only – customers should travel via Bristol Temple Meads instead at off-peak times.

GWR trains will operate between Bristol Parkway and Portsmouth Harbour on the weekend of 23/24 May, plus from Saturday 30 May to Monday 8 June.

These services will be operating between Bristol Parkway and Fareham instead from Monday 25 to Friday 29 May – see Portsmouth area entry below.

GWR trains will also operate between Bristol Temple Meads and Taunton/Exeter St Davids.

CrossCountry and Transport for Wales train services between Cheltenham Spa or Gloucester and Cardiff Central via Lydney will be unaffected.

Sunday 24 May

There will be no direct train services between London and South Wales.

Instead, GWR will operate trains between London Paddington and Bristol Parkway, plus between Newport and Swansea/Carmarthen.

Important to note

Some train services between Bristol Temple Meads and Severn Beach will run to an amended timetable due to freight trains for Avonmouth being diverted on this route.

The corrosion of kit in the tunnel must be pretty bad if this is subject to annual closures for at least a fortnight (unless this time the main works are on the approaches).
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,874
Location
Newport
The corrosion of kit in the tunnel must be pretty bad if this is subject to annual closures for at least a fortnight (unless this time the main works are on the approaches).
Rail life in the tunnel was always a fraction of life expectancy elsewhere. Similarly, when the tunnel had a tell-tail wire its fittings were an endless problem causing frequent failures and big delays.
 

Sealink

Member
Joined
16 Aug 2006
Messages
882
Location
Bridport
Isn't this the tunnel that was featured on a television programme (can't remember if was Michael Portillo's or not) where there is an absolute torrent of water being pumped out daily?
 

bleeder4

Member
Joined
19 Jan 2019
Messages
792
Location
Worcester
I believe about 50 million litres of water gets pumped out each day. If the pumps were switched off the whole tunnel would be flooded within half an hour.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,962
Good news that they're planning on running replacement buses between Bristol Parkway and Newport this time.
 

father_jack

Established Member
Joined
26 Jan 2010
Messages
1,557
Good news that they're planning on running replacement buses between Bristol Parkway and Newport this time.
It was morning and evening peaks last time due to issues getting vehicles and drivers but supply appears to be better this time around.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
The BBC have picked this up now. https://www.bbc.co.uk/news/articles/c8r838el4yzo

Weeks of disruption for passengers on one of UK's busiest rail lines​

People travelling on one of the UK's busiest rail lines face weeks of disruption as engineers replace overhead power lines that corrode quicker than any other part of the network.

The Severn Tunnel, which connects south Wales with London and Bristol, will shut for 16 days from Saturday as workers fit a pioneering copper power line inside what was once the world's oldest underwater rail tunnels.

"A pioneering copper power line?" I thought that some sort of an inverted conductor rail had been installed as it would have been more robust, but perhaps that was somewhere else.
and how can it have been "once the worlds oldest rail tunnel?" Has someone dug an older one? Maybe an even older one has been reopened so this was actually "Once the world's oldest tunnel still in use!".
 

JonesR04

New Member
Joined
17 Nov 2025
Messages
1
Location
Cardiff
The BBC have picked this up now. https://www.bbc.co.uk/news/articles/c8r838el4yzo


"A pioneering copper power line?" I thought that some sort of an inverted conductor rail had been installed as it would have been more robust, but perhaps that was somewhere else.
and how can it have been "once the worlds oldest rail tunnel?" Has someone dug an older one? Maybe an even older one has been reopened so this was actually "Once the world's oldest tunnel still in use!".
The caption for the video describes the tunnel as once the longest underwater rail tunnel in the world therefore I suspect someone’s swapped longest for oldest without anyone else noticing!
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,874
Location
Newport
"A pioneering copper power line?" I thought that some sort of an inverted conductor rail had been installed as it would have been more robust, but perhaps that was somewhere else.
Might there be any ferrous fittings that are failing? Pre-cab radio days the tunnel had tell tale wires fixed to the walls and they were a nightmare to maintain and frequently got damaged by renewals teams using them to hang lighting.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
Might there be any ferrous fittings that are failing? Pre-cab radio days the tunnel had tell tale wires fixed to the walls and they were a nightmare to maintain and frequently got damaged by renewals teams using them to hang lighting.
That BBC article includes the quote
Network Rail said the new system "eradicates the failure mechanisms of the past by providing complete separation of bimetallic elements and using a copper contact wire which improves current collection" from overhead wires by trains.
which is as clear as mud! Maybe they have devised a suspension system for the (normal) copper contact wire which doesn't have the aluminium or the steel of the recent WCML upgrades (or insulators which separate them electrically) - It's noticeable that some of the Railtrack-era stuff is looking very rusty already. I'm wondering when one will rust through and give way.

Some of the original WCML electrification supports are still working well, they are very obvious (bright green because the BR corrosion specialists devised copper-clad steel tubing) and have never given any problems that I have heard of.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,874
Location
Newport
Some of the original WCML electrification supports are still working well, they are very obvious (bright green because the BR corrosion specialists devised copper-clad steel tubing) and have never given any problems that I have heard of.
The ‘hole’ has unique atmospheric conditions that are very corrosive, but I’ve never heard it explained in terms of its chemistry. Rail life down there is a fraction of its equivalent outdoors.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
BBC was not strictly correct about 16 days, it's actually 17 if include Monday morning and following Sunday morning.

What they didn't pick up on was Cardiff -Portsmouth trains are also suspended at Portsmouth end for 5 days during the closure. Or that when the London - South Wales trains do restart via tunnel, will only work for 4 weeks before a month long thinning out and diversion via Bath
 

stuving

Member
Joined
26 Jan 2017
Messages
734
This is Network Rail's explanation,. which makes a little more sense:

Innovative Severn Tunnel upgrade to transform key rail link between South Wales and England​

Region & Route: Wales & Western: Wales & Borders
Passengers are advised to plan ahead as Network Rail carry out major upgrade in the Severn Tunnel and Bristol area, with replacement buses and diversionary routes in place to keep people moving from late May to early June.

This vital project will see Network Rail, and contractors ARQ, complete the transformation of the Severn Tunnel’s overhead power system, designed specifically to withstand the tunnel’s harsh, corrosive environment - making it more resilient, reducing the frequency of maintenance, and helping to minimise disruption for passengers.

The work will take place around the clock from Saturday 23 May until the early hours of Tuesday 9 June, with the railway closed between Newport and Bristol Parkway during this time.

The new system

Running beneath the Severn Estuary, the 4.35-mile Severn Tunnel is one of the toughest environments on the UK rail network, where moisture and saltwater accelerate wear on equipment.

Since electrification, the overhead power system has been prone to corrosion and electrical wear, leading to more frequent maintenance.

To address this, Network Rail’s Wales and Borders team has developed and successfully trialled an innovative new system. It uses a single 7km copper contact wire supported at regular intervals by modified bridge arms, to eliminate previous corrosion issues and improve performance.

Engineers will now install this system along the full length of the tunnel - using a world-first approach on this scale - to create a more resilient railway and reduce the need for frequent maintenance.

The programme of work involves:
  • Replacing 838 bridge arms that support the overhead electric wires in the Severn Tunnel
  • Renewing 9,000 metres of overhead wiring in the Severn Tunnel
  • Carrying out track and infrastructure upgrades, and drainage works in the Bristol and Patchway areas.
Alongside the tunnel work, Network Rail will also carry out improvements in the Bristol area, including upgrades to the railway serving the new Bristol Brabazon station on the former Filton airfield site. The station is due to open in the autumn and will bring passenger services back to the Henbury line for the first time since 1964.
The last I heard was when the OLE went into use, using the roof-fixed bar (Furey+Frey's ROCS) but with the copper conductor wire usually clamped to its underside replaced by Al alloy one to reduce corrosion. It looks as if they have decided the alloy bar is more trouble than it's worth, and have devised a compact registration arm system to replace it. I'm assuming that "replacing 838 bridge arms" should not be understood literally to mean there are registration arms already - or have I missed something?

Third time lucky?
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
The BBC have picked this up now. https://www.bbc.co.uk/news/articles/c8r838el4yzo
"A pioneering copper power line?" I thought that some sort of an inverted conductor rail had been installed as it would have been more robust, but perhaps that was somewhere else.
and how can it have been "once the worlds oldest rail tunnel?" Has someone dug an older one? Maybe an even older one has been reopened so this was actually "Once the world's oldest tunnel still in use!".
The contact interface between the rigid beam conductor rail and the pantograph is usually a normal OHLE conductor wire run (with a figure 8 cross-section) but it’s clamped into the split beam. As ‘seen’ by a passing pantograph, it’s a fixed conductor just like everywhere else, but it doesn’t lose its alignment.
 

halfajob

Member
Joined
23 Jun 2025
Messages
39
Location
West Country
Driving through the tunnel is a sight to behold. The amount of sparks coming off of the ole reminds me of bonfire night. You can fully understand why they need to do this work each year. Is it more of a sticking plaster than spend money to have a new tunnel?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
Driving through the tunnel is a sight to behold. The amount of sparks coming off of the ole reminds me of bonfire night. You can fully understand why they need to do this work each year. Is it more of a sticking plaster than spend money to have a new tunnel?
I expect the cost of replacing gets nowhere near the cost of offsetting a new tunnel for another 50 years.
 

sh24

Established Member
Joined
28 Sep 2023
Messages
1,500
Location
London
£10s of millions on repairs and maintenance v £10 billion (finger in air) for a replacement tunnel. I think we know how that argument goes, especially after recent electrification programmes and HS2 has trashed rails reputation with the Treasury.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,680
Location
Nottingham
I'm assuming that "replacing 838 bridge arms" should not be understood literally to mean there are registration arms already - or have I missed something?
There would have to be some sort of arm that holds the contact rail far enough below the roof of the tunnel so the pantograph won't scrape it. Presumably these are being replaced by more conventional registration arms to hold a copper wire, perhaps using the same fixing holes?
 

stuving

Member
Joined
26 Jan 2017
Messages
734
There would have to be some sort of arm that holds the contact rail far enough below the roof of the tunnel so the pantograph won't scrape it. Presumably these are being replaced by more conventional registration arms to hold a copper wire, perhaps using the same fixing holes?
"Bridge arm" is a standard term in Series 1, for a compact registration arm to be fitted in the confined space under a bridge. Like any other registration arm it cannot support any weight; it is free to move vertically. I'm assuming the term is used in that sense by NR in that press release.

The ROCS beam must be held up by some kind of brackets, but I see no reason to call those "bridge arms". Tunnel brackets, more like. I think there were pictures of that ... somewhere.
 

Mile Post 13

Member
Joined
20 Jun 2024
Messages
27
Location
Near a proper PSB
Yes - it's fresh water from an underground river.
The water arrives from an aquifer in Belgium and is sold back to Stella Artois for making lager

== Doublepost prevention - post automatically merged: ==

"Bridge arm" is a standard term in Series 1, for a compact registration arm to be fitted in the confined space under a bridge. Like any other registration arm it cannot support any weight; it is free to move vertically. I'm assuming the term is used in that sense by NR in that press release.

The ROCS beam must be held up by some kind of brackets, but I see no reason to call those "bridge arms". Tunnel brackets, more like. I think there were pictures of that ... somewhere.
The ROCS system is supported by specific registration assemblies. Here are some photographs of the equipment installed in the Severn, Patchway, and Chipping Sodbury tunnels

== Doublepost prevention - post automatically merged: ==

This is Network Rail's explanation,. which makes a little more sense:

The last I heard was when the OLE went into use, using the roof-fixed bar (Furey+Frey's ROCS) but with the copper conductor wire usually clamped to its underside replaced by Al alloy one to reduce corrosion. It looks as if they have decided the alloy bar is more trouble than it's worth, and have devised a compact registration arm system to replace it. I'm assuming that "replacing 838 bridge arms" should not be understood literally to mean there are registration arms already - or have I missed something?

Third time lucky?
The Conductor rail system was never the correct solution for the tunnel and within months of installation the copper contact wire was being forced out of the jaws by a build up of corrosion caused by water ingress and interaction with the grease used between the aluminium rail and the contact wire.

The aluminium solution started life as a "throw away joke comment" by one of the engineers but was taken on board and championed by someone who knew nothing about OHL but considered themselves to know better. This is why the aluminium solution was installed.

The correct solution in the Severn Tunnel (which was favoured by many senior OHL engineers) would have been a fixed tension copper based installation however reversing the ROCS solution would have been too embarrassing for a number of people.
 

Attachments

  • DSC01303A.JPG
    DSC01303A.JPG
    875.2 KB · Views: 67
  • DSC01305A.jpg
    DSC01305A.jpg
    748.5 KB · Views: 67
  • DSC01307A.jpg
    DSC01307A.jpg
    676.7 KB · Views: 67
Last edited:

Top